Loading...
HomeMy WebLinkAboutCORTINA - Filed DCP-DEV. CONSTRUCTION PERMIT - 2004-07-23DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (1"-aa) v use only: _4pplicafion Number: / ` 1' ,Application Date: Permit a licafion ree: S - PP � > U� U CTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary_ documents and submit to the Development Engineering Section of the City. _. If you have any questions contact she Development Eaeinee. _ at221-67s0. Submit ;he Application and pay the Application Fee at the fee at the Engineering counter at '81 No. Colleze Avenue. PROSECT INFORMATION: Project -Name (as approved by the Citvj: Cortina Lofts Project A.IC.A. (Marketing name i f dilier mt from Project Name): Project Location: Canvon Avenue at Howes Street, Fort Collins, CO 80521 Property Owner(At the; lime of this perm t Issuance) . Name: William Coulson _address: 510 West Magnolia Street Phone :lumber( S ): Office: 970-495-9942 Callohorie: 970-222-7499 Fax.nurrper: N/A Email: widcoulsondevelopment. com Appiicant/Project Manager Nile pr, mar, contact peon for dl narters-e_arding his proje,-' end he 'Ders0n resbonsioie or all matters referencing "he Developer' m he Development Aereement for this \'ame: Ted 3eers' c/o Sinnett Builders, Inc. �.daress: 0. 3os 1969, Fort Collins, CO 80522 ��lOne bnmberi � I: Offce: 970-493-1770 r-,2 ]rnone:970-566-0840 _ ... ;umCer: yi0-482-4537 redid, innertbuilders.com I North Star "01 ft,w, design, Inc. November 19, 2002 Ms. Katie Moore City of Port Collins Engineering 281 North College Avenue PO Box 580 Port Collins, Colorado 50522-0580 Re: Canyon and Howes — Request for Variance 1 — Attached sidewalk Proj: 114-24 Dear Katie: The following is a request for variance from the Table 7-1 — General Parameters — Parkway Width in the "Larimer County Urban Area Street Standards, October, 2002". This variance is requested to allow a 6.5' attached walk along Canyon Avenue, a local street, and removing the parkway in this area. The proposed project will consist of a 6-story building with underground parking and an adjacent surface parking lot. The building is proposed to abut directly to the existing right of way (typical with much of the construction in downtown Fort Collins). The project will effectively reconstruct the streetscape on the majority of Canyon Avenue frontage (approximately 320' of the 550' street). It is proposed to reconstruct the curb, gutter and sidewalk along the majority of the project. Through the design process, it has become apparent that an attached walk along a portion of the frontage will provide a finished product that works better with the "urban intill design" of the project. We would request a variance allowing the attached walk for the following reasons: • Attaching the walk will allow several existing trees to be saved. • The attached walk is proposed to be 6.5' wide (2' wider than the minimum requirement). There is no parking adjacent to the walk so all of the width is usable by pedestrians. This extra width alleviates the safety concerns of having the walk adjacent to the curb. • The right of way area along Canyon will have approximately 3100 square feet of landscaping (10' of width average). The landscaping is in large areas around the trees to be saved rather than a 6' wide strip required by the standards. Every effort has been made to have a streetscape that exceeds the City's requirements and expectations. • The sidewalk on the opposite side of Canyon is attached. It would be expected that this condition would remain even if that site were to redevelop. Attaching the walk along this project will not appear out of place with the same condition existing across the street. 700 Automation Drive, Unit I Windsor, Colorado 80550 970'-GSG-G939 Phone • 970-G86-1188 Fax DEVELOPMENT CONSTRtiCTION PERIMIT APPLICATION (1/7/99) For Citi, use only: Application Number: Application Date: ) U Permit application fee. S � �0 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Eng neering Section of the City. 2. If you have any questions contact the Development Engineer at 221-6750. 3. Subrut the Application and pay the Application Fee at the fee at the Engineering counter at 281 No. College Avenue. PROJECT INFOR%ATION: Project Name (as approved by the City): Cortina Lofts Project A.K.A. (Marketing name if different from Project Name): Project Location: Canyon Avenue at Howes Street, Fort Collins, CO 80521 Property Owner(At the time of this permit issuance) Name: William Coulson Address: 510 West Magnolia Street Phone number(s): Office: 970-495-9942 Cellphone: 970-222-7499 Fax number: N/A Email: w@co ulsondevelopment.com Applicant/Project M;anaoer (The primary contact person for all matters regarding this project and the person responsible for all matters referencing "the Developer" in the Development Agreement for this proiect): Name: Ted Beers'c/o Sinnett Builders, Inc. Address: _P.O. Box 1969, Fort Collins, CO 80522 Phone number(s): Office: 970-493-1770 Cellphone: 9 70-566-0840 'lax number: 7 iO-482-4537 Email: ted@sinnerrSuilders.com Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person responsible for the design of this project, responsible for cernfication that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Name: North Star Design, Inc. Patricia Kroetch Address: 700 Automation Drive, Unit I, Windsor, CO Phone number(s): Office: 970-686-6939 Cellphone: N/A Fax number: 970-686-1188 Email: N/A Professional License Number: CO 31306 Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement -add additional names below): Name: William Coulson Address: 510 West Magnolia treet Phone number(s): Office: 970-495-9942 Cellphone: 970-22 2-7499 Fax number: N/A Email: w0coulsondevelonment.com General Contractor (The contractor in overall charge of the public infrastructure construction): Name: Sinnett Builders, Inc. Address 1969, Fort Collins, CO 80522 Phone number(s): Office: 970-493-1770 Cellphone: N/A Fax number: 970-482-4537 Email: sinULettbu�laers.com If you have no General Contractor, list all other contractors below. Grading contractor: Name: N/A .Address: _ Phone number(s): Office: Cellphone: Fax number: _ Email: Utility contractor Name: Address: Phone number(s): Office: _ Cellphone: Fax number: Email: Concrete contractor for flat work: Name: N/A Address: _ Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor, for structures: Name: N/A Address: _ Phone number(s): Office: Cellphone: Fax number: Email: Paving contractor: Name: Address: _ Phone number(s): Office: _ Cellphone: _ Fax number: Email: Landscape contractor: Name: _ Address: _ Phone number(s): Office: _ Cellphone: Fax number: Email: N/A N/A Other contractors and parties involved in the project: N/A SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"xl1" copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City man ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Title Sinnett Builders, Inc., Ted Beers, Project Manager/GC Coulson Development, Bill. Couison, Developer North Star Design, Patricia Kroetch, Project Engineer The Architect's Studio, Don Bundy, rc itect an anner ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to _ own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: S 90,495.55 Private infrastructure, estimated cost: S 17, 980.88 I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners hav ng legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. Applicant Signature:_ C—e..6k %,_ Date: 12/22/03 Cowes— CarIV, MIX Use - A KA cor-h"rl a DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET Con,:act name M 5 L vo Company Name a'r� o� �Oi+ bulnf Address jw(k l,Vo-ttr 7oD WOGd S�-- Phone Number zy/ �C'vkYt ka-h"e I�ocx-e. 04� r- t Ca s 2 81 N. Co I LP cy ,v— 2Z1-lo&05 LEN N•LOFROis'/�ivr� Xca1 ��cocY (F_,) S- 7cr k FIRST A4ainStreet City of Fort Collins Engineering Department 28 t North College Avenue Fort Collins, Colorado 80524 Dear Sirs: First MainStreet 2900 5. College Ft, Collins, CO 30925 970.233.3535 Phone Wlvafirstminstrreercmm March 10, 2004 We hereby establish, at the request and for the account of Howes/Canyon, LLC, in your favor as beneficiary, our Irrevocable Letter of Credit No. 433, in the amount of One Hundred Thousand Dollars ($100,000) (as more fully described below), effective immediately and expiring at the close of banking business on March 10, 2005, at our office at 2900 South College, Fort Collins, Colorado. This Letter of Credit is intended for the funding required for the Cortina Development Project ("Development Project") for the assurance of the completion of the construction and the maintenance and repair of the public infrastructure in connection with the aforesaid development project and its associated development agreement and development construction permit. Funds under this Letter of Credit are available to you for one or more drawings prior to the close of business on March 10, 2005, against sight drafts in an aggregate cumulative amount not to exceed 5100,000, dated the date of presentment, drawn on our office referred to above, referring thereon to the number of this Letter of Credit and accompanied by your written certificate signed by you and acknowledged as therein provided in the form of Exhibit 1 hereto. Presentation of such draft and certificate shall be made at our office referred to above. Upon earlier of (i) our honoring your draft(s) totaling 5100,000 in the aggregate presented on or before this Letter of Credit expires pursuant to the terms herein or (ii) the surrender to us by you of this Letter ol'Credit for cancellation, this Letter of Credit shall automatically terminate. It is understood that the amount of this Letter of Credit may be reduced as public improvements are constructed and accepted by the City. As components of the infrastructure are satisfactorily completed in accordance with approved utility plans, the value of the completed components may be established from the Development Construction Permit worksheet for determining costs of infrastructm-c construction and inspection fees. whereupon the amount of this letter of credit may he reduced by the value of the completed component(s), upon execution of a "Request for Amendment to Lctter of Credit" in the form attached hereto as Exhibit 2. This letter of credit shall be subject to the Uniform Commercial Code as in effect in the State of Colorado, and, to the extent not inconsistent with the terms of this Letter of Credit and the Uniform Commercial Code, the Uniform Customs and Practice for Documentary Credits, 1993 revision, ICC publication number 500. This Letter of Credit will be automatically extended without amendments for one year from the present, and each future, expiration date thereof, unless Issuer delivers written notice at least sixty (00) days prior to any such expiration date to the City of Fort Collins of its intent not to renew this Letter of Credit. Any Such notice shall be in writing and shall be delivered with an acknowledged receipt, either in hand or by certified mail. Any amendments to this Letter of Credit shall be made in the form of Exhibit 2 hereto. The City may at any time request that the Bank amend this Letter of Credit by submitting to the Banl< a fully executed certificate in the form of Exhibit 2. The Bank_ may thereafter promptly issue an amendment to the Letter of Credit corresponding to the change or changes requested in such certificate. This Letter of Credit is not transferable. This Letter of Credit sets forth in full our undertaking, and such undertaking shall not in anyway be modified, amended, amplified or limited by reference to any document, instrument or agreement referred to herein, except only the certificate and draft(s) referred to herein; and any such reference shall not be deemed to incorporate herein by reference any document, instrument or agreement except for such certificate and draft(s). Issuing company name Address: Phone Number: First MainStreet Bank, N.A. 401 Main Street PO Box 1159 Longmont, CO 80502-1159 970-266-2014 Sincerely, hael D. on Vice President, Issuer