November 21, 2002
Steve Olt, City Planner
City of Fort Collins Planning Department
281 North College Avenue
Fort Collins, CO. 80524
Re: Waterglen Self Storage
Fort Collins, CO.
Dear Steve:
dcb construction Co. and Vista Ventures would like to extend our appreciation to
you and your staff on providing us a very quick and concise response to our
initial submittal of Waterglen Self Storage. We have thoroughly reviewed the
comments that were faxed to us and offer the following response to each item.
We have listed each of our response items below as they were presented. This
second submittal also includes the re -platting package from JR Engineering. Our
intentions are to submit construction plans to the building department prior to
Thanksgiving. Upon receipt of this package, please free to contact me directly
with any questions or concerns. It appears that our upfront meetings with
yourself provided us the direction to address the existing PUD correctly. We are
including product data, site photo's, and landscaping backup to further assist in
our re -submittal.
Current Planning -General Issues:
1. Please refer to attached plans for added fence detail. This is the
fence detail that was discussed earlier with you for your approval.
construction professionals since 1964
aCt7 —�
2. The horizontal metal siding on the storage units provides numerous
items that relate directly to the residential units. The metal siding
provided on the self storage units resembles the lapped masonite
on each of the residences in the proximity of this site.
We have attached a profile of the metal siding for your review.
Again, this profile emulates very closely the profile of the masonite
siding. The centerline distance from Rib to Rib is 6" in length. The
residential homes have ribbed masonite siding in either 8" or 4"
lengths.
Our color pallet has been attached for use. We have identified the
body color of the units and the accent and trim colors as well.
These colors are predominant in the residential area. We would
also like to point out that the paint color will be a flat finish and very
durable overtime.
`"" In regards to adding of masonry to the eastern side of the office
structure (bldg 1), we have attached photos of the site for your
review. Each of these homes, along 1-25 adjacent to our site, does
not have any brick masonry along this side. We would request
approval to keep our plans as designed.
'"** Refer to the landscape plan for the revised landscaping along
the residential southern side. Additional landscaping has been
revised to best meet this requirement.
3. The pavement of this facility, as recommended by our Geo-
technical Engineers, is Asphalt.
4. Refer to revised attached plans for enhanced landscaping along the
open fenced areas. These areas are very thick in landscaping. We
have attached a cut sheet and general information on this plant
material.
5. In previous discussions regarding the existing landscaping along
Waterglen Drive and adjacent to the eastern property line, It was
determined that the initial landscape construction of this lot met the
approved PUD. All materials in this area outside of the building
lines will remain as approved on this prior PUD. We have
thoroughly surveyed the site and confirmed this is accurate.
construction professionals since 1964
ac
Zoning:
1. Refer to attached plan for added fence detail. We attached and
noted the color of this perimeter fence. This fence color will match
the body of the self storage units.
2. Dimensions from the building to property line have been added to
sheet MA-1 as requested.
Engineering:
1. Here attached to our revised package is the re -plat of all of tract W
as required. This submittal has been completed by JR Engineering for
your review and approval.
Stormwater:
1. As per attached civil re -plating plans, the drainage easement has
been vacated. Refer to the grading plan within the set provided.
Thank you again. Please forward any comments to me directly at 303.746.7013
with any questions.
Sincerely;
Barr�A. Sherman
Vice President of Design
dcb construction co. inc.
cc: John Barna
Ken Crumb
Darren Zethre
Project Manager
dcb construction co. inc
construction professionals since 1964
NOV-20-02 02:44P
P.013
rr(;.6670
II
51/64 36* �D
T �I
3.5136' POU ROOF PANEL
U WAI.1 PANEL (inverted PRU HWf PeneO
J.'
LI—Nand
J.i- 1/5i 17 YOIO, •q IOInYM! .,^ '
orneW ,0Y1an[e O rM r/- 1/16'
i � 4OO
1
OnN-
FIGURE I
Standard Paint l
for RiboRoof"Panel aav ;;
p ___ Optional Colors are Available as Cl_i5
1\ l B ROOF . Cerma-A-Star 950 Paint Svs`em
AKZO Nobel Coatings
RiboRoof Panel
{tir,
J"tt�M :"pa�(is
eCSVN b tt ,i�� g4 d;N`
I
<�Y.�e vi xjlylq
t�e(ers- •`
A X,'SfJT
* Tau"
Manufacturing Facilities
nio •nvvr �rv�.
2745 N. Locust Ave • Rialto, CA 92377
(909) 875-8529 • Fax (909) 823-4786
CA License U610595
Tennessee
RIB -ROOF INC.
570 Morrison Rd. • Rossville. TN 38066
(901) 853-9062 • Fax (901) 8b3-2393
�, ,
�'� 4 4 .�P :. -
ti,
ram.--� ,, y ^�
��
':;.... �� r . N.
1 yl
� �� ,
Via.,",5...�._ .`�
t �,
D� �A � f�
.- , f F J � �<xl �
K�
May 30, 2003
Mr. Basil Hamdan
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, CO 80521
J
J R ENGINEERING
RE: Waterglen P.U.D. — Drainage Addendum for Tract W, "Waterglen Self Storage"
Dear Basil:
We are pleased to submit for your review and approval this addendum showing the minor
changes being made to the approved Tract W, Waterglen P.U.D. dated 11/6/98. Tract W is still
considered a commercial development as previously approved in the Final Drainage and Erosion
Control Report Waterglen, P.U.D. dated August 11, 1997 and the Addendum to Final Drainage
and Erosion Control Report Waterglen, P.U.D. dated May 18, 1999. The only existing basins
affected by the revised development are Basins S-1, T-3 & 0-3R. Attached is sheet 29A/31A of
84 showing the revisions to Tract W.
Existing basin S-1 has reduced in size by 0.27 acres from 7.74 acres to 7.47 acres of commercial
area. This contributing area on Tract W currently drains across the existing residential lots to the
south. With this proposed development the contributing area is redirected to basin 0-3R. This
will thereby reduce the amount of water going to design point 22 and reduce the resulting
carryover to design point 25 and existing Pond D.
Existing basin T-3 has also reduced in size. The current size of basin T-3 is 2.99 acres. The
revised basin is 2.55 acres. The difference of contributing area, being 0.44 acres, will be directed
towards basin 0-3R. This will reduce the amount of runoff to design point 21 and existing Pond
D.
Basin 0-3R was reported in the May 1999 Addendum as having a contributing area of 6.53 acres
and a runoff coefficient (C) of 0.35. With this addendum, the revised area of basin 0-3R is 7.24
acres and a revised C of 0.41. The time of concentration shall remain the same at 23.8 minutes
for the 10-year and 100-year events as shown in the approved drainage report mentioned above.
This means that the peak flow from Basin 0-3R is increased from 16.9 cfs to 17.5 cfs in the 100-
year event. Basin 0-3R ultimately releases into existing Pond F.
Existing Pond F contains all the required water quality capture volume for the runoff originating
in the contributing areas to existing Ponds D, E and F. Therefore, changing the sizes of the
2020 Past Prospect Road, Suite 190, Fort Collins, CO 80525
970-491 '9888 • Fax:970-491-9984 • www.irengineering.com
current basins and rerouting the water to the existing ponds will not affect the water quality
volumes required as mentioned in the approved drainage report.
Existing Ponds D, E, and F were all modeled by Lidstone & Anderson, Inc. and reported in the
Regional Drainage Evaluation for the Waterglen P.U.D. dated November 30, 1998. These ponds
are hydraulically connected in the following manner. Pond D's outlet releases into Pond E and
Pond E's outlet releases into Pond F. Pond F discharges into Cooper Slough. The pond outlets
act as orifices and the water surface of each pond produces a tail water effect on the upstream
pond's outlet. Therefore, the water surface of Pond F controls the release of Pond E and the
water surface of Pond E controls the release of Pond D.
The proposed development will redirect the runoff from the revised basins to Pond F instead of
the current flow path to Pond D. This will raise the water surface of Pond F faster than originally
designed. However, this will in turn restrict the releases from Pond E until Pond E builds
enough head to push flows through its outlet structure. The water surface elevation in Pond E
required to do this will still be the same water surface elevation as in the approved drainage
report for Waterglen P.U.D. As the water surface in Pond E rises, the flows leaving Pond D will
be restricted until the water surface elevation in Pond D reaches the same water surface elevation
as that approved in the above mentioned drainage report for Waterglen P.U.D. The control in
this situation is the sizing of the pond outlets acting as orifices and the required head differential
between ponds to pass the previously designed flows.
JR Engineering has reviewed and concluded that the revised development will not negatively
impact the site storm sewer system in any way and that the existing detention ponds are
adequately sized for the proposed development. All computations within this addendum have
been completed in compliance with the most recent rainfall data and the City of Fort Collins
Storm Drainage Design Criteria.
We appreciate your time and consideration in reviewing this If you have any
questions or need additional information please call (970) 491- PQO RP��
3HA{yN,sTF,9
Prepared by: evi: ey-- :. o
A
Amber Kauffman, E.. M
Design Engineer II Di
X-\3o10M) ii11\3914510\Word\Lcllcn\dru111agc updaec.J,k