HomeMy WebLinkAboutGREENBRIAR VILLAGE PUD - Filed GC-GENERAL CORRESPONDENCE - 2004-08-09Commui. Planning Department Citv of Fort Collins May 21, 1993 Ed Zdenek ZTI Group 1220 South College Avenue Fort Collins, CO. 80524 Dear Ed, and Environmental , _vices Staff has reviewed your request for consideration of the Greenbriar Village P.U.D., First Filing - Final that was submitted on May 3, 1993. The Planning Department received 25 copies of a Final Site Plan and 16 copies of a Final Landscape Plan, both dated May 3, 1993. No utility plans or drainage report and plans were received with this submittal. My comment letter to you, dated April 21, 1993, indicated that the original submittal of Greenbriar Village, First Filing on April 5, 1993 was not adequate for a combined Preliminary & Final request. A complete final submittal package was required on May 3, 1993 to enable the request to stay on the agenda for the June 28, 1993 Planning and Zoning Board hearing. The submittal material received is considered incomplete; therefore, this request will not be included on the June 28, 1993 P & Z Board agenda. I have no other comments to make at this time. Please contact me at 221-6750 should you have questions about these comments. 4ee ly, Le lt Project Planner xc: Kerrie Ashbeck Sherry Albertson -Clark Advance Planning Stormwater Utility Transportation Jeff Laughren Stewart and Associates file/Project Planner A:oTth �odlr,c• \�cnur I"0' 13')� Aso • I o t Collmm , 0 40�2n7�0 -C'�=tO • (30;1 _'^I- POUDRE VALLEY RURAL ELECTRIC ASSOCIATION, INC. 4809 SOUTH COLLEGE AVE • P.O. BOX 1727 FORT COLLINS, COLORADO 80522-1727 May 28, 1993 Jeff Laughren ZTI Group Development 1220 South College Avenue Fort Collins, Colorado 80524 Poudre Valley FORT COLLINS • 226-1234 FAX NO. • (303) 226-2123 RE: Greenbriar Village and the overhead distribution power line. Dear Mr. Laughren: This letter is to confirm that Poudre Valley Rural Electric Association (Poudre) does own and operate the overhead distribution feeder line that runs north -south along the west side of Redwood Drive and east -west along Willox Lane. As per our discussions regarding the disposition of this line, Poudre is willing to offer the following as a method of resolving what could be done regarding this line. Along Redwood. Drive on the east side is a 69 kV transmission line that is overhead and does not have a requirement for undergroundir,.g. This transmission line will be required to have maintenance work that will necessitate the replacement of the poles in our next Construction Work Plan. This work plan will be formulated during the next two years. Poudre will underbuild this transmission line with the overhead distribution feeder at the time the maintenance work is done and you will be required to pay the differential cost of that work. I believe this would be a reasonable solution to undergrounding this line as there will be the overhead transmission line and the underbuild of distribution does not appreciably affect the aesthetics. As you know, the east -west portion of this line along Willox Lane is mostly on the north side of Willox. The portion of this line that is south of Willox and therefore or. your development, is less than 100 feet and would not be practical to underground such a GREELEY • 686-7431 LONGMONT • 776-1084 DENVER • 623-8606 1-800-432-1012 AN EQUAL OPPORTUNITY EMPLOYER Jeff Laughren Page 2 May 28, 1993 small portion. Additionally, the installation of the down -guys and anchors that would be required for dead -ending the lines to allow undergrounding that small portion would be more objectionable visually than leaving that portion overhead. Additionally, the continuation of this line to the west across Sundance Hills was not required to be placed underground and therefore will not be altered anyway. Hopefully this will be an acceptable compromise to your dilemma of undergrounding power lines that result in large expenses for you, little or no aesthetic benefit and operating difficulties for Poudre. Sincergly, Jim Byrn: P.E. Manager, Engineering Services pi A:\JB\JEFFL.EP Utility vices Light and Power City of Fort Collins MEMORANDUM DT: June 21, 1993 TO: Tom Peterson, Planning Director FM: Allen Boushee, Systems Engineering Manager(/M, RE: (11reenbriar Villag REA Lines Attached is a copy of a proposal from Poudre Valley REA to Jeff Laughren, the developer of Greenbriar Village, regarding REA lines along the development. The letter proposes that the existing REA line along the west side of Redwood be integrated with their overhead electric transmission line on the east side of Redwood during a near -future REA line rebuilding project. The existing line would then be removed. The developer would participate in the cost of the line integration. This would be done in lieu of undergrounding a small section of the overhead line along its' current route. We recommend the solution proposed be accepted for this particular situation as a practical and reasonable compliance with the intent of Section 29-677, Paragraph 7 of the City Code. Conditions of development approval would have to require a guarantee or other means of assurance of the developers participation in the future REA project. A bond or other guarantee should be effected prior to plan approval. Please contact us if we can be of further assistance. cc: Bob Kost Jeff Laughren Alan Rutz 700 %A ood Street • P.O. Bov ';80 • Fort Collins, CO 80522-0980 • (303) 221-67,00 2-22-- 9`f City of Fort Collins Engineering Department Attention: Dave Stringer Dear Sir: Please be advised to return escrowed funds for Frosion Control deposit to CARE for Greenbriar Village, Filing I. Thank ,you. S�P1 dah C e 1f;1/S f c.,LTe T-e �-� %Q �n C� �--e h ldr.e S d-Q r'1 February 22, 1994 City of Fort Collins 300 Laporte Avenue Fort Collins, CO 80521 �Opv Re: Erosion Controls - Greenbriar P.U.D. First Filing Ladies and Gentlemen: This letter is to serve as an assignment by Sundance Hills F.C., Ltd., a Colorado Corporation ("Sundance"), to Community Affordable Residences Enterprise, Inc., a Colorado non-profit corporation ("CARE"), of all interests of the undersigned in and to a $3,100 deposit and rights to the refund thereof in regard to erosion control matters related to Greenbriar P.U.D. First Filing. Such deposit is under the name "Sundance Hills -Jeff Laughgren", and any refunds duce in regard thereto should be paid directly to CARE, which now has all right, title and interest in and to such funds. SUNDANCE SILLS F.C., LTD., a Colorado Corporation �o By: C %4e5 ." althrt a Laugh en, President The above assignment is acknowledged and accepted this �? day of 1994. CITY OF FORTCOLLINS _Coma ity Planning and Environmentz Engineering Department City of Fort Collins July 5, 1994 Garth Rogers P. O. Box 608 Fort Collins, Co. 80522 )ervices Re: Water line damage at Greenbrair Village for Care Housing project Dear Mr. Rogers: In our Telephone conversation of June 28th you indicated to me that Public Service trenched through a City water line that the City failed to locate properly. Please find enclosed a City claim form for the water line damage that was incurred at the Greenbriar Village development as a result of Public Service installing their utility. Along with the claim form, please include a brief history of your understanding of the events which occurred, including the City's failure to locate the line correctly. If I can be of further assistance please contact me at 221-6605. Sincerel,�, David Stringer U Chief Construction Inspector cc: Jim Hibbard, Water Utility Stewart Ellenberg, Risk Management 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6605