Loading...
HomeMy WebLinkAboutGREENBRIAR VILLAGE PUD - Filed CS-COMMENT SHEETS - 2004-08-09/9-93A G E,�aQr�e i�/LCNGL�- PRAEGM A�b FiAIAL ;, �/L57o ✓ �S/G AJ OF /�mo �4/�� IN/M✓M .D BAn LoAO GU 1ig� �8� Y I, 7TA765 -AA O� �fB00wlsg PmSS/bLA Notes P�2e4.2 2eA„✓�5 %tiEcomme yDE D Pty¢ d' G/tira. PAN ,li �i�47 J/Qo%�cat�crt- 9c.ccPfance ��y err e{6nyr. Yb C�ryE../c2, WNEP-E , 4-E FZANs � /'2ofILES ? �E7AILs ? X-sscrz� �ioaM .�QArIvAUG �Pepo QT /Uh$ /N oDP �I LE. CC�iJA?E2L 5.6GUER. - Ju3 .liRhruS - 5r?fE67- ZIAAnIA.I& dU,BMrT TAL //JADEEQN/9TE 6. Public service Company of Colorado states that the developer's architect had indicated in telephone conversations that there would be an unobstructed 15' utility easement around the outside perimeter of this project. The Site and Landscape Plans indicate that in some cases building envelopes extend to within 30' of the property boundary and that patios extend even beyond the building envelopes. Proposed trees will also obstruct, use of this space for multiple utility lines. Front building setbacks from the rear of the sidewalks fail to meet the 15' specification required to install both electric and natural gas facilities behind sidewalks as is normally done. Installation of electric and/or natural gas lines in paved areas may be a required option. Utility easements as proposed on the subdivision plat are inadequate. 7. City Light & Power states that the Site Plan shows the location of a street light on the north side of Butch Cassidy Court, just east of Building #6. The Landscape Plan shows a couple of street trees that appear to be too close to the light. Street trees must be a minimum of 401, horizontally, from a light pole. 8. The Water/Wastewater Department states that a utility plan must be submitted to and approved by the City. 9. The Poudre Fire Authority has the following comments: a) The Phase One parking lot does not provide 20, inside and 40' outside turning radius. b) Both sides of the Phase One parking lot, at the ends of the center parking, must be signed "No Parking - Fire Lane" with approved signs and the curbs painted red. An unobstructed 20' wide drive lane must be provided. c) The Phase One parking lot must be included in a public access easement. 10. A copy of the stormwater Utility's comments is attached to this letter. It appears that the drainage information submitted is not sufficient for a combined Preliminary 8 Final review. 11. Parkland fees of $625 per dwelling unit will apply for all residential development and be collected at the time of issuance of building permits. 12. There is an 18' drive width around the island in the cul-de- sac at the end of Butch Cassidy Court. The City standard is a 28' width in this situation. The City is discouraging the use of the center island. 13. Utility easements for this phase do not appear to be adequate, and the subdivision plat does not provide for any public access to the parking lots. 14. The City Transportation Division has not completed their review of this request yet, due to the late submittal (April 15, 1993) of the traffic study. I have not yet received comments from them but it is possible that it might be necessary to connect Butch Cassidy Court to Greenbriar Circle to the east. Questions pertaining to the traffic issues should be directed to Rita Davis. She can be reached at 221-6608. 15. A copy of the Engineering Department's comments is attached to this letter. The utility plans as submitted are not adequate for a combined Preliminary 6 Final review. Staff feels that this project can move ahead as a Preliminary review only, with the Preliminary going to the Planning and Zoning Board on May 24, 1993. 16. Planning comments: a) There is no fencing indicated on the Site Plan or the Landscape Plan. Fencing is shown on the "Typical Planting Detail". Will there be perimeter fencing or fencing around the patios? If so, it should be identified. b) Will the Garden Areas have access to water connections? c) The sidewalk should be connected to the existing sidewalk on the north side of Butch Cassidy Court. d) Elevations for all four sides of the buildings is needed. The elevations must identify the proposed height of the buildings, the materials, colors, etc. e) What will be the groundcover treatment on the "back" sides of the buildings? The "Typical Planting Detail" should include labeling of the plantings and treatment. f) The Site Plan should identify when the phase with the clubhouse will be built. g) The materials and colors for the trash enclosure should be included on the Site Plan. Also, a detail showing materials and colors for the gazebo is needed. h) More information on the berming is needed. Where will they ba and how tall? 18" high berms will not screen the parking areas. i) The parking spaces backing into Butch Cassidy Court are not recommended. The platting of the property seems strange. Lot 1 is left with essentially no parking and no way to get to the units from the large parking area. j) The SITE must be shown and identified on the Vicinity Map. This completes the staff review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the May 24, 1993 Planning and Zoning Board hearing: Plan revisions are due May 5, 1993 by 12:00 noon. Please contact me for the number of folded revisions required for each document. PMT's, renderings, and 8 folded copies of final revisions (for the Planning and Zoning Board packets) are due May 17, 1993. Final documents (including the signed development agreement, applicable mylars and utility plans) are due May 20, 1993 by 12:00 noon. Please contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. S' rely, t v Project Planner xc: Kerrie Ashbeck Sherry Albertson -Clark Advance Planning Stormwater Utility Transportation Jeff Laughren Stewart & Associates file/Project Planner CommL Planning Department City of Fort Collins May 25, 1993 Ed Zdenek ZTI Group 1220 South College Avenue Fort Collins, CO. 80524 Dear Ed, and Environmental ervices I would like to take this opportunity to express the concerns and comments of City staff relating to the Greenbriar Village P.U.D. - overall Development Plan and the Greenbriar Village P.U.D., First Filing - Preliminary & Final that you are intending to take to the Planning and Zoning Board on June 28, 1993 for a decision. As a result of the decision by the Board on May 24th night to postpone any action on the O.D.P. and the First Filing, Preliminary until June 28th, and your intent to gain final approval from the City to allow construction on this site, it is important to make you aware of the critical dates in the City's review process and the concerns that have to be addressed prior to submittal of revisions for this development. Staff's comments are as follows: Greenbriar Village P.U.D. - Overall Development Plan 1. The most recent O.D.P. in the City's file is dated May 17, 1993 and appears to be in good form. 2. The reference to an HB Zone north of Willox Lane is incorrect. That zoning district does not exist in that area. 3. Reference to the zoning districts affected by this development should be stated in the SITE STATISTICS. It is unclear what districts some of the phases are in. Greenbriar Village P.U.D., First Filing - Preliminary & Final Site Plan 1. The title of this drawing should be "Preliminary & Final Site Plan". The most recent site plan in the city's file is dated May 17, 1993 and appears to be the most complete. It would seem logical that revisions from this point forward be made to this document. 281 North College Avenue • P.O. Bur S80 • Fort Collins, CO 80522-0580 • (303) 221-6750 2. Note 12 must be eliminated, or it could be rewritten to say that "The developer reserves the right to request minor adjustments". The only "rights" are those provided in the L.D.G.S., which requires City approval. 3. what is meant by Note 6? What kind of "outside storage", other than what will be stored in the storage buildings, is being proposed that would necessitate screening? 4. By virtue of the fact that this will now be a combined Preliminary & Final the following two recommended conditions of approval for the preliminary plan that was postponed by the Planning and Zoning Board on May 24th must be addressed with your revisions (re -submittal): * The,cul-de-sac at the east end of Butch Cassidy Court must conform to the City's street design standards or the applicant must submit a variance request to the Engineering Department with the Final P.U.D. submittal clearly describing the function of the cul-de-sac and showing proof of the ability for a narrow street width to operate safely under all circumstances. * The off-street parking provisions for both Phases One and Two must meet the minimum off-street parking requirements as set forth in the City Code or the applicant must adjust the number of dwelling units to enable c-::;;,pli.ance with City Code prior to gaining final approval from the Planning and Zoning Board. 5. Note 9 references the RP and RAMP Zoning Districts. Please enlighten me. What is the RAMP district and what is allowed? 6. what will be the building material and color of the trash enclosures doors? 7. A note must be added stating that all proposed project fencing is shown on the Final Landscape Plan. Landscape Plan 1. The title of this drawing should be "Preliminary & Final Landscape Plan". The most recent landscape plan in the City's file is dated May 17, 1993 and appears to be the most complete. It would seem logical that revisions from this point forward be made to this document. 2. Landscape Notes 8 and 15 are not consistent. Note 15 does not allow any certificates of occupancy to be issued until all the landscaping shown on the entire plan is installed. A single, correct note should read ... "All landscaping for each phase of the project will be completed or secured with an irrevocable letter of credit, escrow or performance bond for 125% of the valuation as indicated on this plan prior to the issuance of the first certificate of occupancy in that phase". All of the street trees on both sides of Butch Cassidy Court must be installed with Phase One. 3. The project phases, Phases One and Two, must be defined on this plan. Will all the sidewalks (on both sides of the street) be completed with Phase One? 4. Butch Cassidy Court must be identified on this plan. 5. Note 19 referring to the fencing is too ambiguous, open-ended and is not acceptable. This note does not clearly define where fencing can and will occur. The plan does define the areas to be fenced but Note 19 then contradicts maybe even doing any fencing. Also, Note 19 as written does not commit the developer of Greenbriar Village P.U.D., First Filing to construct the perimeter fencing as shown. The Neighborhood Compatibility criteria in the All Development Chart of the Land Development Guidance System (page 5) states that "When a use is the first to develop on two adjacent vacant parcels, the first use shall provide the necessary buffer to any reasonable future use as determined by the City". The Greenbriar Village P.U.D. - Overall Development Plan identifies single family residential as the proposed use to the north and east of the First Filing. It is the responsibility of the more intensive use to provide adequate buffering between the two different uses. The more intensive use in this case is the multi -family residential in the First Filing. Buildina Elevations 1. The title of this sheet should be Greenbriar Village P.U.D., First Filing. We are reviewing this architectural drawing for the entire First Filing that includes two phases. In order to avoid any misunderstanding in the future it should be clear that an approval would be for this one building type for all 10 buildings containing 40 dwelling units. Phase One could be interpreted to be only buildings 1 through 6 as shown on the Site Plan. 2. This drawing, for the architect's construction purposes, is obviously part of a set of construction documents that includes 6 drawings. For the City's purposes this is drawing 1 of 1 and should titled as such. This completes the review comments at this time. This letter reflects, essentially, the Planning Department's comments to make the Site and Landscape Plans current. Please be aware of the Engineering Department's comments and requirements that were outlined at our meeting on May 25, 1993. You received the written comments after that meeting. It is important to contact the Stormwater Utility and get their current requirements. Additional reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the June 28, 1993 Planning and Zoning Board hearing: Plan revisions are due June 9, 1993 by 12:00 noon. Please contact me for the number of folded revisions required for each document. PMT's, renderings, and 8 folded copies of final revisions (for the Planning and Zoning Board packets) are due June 21, 1993. Final documents (including the signed development agreement, applicable mylars and utility plans) are due June 24, 1993 by 12:00 noon. Please contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. Aerely, Olt Project Planner xc: Kerrie Ashbeck Sherry Albertson -Clark Advance Planning Stormwater Utility Transportation Jeff Laughren Stewart & Associated file/Project Planner Correspondence/Not( , %z5V3 111 yx % (� //f��� 7�:orZ a i c e�se� � �Ss/o�'/ er�isreel" i �7�4. perk Cs-fd� r� zlS cxyri � corsisyG��li, easyrarer ® O1�P Arrx;,WrN /� 64 Cl v 4 riz/ Q441- P L"�Zcaxoe !/mac L 51 e L re1 easery� I[I C 1988 Priority Management Systems Inc. r wespondence/Notes C7}�LL�C � LZd cLd� Cu 1je- saG - Gl '-1-- de 6?x� �D �aee/4 �1G�uU�z%l� jwws1` fade- 04�0 rrXefe eivw CD r,/�14,7 a//i%G/lSGtvIC2 S'61{/qC °e- Shwa) lwellz- lfY egahc ! 6;,014e1vl 0 1988 Priority Management Systems Inc printed in US.A. �N 441 Pl_ JJECT COMMENT &tEET PROJECT NAME: PLANNING AGENCY: C, Public Service Company of Colorado has the following comments in regard to the above named project recently sent to us for review by the above named agency: No Problems Y I 1X�_ Problems, concerns, requirements as follows: of-~--d 'the - Z2s 72W3 DATE: D,S 2-6 93 TITLE: -� C.C. 0�17S Z-S 6b-Pm.1e.92 PROJECT City of Fort Collins COMMENT SHEET DATE: DEPARTMENT: /� f PROJECT: Greenbriar Village PUD -Prel. & Final PLANNER: Steve Olt Please respond to this project by Wednesday, April 14,1993. No Problems XProblems or concerns (see below) 'pk�.VO.� s AWA : t[cr HAD tN aizAtGv „N pRv*+G ZP*,W W"TW A T'MAT' JLMjse-, w.wotr-o V-4V1 Ar•+ L*101 &f=X-V t5' Ulii"'nJ OWSENW%aT 490u"P TP)tm, vtws por P* M@rVW- Orr- "ii pith . 7 fw P sv # L+vNDSGApG F,vb*'j erv:cArs T-Avmr ;& Sor.ea c^,SM 13UM4h"" trri� �T�Io Tp W rr*;Va It)' pp " fU;UP4W^=1 QNb J*AT QAMRoS f�XrE+ie7 E.►ow%j c"W— R,"uuv vis-40vapers . P�cpase-� 'Tn ik nL�so eaPssS¢t�tT' use' °7� -jFF;a spnuk �_ �uur►p[tr F:�U*•t Psutl.v:Ny sue- sm4Ls rr&~ aessarL W-F- .,.gWwa.Ks fwi1- -Iv *Avwr TW 15 bye.. rtEevu�rev -re WSrAK 00TVI &i-escr► C. # NAlLht^t.. eftAs roAaL-i liss Fie k; SFYOWAucy As l9 NOIt►N e" Powts- . N s �t.u.r+aw s)F E+-Or�f'1�i e. Aw%fo /&r- "ATVP^4- hA'5 L.I ► l S i m pfaYQiv AAC945 Mf►k, A¢ A 1 &iWifte7b OP130" . Ufi Li r1 VKSCrAVNM Pfz0r-%Mxw 004 PL Ar AM& 10ZJA050LjA7¢. Date: 1 7 i3 Signature:-1 CHECK IF REVISIONS REQUIRED: PLAT SITE LANDSCAPE? El UTILITY DEVI,LOPMENT SERVICES 28I NORTH COLLEGE P.O.BO%580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT ! PLANS" UTILITY City of FortCollins DATE: DEPARTMENT: C, C i�L�Nti�s E�NL"ACT PROJECT: /c /P. / tL�- Please review and return any comments and/or redlined plans to the Development Review Center by: 6�/x/93 ❑ No Problems Problems or Concerns (see below) Columbine Cablevision would like to work with Developers in wiring these units in a Home -Run System. We would also like to possibly go joint trench up to the buildings with main lines. Date: June 14, 1993 Signature' L��z��-��/--c- Dennis Greenwalt, Construction Coordinato CHECK IF YOU NEED TO SEE A REVISED UTILITY PLAINV ❑ DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.ROX 580 FORT COLLINS, COLORADO 80522-0580 (7031221-6750 PLANNING DEPARTVEN"r 60 UTILITY PLANS COMMENT SHEET City of Fort Collins DATE: (0 / 9-? DEPARTMENT: PROJECT: /L Please review and return any comments and/or redlined plans to the Development Review Center by: XNo Problems lProblems or Concerns (see below) /U&Me t oeAw•Ns Sr/or,►N op" *#IF AWAP-* ARC Dater Signature: CIIECK IF YOU NEED TO SEE A REVISED UTILITY PLAN: ❑ 1)EVE.LOPME.NT SERVICES 28I NORTH COLLEGE P.O.BOS 580 FORT COLLINS, COLORADO 80522-0580 (503)22I-6750 PLANNING DEPAR"fMENT PROJECT City of Fort Collins COMMENT SHEET DATE: DEPARTMENT: �1 f �'f s- PROJECT: Greenbriar Village PUD -Prel. & Final PLANNER: Steve Olt Please respond to this project by Wednesday, April 14,1993. ❑ No Problems ❑ Problems or concerns (see below) Date:/�V—fSignature: CHECK IF REVISIONS RE ❑ PLAY QUIRED: ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORAD) 80522-0580 (303)22I-675( PLANNING DEPARTMENT PROJECT 6N w �iii ii�,.',' �', COMMENT SHEET DATE: DEPARTMENT: C r- �Fv PROJECT: Greenbriar Village PUD -Prel. & Final PLANNER: Steve Olt Please respond to this project by Wednesday, April 14,1993. No Problems RY. Problems or concerns (see below) Columbine CableVision would like to work with Developers in wiring these units in a Home -Run System. We would also like to possibly go joint trench up to the buildings with main lines. Date: April 13, 1993 Sibnature: i (_ ,— Dennis Greenwalt, Construction Coord CHECK IF REVISIONS REQLIiRED: ❑ PLAT ❑ SITE El LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.DOX 580 FORT COLLINS, COLORADO R0522-0590 (303)221-6750 PLANNING DEPARTMENT PROJECT COMMENT SHEET DATE: DEPARTMENT: PROJECT: Greenbriar Village PUD -Pre[. & Final PLANNER: Steve Olt Please respond to this project by Wednesday, April 14,1993. No Problems Problems or concerns (see below) of,- 14 o-rN GoNTl20 I\J U M G N-rl �E �cSC1zkr31=1�- �j( (�UTI'iZ BUVN�AK� rY10NUM NTi 1::>`SCr< tr3I;z-L W Date: Signature: CHECK IF REVISIONS REQUIRED: S-HawPJ rnvsT MU,�'T % ❑ PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.ROX 580 FORT COLLINS, COLORADO 80522-0580(303)221-6750 PLANNING DEPARTMENT PROJECT COMMENT SHEET City of Fort Collins DATE: DEPARTMENT: PROJECT: Greenbriar Village PUD -Pre[. & Final PLANNER: Steve Olt Please respond to this project by Wednesday, April 14,1993. No Problems Problems or concerns (see below) IPrre h h0 UA�l(4-y rk, y�bvniMeel hhev l a k�� a e��; � ►red 7 av nez+ -to e BCC m'�`, Je7/reel !�{ZY11 j�a C 1 4, {� r� rvU ed, k rYw t� deh��n2ol noo et Date: l 23 �� Signature: •mil 11 PLAT CHECK IF REVISIONS REQUIRED: ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.ROX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT Commu.uty Planning and Environmental services Planning Department City of Fort Collins April 21, 1993 Ed Zdenek ZTI Group 1220 South College Avenue Fort Collins, CO. 80524 Dear Ed, Staff has reviewed the submittals for the Greenbrier Village P.D.D. - Overall Development Plan and Greenbrier Village P.U.D., First Filing - Preliminary/Final, and would like to offer the following comments: Greenbriar Village P.U.D. - O.D.P. 1. The Greenbriar project is being reviewed as a P.U.D. and the plans should reflect this. 2. The property is in the RP and the RMP zoning districts. The portion south of the existing Sundance Hills P.U.D., Second Filing is zoned RMP. 3. It is being recommended that the Development Phasing Plan schedule submitted as a separate document be added to the O.D.P. for Greenbriar Village P.U.D. 4. The phase lines are unclear on the O.D.P. Phase 2 is actually comprised of what area? What is the status/intent/proposed use of the parcel at the northeast corner of the O.D.P., at the intersection of Willox Lane and Redwood Street? 5. Submittal requirements for O.D.P.'s state that the area shown on the plan must extend beyond the property lines of the proposal to include a survey of the area within 150 feet of the proposal and should include: a) Land uses, location of principal structures and major existing landscape features; b) Densities of residential uses; c) Traffic circulation system; d) Natural features of the landscape; and e) General topographical mapping at same scale as the O.D.P. 281 North College Avenue • P.O. Bov �;80. • Fort Collins, CO 80a22-0;80 • M3) 221-67�;0 6. A legend should be added to the O.D.P. indicating, as a minimum, the significance of the arrows (presumably drainage patterns) and conceptual pedestrian connections both on- and off -site. 7. Note 3 should indicate that Any part of an exterior building wall will be located within 150 feet of an access for fire and emergency equipment. 8. Note 6 should indicate that all signs will comply to City of Fort Collins standards and will be restricted to signage as 9. Note 7 must be eliminated from the plan. This statement is too open-ended and could potentially create future misconceptions and misunderstandings about what is allowed to occur on the property. 10. The SITE for this development proposal must be shown and identified on the Vicinity Map. 11. The Residential Uses Density Point Chart does not relate to the O.D.P. It must be attached to the Greenbriar Village P.U.D., First Filing (and subsequent filings) plan. 12. Public Service Company of Colorado has stated that dedication of adequate utility easements must be provided by individual plats (filings). 13. The developer needs to be aware of the City ordinance that requires the undergrounding of existing overhead utilities prior to issuance of building permits. In this case, the ordinance will apply to lots in the southerly part of "Phase 4 - Single Family" and lots adjacent to Redwood Street in "Phase 2 - Single Family/Duplex". It will also apply to any development along the south side of Willox Lane. Please contact Doug Martine of City Light 6 Power with questions pertaining to these comments. He can be reached at 221-6700. 14. The City Water/Wastewater Department has stated that a Master Utility Plan must be submitted and approved prior to the approval of construction plans for any portion of the Greenbriar Village P.U.D. Please contact Mark Taylor with questions pertaining to water and sanitary sewer services. He can be reached at 221-6681. 15. Timing for construction of Redwood Street and its relationship to the proposed phasing of this development is critical. Sufficient secondary points of emergency access for any phase is required. Please contact Warren Jones of the Poudre Fire Authority with questions pertaining to emergency access requirements. He can be reached at 221-6570. 16. The O.D.P. indicates a general pattern for drainage. It appears that someone has thought it through but there is no narrative or indication of the method of conveyance (i.e., ditch, street, pipe, etc.). An overall drainage plan, reviewed and signed by an engineer, should be submitted. The plan does not need calculations unless the design engineer thinks there is reason to check flows to see if what is proposed is really feasible. Some sub -basin delineations may be needed just to be able to describe each area and how it is planned to drain. Please contact Glen Schlueter of the City Stormwater Utility with questions pertaining to storm drainage. He can be reached at 221-6589. 17. Blue Spruce Drive should be labeled on the plan. 18. Pedestrian connections should be indicated from Phase 1 to Greenbriar Circle. 19. The Solar Orientation Ordinance will apply to the Phase 2 - Single Family/Duplex portion of the development. This must be addressed with the Preliminary P.U.D. plans. 20. The Engineering Department is suggesting shifting the alignment of Sundance Circle and the intersection of Sundance Circle and Greenbriar Circle further to the south, creating more separation from Willox Lane. What is the circle on Sundance Circle? Greenbriar Village P.U.D., First Filing - Preliminary/Final 1. The plans should represent the fact that this is a P.U.D. 2. The Site Plan, and Building Envelope Plan detail, should identify that all buildings contain 4 dwelling units each. This is unclear with the information provided. 3. Both control monuments shown on the subdivision plat must be described. All outer boundary monuments must be described. 4. The Residential Uses Density Point Chart submitted on April 5, 1993 is claiming base credit for being within 3,000 feet of a major employment center and bonus credit for a commitment to developing low income housing. What is the major employment center that is being used for credit? This will need to be substantiated in writing to the City. Your commitment to low income housing must be presented in the Planning Objectives or in some other form of writing submitted to the City and included on the Site Plan. 5. Columbine Cablevision would like to work with the developers in wiring the units in a home -run system. They would also like to possibly go joint trench up to the buildings with main lines. Your contact person at CCTV is Dennis Greenwalt.