Loading...
HomeMy WebLinkAboutCHEROKEE FLYING HEIGHTS - Filed DCP-DEV. CONSTRUCTION PERMIT - 2004-07-23City of Fort Collins fiamsportation Services t_nt;ineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: _ '.' ; t Issuance Date: 7 J1c Project Name: _ Cherokee Flying Heights Project A.K.A.: Project Location: South of Laporte Avenue, west side of Taft Hill Road Permittee: Steve Flevotomos Apa Co Industries & Importers Inc. City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project Fees: Permit Application Fee (paid at the time of application) $ 0.00* Construction Inspection Fee (paid prior to issuance of this permit) $ 0,00* Total $ 0.00* Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 0.00* Form of security deposited with the City: N/A * Permit Application Fee, Construction Inspection Fee and Development Bond are waived as the project has been approved as 100% affordable housing a,,d is granted an affordahle housing exemption from these fees. PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project ' ngineer to incorporate into all design drawings and specifications the certification of all materials tasting by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the ( ity in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and 281 North College Avenue • I?O. Box 580 • Fort Collins, CO80522-0580 , (970) 221-6605 • FAX (970) 221-6378 www.kgov.com Addre�s: 210") \\ cst Drake Road. 4239, Fort Collins, CO 80526 I'honc numba't�): Ofhcc:970-482-5802 Cellphone 970-566-9999 - -- Fa\ number: 970 223-3878 1[mail: Landscape contractor Individual Namc: Steve I2levotomos CI'O ( ompam Name : Ap�wo Ind crrw� I Addre,,: I' I �-.l Main Street. Windsor. CO 80550 Phone nuntbcr(,): (M icc:0 70-674-1682 Ccl 1phone: 970-227-9130 IAy rumber:970-686-5426 IanaiI: quaI1-ygoneaaol.cont Other contractors and parties inN olved in the project: SUBMIT T11E FOLLOWING ITEMS (Required for all projects): 81 V " cope of the Site Plan • I'ropo;cd Project Schedule • Projccl quantities and cost estimate for all Of tile public improvements to be constructed. In ❑ddition_ include all pt'ivate improvements that are required to be inspected by the Citv Cor,lniction In,pectors. this information must be submitted in the format shown on the attached loan titled "Project Ohtantities and Cost Estimate Sheet." ADDITIONAL. SUBMITTALS (Required if checked): J I ral l is con rol plants) for the project J Propo,cd haul routes shown on a City map J Shop drao ings J OtIm CONSTRU('ION COORDINATION MEETING: A construction coordination meeting to discuss plans and ;pedal requirements for vour project. is required lot all development projects. The people raluircd to attend the inectingare the project Manager. Project Engineer, Developer. Architectl.and Plamta and General (contractor (if no General Contractor, representatives for each ofthe contractors c\pccted to \\or1, ('n Ihi, project) People to Attend: List the peoples names and titles for those who %v ill attend the pre- con,trliction ;ncetinu: Name Title tit il.a I I oraerson Stccc I'lcvotomos Dimitri Sodas Brian Shcar Ranum Castillo lim Galle,os iic,1 ski Architect/ Planner Developer Developer Engineer Excavation/ Concrete Utilities Paving ESTIMATFU COS"If OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infra,lructurc improvements that kill he constructed and accepted by the City to own and maintain. In addition prov ide the value of all private infrastructure improvcmcnts that the City will inspect ;uul rcyuirr ccrlilication for. l'he estimate shall be in the same format as the attached sheet titled "Project QMIIIIIHCc and Cosl I-stimate Sheet." Public infrastructure, estimated cost: $ Private infrastructure, estimated cost:$ I ccnif\ that Ihr in(ixmation on this permit application along with the required additional submittals are true and col "I to the hest of my kno%N ledge. and that in filing this application 1 am acting with the Lno\v Icdgc con,cnt and authority of the oNvncrs of the property (including all owners having legal or cquitahle intcrc,i in the real property. as defined in Section I ? ofthc CitN Code: and including common areas Ir_alh connected to or associated yaith the property which is the subject of this application) �Nithout \\ hose con,cnl and uuthorit\ the requested action could not IavNfully be accomplished. Pursuant to said authori N, I hcrchv Kermit (.itv officials to enter upon the property for purposes of inspection and, if necesxarN. to enter upon such propert\ to perlbrm vyork required of the applicant if the applicant were to fail to perlbnn the required �Nork. Applicant Signature Date: DCPPRECONSTRUCOONMEETING ATTENDANCE SHEET Contact name Company Name eI:, Address Phone Number 57 tJf rno 0�+❑ I� m rn. ci 0W N❑ M❑ NM 0 7 Z o 0 0 0 0 0 0 0 0 0 o J O LL T M N M V In Z r W O O M❑❑❑❑❑ w J U (L ❑ ❑ ❑ ❑ ��_.�.� m CL W O o 0 w Q z z r _ LL m J 0 0 0 0 0 0 O O O O O O O O O O O O O O O J (o (00000 m(om000000 Mmmm� 3 r y 00MMo0 0o0000000 000000 Z Z r v�f»e, E»rn� rn� F»e, e,����» M as ss e»(»(» (n 0 0 7 W U r r w 0 W z W U W > = W 22 wapr W w U)wa.m o Z z O a W O O O O O O 0 0 0 0 O N O N N 0 0 O O O O O O V O O m U) rL w 0 O O o 0 0 m kA o U) O EA N O N (O O O O O O O O O m m (O (O V 0 0 0 0 0 f� N �fJ N (A O m m— N N m O N WLLI r U m N ( N O f� N N O N N a rn N V m 0 a LL to a 0 N a r 47 V N (O V M V m In r N O m M V m EA EA fA N N > W V M fA E� to to Vj fA fA fR fA fA EA fA V' r- .- EA fA En fA z r 2' rr fA X 04LL J rFm(� F > O v)Z0 O r W _ U F 3 W W 0 0 0 0 0 O M (O �1J m I� O O rn O O O O (O ' N O O N o 2 I� o m 0 0 0 O (D m (O O O m 0 0 0 m M M N O O( _ z W r r O V fA V EA O U3 O O r O N (O O O m 0 0 0 M N (A (O O o M O O o O V EA [A fA O 0 EA fA fA fA k M V m O— N N— to V O H3 W �UO� vw i» �i» F 0 F-O (n m d'7LU0 � W 0 J L<WO Uz (n C �za r �W zCL CO u�O¢U 0 FO F- LU rn r (n N rn N M <t W W w f- W r� fA Z Z m W cr J n r 0 D w W LL 3 ? ri_0 p A W ¢ r ' J Z O ia- t=(7 IL�QO0 r (rii=)ma OU? z w o a F W 0 a (n o ( LU a 0M xx xxxx=xxxx ?m „ p fA LL LL } Y U U ll LL LL U U U U U U U U U (n } LL LL LL LL } K J r¢ J J U U¢¢ J J J¢¢¢¢ a¢ ¢¢ Q J (Q J J J (n QJ r p w z w W W W W W W W W W W W LL W = Q r 0 Z N w w 0 r m W o z a j 0 U W m r ~ a in ° �' D ar m zd X W O W 2 ` N w mN U) z ¢w de-75 o co w a ¢ w j fn C UU >> LL z J aU ~ c- E aJ ,Q z a. zma O0� mU :° aNi .� U) 3 ^-oU�v y m�� �¢ a N a@i .= n m m c o c c c (h '� U) r p LL J H Via¢ p N (n U`orm0 o e6 v) m� S�L(n_� o (D o�� s n H ¢w U r> E m U L wa`.�da N N L Ul 0 -O O > p W (/7 � `o C 0 C « m co m- m (o c 0 N N m m 0 m � m m m a a N S] N O N � m�� a� o n o a 0—. U) fn ff �H7-0 < �cn �F-�LT >: iL ��� in CD a- U❑d¢U LL~ 000000 0OgOOOOOOO O000000 OOOObO� OOOWWN -. 0 00 1 00 f9 (A N fA 0 w N'7 <T OOOO pp OO u 0 t w N V (D 1- FA O V O IL to, D w 0 N M N t 0 p w (9(9� p N NM AD, R' yNj A Vi HV9 N J W ': x Q Z H J W w J W m ~ IL w LL Q h`' O y W Z� fp z 00000o (O (D O O O O OO0000000 (D (D (D 000000'"HE J_ ~ } Z F O O M M O O (9 fA fA fA 0� 0� O O O O O O O O O (A fA fA 0 Mq 0 0 0 0 0 0` N fR fA fA (A f9 Z p O:3WU 6s 6q ~ 1- p w W W a > F- LU O w awa> > zLLn.m 00 000 O O `QT O O O ONO�N� 00 O M O V V 0OO000 000 V ppO(D O W O N n w O N LC) N 0 O Ctjj N N 0 O N ui w F- V 00 O V (L F- Q U p N It [t fA EA Y� fA fA 69 EA fR 0 0 M V W 69 Uj tof U) > A _ Q � a J q F' w OUQ 'L Fri w F- W U '.' w W = I� O M O O O M (0 u0 (D I- 0 0 0 0 O (O W (D 0 0 W O 0 (O V N 0 0 00 (O M M M O O 1� _ Z W F- Hi M N W M OOMO N O N V (9 (A f9NO p F-O~ Z w Q m (A Ui �n (A E9 (A 0� V W� O N»- M V O (A : w 0 � U D � F- »- (» vF : LU aiF¢w> VU W gazy�Ua">=[w F O z LL ZQUQUO0a�i O � (O O O O � O �� M I� M C N W � W� 0 0 1� (V V F- w 0 N M V .U✓. W W Sao .-(n Y.. W m Z F- � Z m W J J o ~ w } W U F I.- a rn +' Z w �>Q`:o z #-pHU a �¢om O z w�a 1*,wao w Uo LLW a Q? xx xxxx=xx ?m .0 NN LLLLY:UU LL LLLLUUUU UUU wY LL LL LL LLIL ',� J �Q JJUU W W JJ J W W W w W W W J(nJJJ(n(/j F-Q w 2 W = () LL (7 F W p ZO w W () m = F- J m Z O Q W K F Cl) IL U a Qz n x w 0 W °� o a (D u�i w(~/l (n Cw _ �_ J y U.o >< W U> __ N@ O N Y w O LL �O N F o aJ a¢ z Zkma. O p� o w al U ar ;° c 3 .--6 0 E @ y m� K �~ a. a@i .Y x? >' N U m F F- U W a J W J I- LL' Q Q N U U °� C7 ~ N `� fn m� 0E U) O) D_ �. >' c N V% 0 @ Q N 'C @ Q W Q U ♦— L N N O £ C C U O) C C I Ip L O u1 & N N N x 0) C C E o(} U N C w y -O 0) L@ 0 0 N > LL' F- w W m o o m-@ G> m@ m a m @ m @ m m a a� a a a pva i)wF-0 < �U3i F-E2i 2 i� (AU' d00LL¢U Z 0 J U Q W IL N O ? LL H } f 0 D w U P: w O w wap� IL }N N w d W 0 0 0 0 0 0 O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 o cD o 0 0 0 0 0 0 0 0 0 0 o M o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O Oi N O O N 0 0 0 0 0 N �O O LL� 0 0 0 0 0 0 0 0 0 0 0 0 O 7 �� W K Efl EA fA H3 EA � Vi r- EA fA 63 fA fA fA � U3 (fl fA fA EA EA fA to to tH Q Cl) � � M CO LL 0 0 W Z W j w 2 W r z F U O Z w a m 7 K K 7 w = W u~i�aawo LL O 0 LL O IL U Z U U O Q U W CO N N r W W 2 Z F � Y Z CO cl } LU ~ W W U Q � O W Z 00 wa a wOa LL w O X O 0 O 2 2 2 2 S S S S 2 S S S S S S S S N y U U U}}} N w N N W W W W U U U U N U LL LL W LL U U U U U U U U U U U U Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Z J J J d( J J J J J J J J J J J J J W W W W W W W W W W W W W W N U) U) W W W W 0 7 � w co U J O U Q > > N O U _(/1 L N N N J L L Z O N N C J H H N m m 2 LL N LL U V Q 2 a O @ w p w m m N 3 g H m° a> 3� `� c N LL 3 o m 3 G w w¢ y .� o L c" c�i U m cn °> m x x a 0 0 -� m— 3 N Z J N U N U O O o N C N- N S (M7 OM yt6 J ' J R O N@ QN ON >N >OJ W Z Om O M J U X-_ OC N' NQyN 3 3 O m fa' of 0 U w a > NX Ofr D OW❑NN X X UW O � dN 0 X¢a o U(UE N (n w m U) N i 4 D_ N 3 _ a> > oUU a�U Via oC7 voiU aa ca rox 2 cw cn wLL N c uw iva� o_ o_ x O�C7 oixo ixo U m"o w n UH!O 11 U (m N T U a- V co m co iL of co W cD cD w (M M W 13 J U Z W m uj Z W U- J J z 3 O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O W o 0 0 0 0 0 0 0 0 <> z w 0 0 0 0 0 0 0 of N 0 0 0 0 0 CO N O O I� Q OJ O Ql N �O r M O O M N W O O r 0 0 0 M �fJ W OJ G O O N W W Q :D O O O O OJ O O N r- r, m OJ N co O a co W co a � Q F � O LU a a W y w O 3 a O o W � N O O K (O O O ❑ t- Z N W a m � O LL Z ❑ J W a W F Z o J F J zz 3 xxxx xxx 0 0 0 U W U U U Y ��� x=x L a LL LL L L LL LL LL U U U a LL LL F-U a a L L (n } O Z -. J U J J J Q W W W W W W W W W W Q. U Z W p az N O zm > M ~ O U i U) Z Z N � O _ U c 7 W oe on in N N a a 01 C S W O N C U N @ = O a O U I- H 7) O d C Z of LU m 3 o i O J s Ea> M m @ O o w U a a .J y @ e aQ c� @ U _ W< C, m0 � a a>`�°v Fo o� � 3 m� 3 3L mQ m oaf �=O OZ ��� N� c c c 3M 3=Mi0 UL mU N @ -o @m 2 cn p m o a s@@@ 3 3 a U oa Naaa U �aaaacn >. >.a UJ d a K U c a N O U N N N N V N a @@ j N@ `° _- @ N -� W F �-a @ d f0 umo d) �v� � �U> �3�vC2 U U Y ='- ro p@ U S aO>> C @ N W@ >K U aO U p_ aUQ>> Q H aZ Development Construction Permit Page 2 of 6 "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: N/A 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Development Construction Permit Page 3 of 6 Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. lbApplicant/Project N[anager' s Signature: - '��1 2 ��s -- Date: -' "_Ze Approval far issuance: /, q .City Engineer Approval ; / rk Date: 17116 L (iYermo Issuance Date) Development Construction Permit Page 4 of 6 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Project A.K.A.: City Staff Contact Persons: Development Engineer: Construction Inspector: Name, address and numbers Cherokee Flying Heights Marc Virata / City of Fort Collins, 281 North College Avenue, Fort Collins, CO 80524 970 221-6605 x7188 Lance Newlin / City of Fort Collins, 281 North College Avenue, Fort Collins, CO 80524 970 217-4089 Current Planner: Cameron Gloss / City of Fort Collins, 281 North College Avenue, Fort Collins, CO 8052 970 221-6750 x6765 Water Utilities Engineer: Roger Buffington / City of Fort Collins, 700 Wood Street, Fort Collins, CO 80521 970 221-6854 Erosion Control Inspector: Bob Zakely / City of Fort Collins, 700 Wood Street, Fort Collins, CO 80521 970 221-6063 Natural Resources: Doug Moore / City of Fort Collins, 281 North College Avenue, Fort Collins, CO 80522 970 224-6143 Traffic Operations: Eric Bracke / City of Fort Collins, 625 Linden Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles / City of Fort Collins, 625 Linden Street, Development Construction Permit Page 5 of 6 Fort Collins, CO 80524 970 221-6815 Transportation Planning: Kathleen Reavis / City of Fort Collins, 215 N Mason Street, Fort Collins, CO 80524 970 224-6140 Forestry: Tim Buchanan / City of Fort Collins, 281 North College Avenue, Fort Collins, CO 80522 Light and Power: Doug Martine / City of Fort Collins, 700 Wood Street, Fort Collins, CO 80521 970 224-6154 Developer' Contact Persons: Developer: Steve Flevotomos, CEO Apa Co Industries & Importers Inc. / 1215-J Main Street / Windsor, CO 80550 Office: 970 674-1682 Cell: 970 227-9130 Fax: 970 686-5426 quarrystone@aol.com Owner: Michael Jensen Jensen Investment Group LLC / 1001-A East Harmony 515 / Fort Collins, CO 80525 mike@seadreamscentral.com Architect/Planner: Mikal Torgerson M. Torgerson Architects, P.C. / 223 N. College Avenue / Fort Collins, CO 80524 Office: 970 416-7431 Cell: 970 567-7431 Fax: 970 416-7435 mikal@architex.com Project Engineer: Brian Shear, P.E. Shear Engineering, Inc. / 4836 South College Avenue / Fort Collins, CO Office: 970 226-5334 Cell: 970 566-2939 Fax: 970 282-0311 bshear@shearengineering.com Development Construction Permit Page 6 of 6 General Contractor: Ramon Castillo Ramon Castillo Excavating & Contracting Service 766 Cottonwood Drive / Loveland, CO 80538 Office: 970 613-0387 Cell: 970 388-5262 DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/16/99) For City use onlh: Application Numher: (1�, y I ' Application permit application fee: S 300.00 INSTRUCTIONS: I. Complete this form (some questions may not apply to you) and attach all necessary documents and auhmit to the Development Engineering Section of the City. ?. II cou have any questions contact the Development Engineer _ at 221-6750. ;. Suhmit the Application and pay the Application Fee at the fee at the Engineering counter at 281 No. Cullcec Avcnne. PROJECT INFORMATION: Project Name (as approved by the City): Cherokee I Mng Heights Project A.K.A. (Marketing name if different from Project Name): Project Location: TaOI lill Road Property Owner(At the time of this permit issuance): Individual Name: Michael Iensen Company Name : klisen Investment f'rniy, I I C Addre,vs: 1001-A East Harmony 515 Fort Collins CO 80525 Phone number(,): limail Offcc: (ellphone: Pas numher: _ mikeu seadreamscentral.com Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsihIc for all matters relcrencing "the Developer" in the Development Agreement for this pro IccI): Individual Name: Mikal Torgerson C'ompam Name : M. Toreerson Architects P.C. Addre,s: 223 N. Colle,e Avenue Fort Collins CO 80524 Phone number(s): Office- 970-416-7431 Cellphonc:970-567-7431 I ay number: 970-416-7435 Finail: In kal"aarchites.com Permit tee( Person who is to sign the Development Construction Permit): Individual Name: Steve Flevotomos, CEO Compam Naine : Amon Industries Inc Address: 1215-.I Main Street. Windsor. CO 80550 Phonc nuntbcr(s): O fi ice:970-674-1682 ( ellphone: 970 227 -9130 Pas number:970-686-5426 Email: yuarrystonc rdaol.com Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible lur the dcsign of this project. responsible for certification that improvements are constructed in accordance �\ ith approved plans, responsible for making revisions to plans with City approval and for prov iding as-nmstructed plans): Individual Name: Brian Shear ('onyiam Name :'Shear Fngincerinu In- Adchc,, 4836 South College Avcnuc, Fort Collins CO Phone numba(s): Office: 970-226-5334 ( ellphone: 970-566-2939 Fax number: 970-282-03 11 kulail: bshcaCdishearengineering.com_ Prolcssional License Number: Architect/Planner (The person responsible for the site design of this project) India ideal Name: Mikal I oraerson Compam Name : M. Torgerson Architects. P.C. Address: 123 N. Colle-e Avenue. Fort Collins CO 80524 Phonc numher(s): (Ifl icc: 970-416-7431 Ccllphonc:970-567-7431 I :u number: 970-416-7435 Finail: inikal eParchitcs Developer( the parts or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement- -add additional names below): lmlly ideal Nmne: Steve Flewtomos, CEO Conlpem Name : Abaco Industries Ine Address: 1 ' I5-.I Main Street. Windsor, CO 80550 Phone numberls): Ofl ice:970-674-1682 ( ellphone 970-227-9130 I ax mimber970-686-5426 Email: quarnstoIIc(r,aol General Contractor ("fhe contractor in overall charge of the public infrastructure construction): Indk idusl Name: Steve Flcvotomos (TO Comham Name : Apaco 11j(jIISIII Iuc Addre<s 17I>-.I Main So'ect. Windsor CO 80550 Phonc nunil�er(s): OI'l o-,:970-674-1682_ Ccllphone:970-227-9130 Pay 11umber:970-686-5426 1'.111ail: yrn.lrncuai�l.uan_ y a If you have no General Contractor, list all other contractors below. Grading contractor: Indio idwd Name: Ramon Castillo Comham_ Namo., e: » „.. ('n:t ij�F. .ntin 1C'yrgni g Address 766 Cottonwood Drive Loveland . CO 90538 Phonc numher(s): Oflloz 970-61 3-0387 Ccllphone:.970-388-5262 Ian number: _ Ifmail: Utility contractor India ideal Mme: Jim Gallegos Compam Name: ^lle ySC'>Wr -t' Addren,: v42 Keeneland Way, W'ellimoon CO 80549 Phonc nunihci(s): Oflicc: 568-0083 Ccl1phonc:215-2916 P.0 numher: 970-568-3441 limail: jimhgalleeos�ci;aol.com_ Concrete contractor for flat work: Individual MImc: Ramon Castillo Compam N;nnc: RnmonC'1611CLriiaLino mid ( t' tit, SPrx7.e Address: 766 Cottonwood Drive. Loveland . CO 80538 Phonc nwnhcr(s): (Mice:970-613-0.387 Cd1phone: 970-388-5262 Ftiz number: 1`.mail: Concrete contractor for structures: India ideal Namc: Ramon Castillo ( oll)[mm'\ante: 16111oll F antiir 9nd(,omrm Mina CPm ice Addresx: 766 Cottomvood Drivc. Loveland .�CO 80538 Phonc nuinbcl(s): ( Mice: 970-613-0387 Ccllpdtone:970-388-5262 Pas numher: Ifmail: Paving contractor: Individual Name: Compam Namc