Loading...
HomeMy WebLinkAboutCORTINA - Filed CS-COMMENT SHEETS - 2004-07-23PROJECT i.� COMMENT SHEET City of Fort Collins Current PlanninE DATE: November 19, 2002 TO: Engineering Pavement PROJECT: #45-02 HOWES/CANYON MIXED -USE PDP-TYPE II (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: December 18, 2002 Note - PLEASE identify your redlines for future reference R, cic Q,.c1— Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape City of Fort Collins Several details are included that are not needed. Please remove. Also, since the last submid:al, Inspection has chosen a different detail (attached) to be used only for the texture and dimension of the surface to replace the colored concrete square on the City's standard ramp details. Number: 89 Created: 3/3/2003 Please use drawing 1101 for the handrail detail. Number: 101 Created: 3/7/2003 Please provide a detail of the non-standard driveway including ramp transitions for the sidewalk and a cross-section. Page 3 Project Comments Sheet Selected Departments Cityof Fort Co]lins Department: Engineering Date: Ntay 7, 2003 Project: FIOWES/CANYON MIXED -USE PDP - TYPE II (LUC) - #45-02 All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: April 30, 2003 Mote - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General Number: 36 Created: 12/11 /2002 Please see redlines and utility plan checklist for any additional comments. 3.3.03 - repeat 4.15.03 - repeat Number: 99 Created: 3/6/2003 Where will the roof drains outlet? Please note that they will not be allowed to outlet over a public sidewalk - under -walk drains would be required. 4.15.03 - repeat Number: 100 Created: 3/6/2003 If under -ROW storage is approved, please provide detailed plans for it. 4.15.03 - A detailed structural design will be required prior to final plan approval. Number: 109 Created: 4/15/2003 The sidewalk width along Howes needs to maintain at least 8' of clear walk along the steps at the corner. (6' for the walk plus 2' shy distance from the steps) Number: 110 Created: 4/15/2003 Please show outlines of underground structures on the site/landscape plans. Number: 111 Created: 4/15/2003 Please use the mid -block location detail from Drawing 1603 (LCUA55) for the handicap parking stall ramp. Number: 116 Created: 5/1/2003 Where the storm sewer runs under the sidewalk, thicker concrete for the walk will be required (8"). Number: 117 Created: 5/1/2003 Please show where the perimeter drainage system/sump pit will outlet, and show the location of the sump pit. Signature -;X (�, C,CZ Date iL.0j CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility "' Landscape Page 1 Topic: Site Plan Number: 13 Created: 12/11 /2002 Encroachment permits are required for seat walls/columns/steps/etc. in the ROW. Also, an agreement with the DDA must be provided for the maintenance of these items, and for special paving. 3.3.03 - Please provide a letter of intent from the DDA prior to hearing, the encroachment permits are not required after all. Number: 16 Created: 12/11/2002 Please see redlines and landscape plan for further comments. Repeat 3.3.03 Topic: Grading plan Number: 112 Created: 4/1512003 It appears that the layer with the spot elevations got turned off; please turn it back on. Number: 113 Is section A -A drawn to scale? Created: 4/15/2003 Number: 114 Created: 4/15/2003 It looks like there will be a problem with cars bottoming out when coming out of the parking garage. Changing the grades isn't required, but please know that the property owner/developer will be responsible for the maintenance of that driveway. Topic: Overall Utility Plan Number: 83 Created: 3/3/2003 Please show where the drain that collects the water from the driveway down to the underground parking will drain to. Repeat 4.15.03 Topic: Storm Drain Profile Number: 98 Created: 3/6/2003 There has been a change in policy regarding the use of geotextiles when less than 2' of cover is provided: only concrete pavement will be allowed in these locations, and textiles are no longer allowed. 4.1 5.03 - A variance will be required to allow less than minimum cover over the stormpipe. Please submit a variance in accordance with the requirements in LCUASS. If the variance is approved, notes will be required on the utility plans (on the plan and profile sheet) and the Development Construction permit referencing the variance. To gain cover over the pipe, consider using D.I.P. or C900. Page 2 Project Comments Sheet Selected Departments of Fort Collins Department: Engineering Date: September 26, 2003 Project: HOWES/CANYON MIXED -USE PDP - TYPE II (LUC) 8, FINAL COMPLIANCE All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: September 24, 2003 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General Number: 131 Created: 9/22/2003 The proposed widening of the bump out into the street will not be permitted due to the adverse effects on parking on the north/west side of the street. Please work within the horizontal layout previously approved. Steeper slopes may be permitted on the driveway (6-8%) as long as adequate visiblity of pedestrians is maintained. Other suggestions for working on the driveway include notching up the building structure over the driveway to attain more headroom and adding a Floodgate to keep storm Flows from entering the garage. As stated in the meeting by Stormwater, do your best to keep as much Flow as possible in the gutter. Number: 132 Created: 9/22/2003 Since the proposed drive -over curb and gutter does not match a standard detail, please submit a detail drawing and variance request. Also, please note on the plans that this curb can never be altered due to stormwater problems (further elaboration may be needed on the plans). N ber: 3 Created: 9/22/2003 Since a iginaI agreement with the property to the south does not address the addition of storage units on their proper lease resubmit a copy of an agreement addressing the additional underground use of their property and the ' ad cnal a a needed. T;eE,o)Ved 9,2%.03 — 1 ecL'L \Pe Number: 139 Created: 9/23/2003 There is still one door on the east side of the building shown to open over the ROW. Please remove or recess this door. Mike Gebo in Building and Zoning is a good person to talk to regarding this requirement. Topic: Landscape plan Number: 140 Created: 9/23/2003 Please show the outlines of the underground storage units and note that no excavation will be allowed within 7' of the center of any trees (per the City Forester). Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS f Plat Site Drainage Report Other_ f Utility- _ ✓ Redline Utility ,, Landscape Page 1 Number: 142 Created: 9/23/2003 The landscape plan shows two different stormpipe layouts. Please show only the correct one. Topic: Lease Number: 143 C� Created: 9/25/2003 In order to move forward with the lease, a plat of the leased area will be needed, as previously discussed. Completion of the plat will be required prior to Certificate of Occupancy on the building, unless complications arise if the plat is appealed. In this case a substitute form of documentation (to be determined) of the leased area will be required and the plat will no longer be required. It is anticipated that the review and hearing process for the plat (barring an appeal) could be completed quickly. Topic: Utility plans Number: 134 Created: 9/23/2003 The stormpipe in Canyon is not allowed to be PVC. Please remove that option from the plans. Topic: Overall Utility Plan Number: 138 Created: 9/23/2003 1 still have not received the variance request to have less than 2' of cover over the stormpipe in Canyon. Please submit a variance request for this item so that we can determine the best solution to be implemented. Topic: Canyon Avenue Profile Number: 135 Created: 9/23/2003 The minimum Flowline grade allowed is 0.5%, and a portion on the profile is shown at 0.44%. Please revise. Topic: Grading plan Number: 114 Created: 4/15/2003 It looks like there will be a problem with cars bottoming out when coming out of the parking garage. Changing the grades isn't required, but please know that the property owner/developer will be responsible for the maintenance of that driveway. 9.22.03 - Repeat as FYI. Page 2 PROJECT ...-1 COMMENT SHEET City of Fort Collins, REM '030C Current Planning DATE: October 10, 2003 TO: Technical Services PROJECT: #45-02B HOWES/CANYON MIXED -USE PDP IZEPLAT — TYPE I (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: Noveffifter 5, 2003 Note - PLEASE identify your redlines for future reference /, EASEME�i 5 CCnsE� cAScME•✓T Z GEGAG S�t/e� iyfATC�1 1//Z5 IV41, LAJ LJ I k— �_ N a-(s D V\�(�' i �r Name (please print) �S e- T-fIts FTN k CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS '14lat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape Pi.4 T ON of Fort Collins 2:2 October 13, 2003 Mr. Bob Barkeen City of Fort Collins Current Planning 281 North College Avenue Fort Collins CO 80521 Re: Cortina Mixed Use Building PDP- Type II Final Compliance Dear Bob: Following are responses to Staff's 9/29/2003 review: Engineering: Canyon Avenue Profile Number 135 The flowline slope has been revised to .0.5% minimum. General Number 131 Revised — see new design. Number 132 he entry now has a standard 4' wide pan. Number 139 Per conversations between Bill Coulson and Lance Newland, the door can swing into the right of way because it is only a fire exit and not a highly used door. Number 141 The handicap ramp (and therefore, handicap parking stall) is located to prevent the ramp from being in front of the stairs. We prefer to leave the ramp in the location shown. Grading Plan Number 114 Acknowledged. Landscape Plan Number 140 The underground storage has been shown on the revised site and landscape plans and a note has been placed on the landscape plan with the City Forester's requested language. Number 142 The correct stormpipe, water and sever services are now shown on the landscape plan. Overall Utility Plan Number 138 This variance request is attached. Site Plan Number 13 Acknowledged. The agreement with the DDA will be provided. Utility Plans Number 134 PVC option was removed. Pipe will be ductile. Light & Power Electric Number 126 Developer is coordinating with Light & Power. The location will be near the southeast corner of the building. Stormwater Utility Drainage Number 137 Flood proofing is proposed. Complete design will be provided by the manufacturer and the developer. Erosion/Sediment Control Number 136 Adjusted the silt fenice per Bob Zakley. Water/Wastewater General Number 127 Landscape Plan has been coordinated with Utility Plans. Number 128 Revised per your request. Number 129 The Homeowners Documents will have a clause addressing this issue. These documents will be provided to you prior to issuance of certificate of occupancy. Number 130 The location is accurate and coordinated with the architecturals. Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: October 30, 2003 Project: HOWES/CANYON MIXED -USE PDP REPLAT - TYPE I (LUC) All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: October 29, 2003 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General Number: 3 Created: 10/28/2003 [ 10/28/031 The document provided is not a plat. Please provide a plat as discussed with Wally Muscott, with the plat language and signatures needed. Please provide a space to identify the reception number for the lease connected to the underground lease area (this area is not an easement). Please see redlines for additional comments. Number: 4 Created: 10/30/2003 [ 10/30/031 Additional comments from Wally: 1. Easements close, easement #2 legal doesn't match the map. 2. We will need to see the final plat. /o , ZI.a3 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site Drainage Report Other Utility _ Redline Utility Landscape Page 1 Project Comments Sheet Selected Departments Department: Engineering Date: December 18, 2002 Project: HOWES/CANYON MIXED -USE PDP - TYPE II (LUC) - #45-02 All comments must be received by BOB BARKEEN in Current Planning no later than the staff review meeting: December 18, 2002 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General 36 Please see redlines and utility plan checklist for any additional comments. 47 The variance request for the driveway downslope within the ROW was not approved. Please see the attached letter for further information. 48 The variance request for the attached sidewalk was not approved, and a bumpout will not be supported in this location either. Please see the attached letter for further information. 49 Please provide more information regarding the underground parking south of the building. 62 The following is a request: please widen the sidewalk on the east side of the building so that the full length of the sidewalk's right edge aligns with the right edge of the sidewalk offsite to the south. The following is a requirement: the right edges of the existing and proposed sidewalks there should align across the driveway (the sidewalk onsite may transition to the 8' width as it heads north). Topic: Building Elevations 11 Please make sure that what is shown on the building elevations matches what is shown on the grading/utility plans (most noticeably the garage door depth). Topic: Site Plan 12 Building doors are not allowed to open over the ROW. Please recess them or find some other solution. Date CHECK :HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat V Site Drainage Report Other _ Utility _ Redline Utility _ Landscape Page 1 Project Comments Sheet 062nd■I Selected Departments CAN, of Fort Collins ��� Department: Engineering Date: November 4, 2003 Project: HOWES/CANYON MIXED -USE PD REPLAT - YPE I (LUC) All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: October 29, 2003 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General Number: 6 Created: 11 /4/2003 [ 1 1 /4/03] Please remove the owners (Howes/Canyon LLC and Coulson Development Group, INC) from the plan view of the plat as redlined. Number: 7 Created: 11 /4/2003 [1 I /4/03] On the leased areas, please call out the base elevation as approved by Council. Number: 8 Created: 11 /4/2003 [1 1 /4/03] Please specify that the leased areas were leased to Cortina Homeowners' Association. Signature n.5.o3 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓� Plat _ Site Drainage Report Other Utility __ Redline Utility Landscape Page 1 Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: November 6, 2003 Project: HOWES/CANYON MIXED -USE PDP - TYPE II (LUC) & FINAL COMPLIANCE All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: November 5, 2003 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: Flood Wall Number: 145 Created: 11/4/2003 [ 1 1 /4/031 Please provide further detail for the flood wall, including dimensions and how It works with the retaining walls. Please provide the manufacturer's information and recommended installation. After reviewing this information it will be determined what else needs to be shown on the plans. How does it get drained? Where will the water drain to? Will there be a groove in the retaining wall for the flood wall and will it be a waterproof seal? What materials is it made from? Is -10" a high enough wall? Etc. Also, call out the concrete thickness of the cross -pan on the cross-section as B" minimum. Prior to resubmittingmy otans please call to set up a meeting with Engineering, Stormwater, and Water/Wastewater regarding the flood wall. Number: 146 Created: 11/4/2003 [ 1 1 /4/03] Please be sure to show the flood wall location on all plans. Topic: General Number: 36 Created: 12/11/2002 [ 1 1 /4/031 Repeat of original comment: Please see redlines and utility plan checklist for any additional comments. 3.3.03 - repeat 4.15.03 - repeat Number: 99 Created: 3/6/2003 [ 1 1 /4/03] Repeat of original comment: Where will the roof drains outlet? Please note that they will not be allowed to outlet over a public sidewalk - under -walk drains would be required. 4.15.03 - repeat 8.6,65 Dare CHECK HE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat t� Site Drainage Report Other t� Utility Redline Utility =Landscape Page 1 Number: 100 Created: 3/6/2003 111/4/03] Please submit a copy of the structural calculations for the storage in the ROW for city files. Also, please add the standard city signature block to the plan sheets and submit the sheets on mylar for signature along with the rest of the mylars (as part of the utility plan set). The final paper copies for City files will need to be signed and stamped by a Colorado PE, just like the rest of the utility Plan sheets. Original comment: If under -ROW storage is approved, please provide detailed plans for it. 4.15.03 - A detailed structural design will be required prior to plan approval. 9.22.03 - A very preliminary design was submitted prior to the lease approval going before Council, but this design needs to be completed and resubmitted for review. Number: 117 Created: 5/1/2003 [ 1 1 /4/031 Repeat of original comment Please show where the perimeter drainage system/sump pit will oudet, and show the location of the sump pIL Number: 132 Created: 9/22/2003 It 1/4/031 A variance request and further detail is still needed for this non-standard driveway approach section. How will the transitions at the pan widening be constructed? What is shown does not match any City of Fort Collins standard, but from what is shown, the variance would be supported. Again, please note on the plans that this curb cannot be altered in the future. Also, FYI, the slopes shown for the driveway are acceptable. Original comment.• Since the proposed drive -over curb and gutter does not match a standard detail, please submit a detail drawing and variance request. Also, please note on the plans that this curb can never be altered due to stormwater problems (further elaboration may be needed on the plans). Number: 147 Created: 11 /4/2003 [ 1 1 /4/031 Please call out the distance from flowline to flowline on Canyon, as well as the distance from the edge of parking stalls to the east flowline on Canyon. Topic: Landscape plan Number: 140 Created: 9/23/2003 [ 1 1 /4/03] Now that the outlines have been shown, it appears that one of the existing trees on Canyon will not be outside of this 7' area. Please note on the plans to contact the City Forester regarding tree protection prior to construction. Original comment: Please show the outlines of the underground storage units and note that no excavation will be allowed within 7' of the center of any trees (per the City Forester). Number: 142 Created: 9/23/2003 [ 11 /4/03] Now only one is shown, but It doesn't match the one shown on the utility plans. Please coordinate. Original comment: The landscape plan shows two different stormpipe layouts. Please show only the correct one. Topic: Overall Utility Plan Number: 83 Created: 3/3/2003 [ 1 1 /4/03] Repeat of original comment - Please show where the drain that collects the water from the driveway down to the underground parking will drain to. Repeat 4.15.03 Page 2 FINAL COMPLIANCE 6a� REVISION City Fort I COMMENT SHEET Current nt Planniannin.a DATE: November 12, 2003 TO: Engineering PROJECT: #45-02A Howes/Canyon Mixed -Use PDP — Final Compliance All comments must be received by Bob Barkeen no later than the staff review meeting: November 26, 2003 Note - Please identify your redlines for future reference fkav, &tf-74t ho``' Raw on oanven i 1ilol yel was ' �(� �a �Dt Si,t,b►'vllt ryty la.� u''�t� � -�t,e. �eaa� ed l'o cyi p� Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS /Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape E a 'EMOU1 FINAL COMPLIANC REVISION City of Fort Callin:I COMMENT SHEET Current PlanninE DATE: November 12, 2003 TO: Technical Services PROJECT: #E45-02A Howes/Canyon Mixed -Use PDP — Final Compliance All comments must be received by Bob Barkeen no later than the staff review meeting: November 26, 2003 M Note - Please identify your redlines for future reference (, BvuNoq,2Y � L£GFIL CLOScS_ Name (please print) 7HERE IF Yg,U WISH TO RECEIVE COPIES OF REVISIONS _Site _Drainage Report Other _Utility _Redline Utility _Landscape 6=1 ^&16m Me.0 City of Fort Collins i Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: December 18, 2003 Project: HOWES/CANYON MIXED -USE PDP - TYPE II (LUC) & FINAL COMPLIANCE All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: Detail Sheet Number: 162 Created: 12/18/2003 [ 12/ 18/03] Please see redlines and provide more detail regarding the driveway construction. Topic: Flood Wall Number: 145 Created: 11 /4/2003 [12/16/03] Repeat: The cross -pan should be noted as 8" thick concrete. [ 11/4/03] Please provide further detail for the flood wall, including dimensions and hei.A., it viepics with the retaining walls. Please -provide -the -manufac JreFs- information -and -reEe er�rw;e. •^^ this information It will be ahigh-enough-wall?—€tc. Also, call out the concrete thickness of the cross -pan on the cross-section as 8" minimum. Q•o.-.o-.��u4mitcing=a-�ans�- I_ease-call-te-set-u..a-meet"wit,�€„s;,,� Wate egg Number: 146 Created: 11/4/2003 [12116103] Repeat: The flood wall location is still not shown on the site and landscape plans. [11/4/031 Please be sure to show the flood wall location on all plans. Number: 160 Created: 12/18/2003 [12/18/031 Please reinstate the cross-section of the underground storage units. Topic: General Number: 36 Created: 12/11 /2002 [12/18/031 [ 1 1 /4/031 Repeat of original comment: Please see redlines and utility plan checklist for any additional comments. 3.3.03 - repeat 4.15.03 - repeat /Z./9o3 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat / Site Drainage Report Other L Utility = Redline Utility Landscape Page I Number: 132 Created: 9/22/2003 (12/18103] The variance was approved, see the attached approval fetter. Please reinstate the cross-section previously shown that showed the drive approach and the slopes down the driveway to the underground parking to clarify what's going on. [11/4/03] A variance request and further detail is still needed for this non-standard driveway approach section. How will the transitions at the pan widening be constructed? What is shown does not match any City of Fort Collins standard, but from what is shown, the variance would be supported, Again, please note on the plans that this curb cannot be altered in the future. Also, FYI, the slopes shown for the driveway are acceptable. Original comment: Since the proposed drive over curb and gutter does not match a standard detail, please submit a detail drawing and variance request. Also, please note on the plans that this curb can never be altered due to stormwater problems (further elaboration may be needed on the plans). Number: 161 Created: 12/18/2003 [ 12/ 18/031 Please provide the dimension of the distance from the end of the retaining walls to where the Floodgate will be installed. Also, please ensure that the retaining wall height is the same as the Floodgate height. In the meeting on 12/17, a 1 S" Floodgate was discussed, which would add approx. 7" to the retaining wall heights. Topic: Landscape plan Number: 140 Created: 9/23/2003 [ 12/ 16/031 Repeat: Add a note to the landscape plan to contact the City Forester prior to construction regarding tree protection. [ 1 1 /4/031 Now that the outlines have been shown, it appears that one of the existing trees on Canyon will not be outside of this 7' area. Please note on the plans to contact the City Forester regarding tree protection prior to construction. Original comment: Please show the outlines of the underground storage units and note that no excavation will be allowed within 7' of the center of any trees (per the City Forester). Page 2 13 Encroachment permits are required for seat walls/columns/steps/etc. in the ROW. Also, an agreement with the DDA must be provided for the maintenance of these items, and for special paving. 14 The curb and gutter shown near the northernmost inlet doesn't match the utility plans. 15 FYI -Utilities are not required to be shown on the site plan, but are required on the landscape plan. 16 Please see redlines and landscape plan for further comments. Topic: Landscape plan 17 Please label property lines/ROW lines (typ). 18 Columns in ROW must be at least 2 feet from the curb. 19 There are aireas where it is unclear whether plants or paving are proposed. Please clarify. Topic: Utility Plan Cover Sheet 20 The title needs to be changed since symbols aren't acceptable in the title, and the title doesn't match what is used for the Site and Landscape plans. The preamble should also have the addition of: Public Improvement (Construction Plans For). 21 The index indicates a plat is included, but a plat was not submitted. 22 Please provide the benchmark identifier numbers. 37 Please provide a reference to the soils report. Topic: Utility Plan General Notes sheet 23 Please correct typos as redlined. Topic: Grading plan 24 If the flowline is to be altered, please provide a profile of the new curb and gutter and how it ties to the existing curb and gutter. 25 What are the heights and widths of the steps in the ROW? 26 Driveways need to be a maximum of 4% grade for a car length beyond the back of the sidewalk. (The variance request for the driveway as shown was denied.) 27 What is the FF of the basement level? 28 Please show new contour lines. 38 Please provide the finish grade elevations of the lot corners. 61 How will water get out of the basement level? Topic: Overall Utility Plan 29 Please show that driveways will be concrete to the property line. Page 2 30 The street cut note should be expanded to say: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs are to be in accordance with City street repair standards. 31 Street cuts need to be made to the edge or middle of the lane. 39 Please dimension and label property/ROW lines. Topic: Storm Drain Profile 32 For Storm 1 profile: It appears that the pipe cannot be lowered; since 2' of cover to the subgrade cannot be achieved, a geogrid/geotextile will be required above the pipe. Topic: Detail Sheet 33 Please see the attached ADA requirements for ped ramps and include the drawings on the detail sheet. 34 Please specify which details are to be on -site only. 35 It appears that certain details are extraneous and not needed on the plans. Page 3 X l ands :�po A1111.1 clure Urban pesl9n Planning February 12, 2003 Bob Barkeen City of Fort Collins Planning Department 281 North College Avenue PO Box 580 Fort Collins, CC) 80522 RE: Response to Staff Comment letter dated December 30, 2002 Dear Bob, The comments below address the issues raised by city staff regarding the Canyon/Howes Mixed -Use Project. Advanced Plannin Site Plan 66 Regarding sidewalks and pedestrian connections along Canyon. We recognize that the pedestrian has to walk along an attached sidewalk for a short distance due to the curb bulges and large existing Ash tree. However, we feel that the primary pedestrian experience is enhanced along the building. Here is opportunity for artwork, special paving, planters, etc. The Tower" level (T walk) was intended for people to get from the diagonally parked cars to the building without having to go through a landscape area. In addition, there are several existing trees that prevent a continuous connection along the `lower" level. Current Planning Site Plan 67 A modification request is being submitted with the revisions. 68 We have provided additional information. 69 We had requested an Alternative Compliance to Section 3.2.1(E)(4)(a) and (b) for the perimeter landscaping requirements for the small parking lot. Since trees, shrubs or irrigation above the parking structure are prohibited, we proposed screening with a 6-foot solid cedar fence and landscape cobble. The LUC requires the parking lot be screened from residential uses by a 6-foot fence. The Ash and Siberian Elm trees along the west end of the Linden Press parking lot are to be removed. Engineering: Building Elevations 11 The architectural elevations have been revised to reflect the current grading. Phone 970.224. 5828 Fax 970.224. 1662 401 West Mountain Ave. Suite 201 Fort Collins, CO 80521-2604 O uplay. com Detail Sheet 33 The ADA ramps have been added to the plans as well as the detail. 34 See revised utility plans. 35 Removed from plans General 36 Acknowledged. 49 We are providing a drawing of the underground parking structure in the utility plan set. 62 The sidewalk has been widened to align with the existing walk to the south Grading Plan 24 New flowline, curb and gutter has been shown on the utility plans. 25 The height and widths of the steps have been added to the plans. 26 The driveway is 4% for 16 feet, then 16% into the parking structure. 27 See sheet 4A of the utility plans. 28 Contour lines shown. 38 Grade elevations have been added to the lot corners. 61 There is a note regarding a sand/oil separator on the utility plans. Landscape Plan 17 Property lines/ROW have been labeled. 18 Columns have been moved. 19 We tried to clean the plan up so it reads better. Overall Utility Plan 29 Acknowledged. 30 Acknowledged. 31 An additional sanitary service has been added. 44 See revised utility plans. 45 Acknowledged. 46 Acknowledged. Site Plan 40 The bike rack has been shifted to the north to clear the meter pit and water lines. 41 Plumbing calcs are Included with resubmittal. Zoning: 3 The existing trees have been removed from the site plan as requested. 4 The widths have been added to the parking stalls. 5 The revised bedroom and parking counts are located on the Land Use Breakdown on the site plan sheet. 6 The building envelope has been labeled on the site plan, as well as dimensions of property lines and setbacks. 7 In addition to the outdoor trash/recycling enclosure, there are recycling facilities within the building on each floor. 8 There is an existing street light at the northeast corner of the site. We don't anticipate any additional lights beyond what is being proposed on -site. 9 We could not locate an existing ramp at the driveway for the Linden Press building. The sidewalk continues across the drive. 10 The Ash trees are small and multi -stemmed and would be impossible to relocate so we are showing them as being removed on the landscape plan. Please let us know if you have any further issues or questions about this project. Sincerely, Ca. Aq rrlaAw Cathy Mathis VF Ripley Associates City of Fort Collins Project Comments Sheet Selected Departments Department: Engineering Date: March 6, 2003 Project: HOWES/CANYON MIXED -USE POP - TYPE 11 (LUC) - 445-02 All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: March 05, 2003 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General Number: 36 Created: 12/11 /2002 Please see redlines and utility plan checklist for any additional comments. 3 3.03 - repeat Number: 90 Created: 3/3/2003 Prior :(o hearing, please provide a letter of intent from the owners of the Linden Press property regarding this prolect's use of their property and that they plan on completing any needed easements or other agreements for that use. Number: 92 Created: 3/3/2003 It appears that easements for construction of the underground parking structure on the south side of the site will be needed from the neighboring property owners (south of Linden Press and south of the mechanical building). Please provide letters of intent prior to nearing. Where will staging take place? Number: 99 Created: 3/6/2003 Where will the roof drains outlet? Please note that they will not be allowed to outlet over a public sidewalk - under -walk drains would be required. Number: 100 Created: 3/6/2003 If under -ROW storage is approved, please provide detailed plans for it. Topic: Site Plan Number: 13 Created: 12/11 /2002 Encroachment permits are required for seat walls/columns/steps/etc. in the ROW. Also, an agreement with the DDA must be provided for the maintenance of these items, and for special paving. 3.3.03 - Please provide a letter of intent from the DDA prior to hearing. Number: 16 Created: 12/11/2002 Please see redlines and landscape plan for further comments. Repeat 3.3.03_ v /b Il, Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _—Drainage Report Other_ I!tilih _ Redline Utility _X_ Landscape Pace I Topic: Utility Plan Cover Sheet Number: 79 Created: 3/3/2003 Th onnet bolt survey is no longer in use. Please use COFC vertical control Number: 91 Created: 3/3/2003 Piese include sheet 4a in the index and sheet numbering/totals. Topic:. Drainage Number: 88 Created: 3/3/2003 —1t-pears that the layer showing the proposed bumpout/driveways was turned off for this sheet. Please show it. Topic: Grading plan -- Number:28 Created:12/11/2002 Please show new contour lines. 3.3.03 - It would help to have a more distinctive (thicker?) line type for the new contours. They're currently difficult to pick out. Number: 80 Created: 3/3/2003 The southernmost driveway on Canyon should be a Type 2 driveway, with the corresponding ramp type for the sidewalks, the same as the driveway down to the underground parking. Number: 81 Created: 3/3/2003 The ramp heading north at the corner of Canyon and Howes should have a width at least equal to the ramp across the street from It. Topic: Overall Utility Plan _ Number:39 Created:12/11/2002 Please dimension and label property lines/ROW. 3.3.03 - repeat Num er:82 Created: 3/3/2003 Bo driveways need to be concrete to the ROW line. Number: 83 Created: 3/3/2003 Please show where the drain that collects the water from the driveway down to the underground parking will drain to. Topic: Storm Drain Profile Number: 98 Created: 3/6/2003 There has been a change in policy regarding the use of geotextiles when less than 2' of cover is provided: only concrete pavement will be allowed in these locations, and textiles are no longer allowed. Topic: Canyon Avenue Profile Number: 84 Created: 3/3/2003 Not enoq data was provided to verify that cross -slopes will be adequate. Please provide elevations on the centerline profJefor this purpose. Number: 85 Created: 3/3/2003 Centerline stationing is required per LCUASS for all street design. NumbeP-86 Created: 3/3/2003 The imum fiowline grade is 0.5%, and there is a large section of curb that does not meet this requirement. Topic: Detail Sheet Number: 87 Page 2 Created: 3/3/2003