HomeMy WebLinkAboutSHAW REPLAT - Filed CS-COMMENT SHEETS - 2004-07-15PROJECT
COMMENT SHEET
REC. D
Current Planning
DATE: October 31, 2003 TO: Technical Services
PROJECT: #36-03 SHAW REPLAT— TYPE I (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
November 26, 2003
Note - PLEASE identify your redlines for future reference
RO`j ar THE c % �.V�
// II �T2�aT L/��C�/Zmi/c1ET0
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ lat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
2:
�q STAFF PROJECT REVIEW
(avni Io4 Collin.
Stewart & Associates Date: 2/11/2004
c/o Jack. Blake
103 South Meldrum Street
Fort Collins, CO. 80521
Staff has reviewed your subm_ttal for the SHAW REPLAT - TYPE I
(LUC), and we offer the following comments:
ISSUES
Department: Current Planning Issue Contact: Steve Olt
Topic: Gas Service
Number: 31 Created: 2/11/2004
[2/11/04] Len Hilderbrand of Xce_ Lnergy offered the
following comments:
a. Gas meters will need to be located on the west wall of a
building on Lot 2 and the east wall of a building on Lot
3 to meet the minimum clearances to water and sanitary
sewer.
b. There is an existing gas main that lays 21' north of the
south right-of-way line of Elm. Street. Street/asphalt
cuts will be required to install gas services.
Topic: General
Number: 32 Created: 2/11/2004
[2/11/04] There are still some discrepancies between
title/names shown the plat and the utility plans. In all
cases, the title/name should be Shaw Replat, not PDP.
Number: 33 Created: 2/11/2004
[2/11/04] The replat and utility plans are in a condition
that this request can now be sched>>led for an admin'-strative
public hearing. There are items that have to be addressed and
changes made; however, this can be done through final plan
checks after the public hearing.
Steve Olt will assist you in scheduling the public hearing. It
will take place some weekday evening, probably starting at
6:00 p.m. and will be held in a conference room at 281 North
College Avenue. The administrative public hearing officer is
yct to be identified and, therefore, availability is unknown.
Pa,e I
Also, a letter of notification to Affected Property Owners
(APO) within 500' of the property, in all directions, must be
mailed out by the Current Planning Department at least 14 days
prior to the public hearing. This requirement is set forth in
Section 2.2.6 of the City's Land Use Code. I see no record of
an APO list being included in the original submittal of the
Shaw Replat and I find no APO list in our files. One must be
submitted as soon as possible (see attached information about
the APO submittal requirement), so that the public hearing can
be scheduled and Affected Property Owners appropriately
notified.
Topic: Plat
Number: 30 Created: 2/11/2004
[2/11/041 Wally Muscott of the Technical Services Department
offered the following comments:
a. The legal description does not close or match the plat.
The plat, as drawn, closes.
b. The plat name does not match the Ownership & Subdivision
statement.
C. The Basis of Bearings does not match the monumentation
described on the plat.
Please contact Wally, at 221-6605, if you have questions about
these comments.
Department: Engineering Issue Contact: Katie Moore
Topic: General
Number: 8 Created: 11/21/2003
[2/4/04] How the alley ROW was dedicated was not addressed.
[11/21/031 How was the ROW for West St, Elm St. and the alley
originally dedicated?
Number: 9 Created: 11/21/2003
[2/4/04] A F`i'I reminder.
[11/21/031 A Development Agreemen7: will be needed for this
subdivision to address concerns about the alley and sidewalk
improvements. The alley will have to be designed and
constructed if more than one dwelling unit takes access off of
it. The current sidewalk along Elm St does not meet
standards, so each lot would be responsible for constructing a
sidewalk to standards as it develops.
Page 2
Number: 23 Created: 2/4/2004
[2/4/04] Please see redlines for any additional comments.
Number: 24 Created: 2/4/2004
[2/4/04] Utility easement widths on the utility plan don't
match the plat. Please have them match the plat.
Number: 25 Created: 2/4/2004
[2/4/04] Driveways are required to be straight for 25' from
the curb. Please reconfigure the driveway off of Elm.
Number: 26 Created: 2/4/2004
[2/4/04] Concentrated flows and flows from areas greater than
650 s.f. are riot allowed to flow over a public sidewalk, and
this is what is proposed as shown on the grading plan. Please
re -grade and/or provide an under -walk drain (D-10).
Topic: Plat
Number: 22 Created: 2/4/2004
[2/4/04] Please provide the dimensions of the width of the
driveway easement as it abuts the 3OW and the distance from
the lot corner to the driveway easement.
Department: Stormwater Utility Issue Contact: Wes
Lamarque
Topic: Drainage
Number: 27 Created: 2/6/2004
Please include half of Elm Street and half the alley in the
impervious calculations. The alleys should be assumed paved
for the purpose if this calculation. The allowed impervious
area without detention is 50% for ibis basin.
Number: 28 Created: 2/6/2004
The existing inlet needs to be in good condition to be a part
of this design due to increased flows. If the inlet is not in
good condition, a new inlet per current City standards would
need to be installed.
Topic: Erosion/Sediment Control
Number: 29 Created: 2/6/2004
Erosion Control should still be looked into and a design
shown. There should be protection for Arthur Ditch (silt
fence, etc.) and inlet protection for the inlet on Elm Street.
The escrow is adequate.
Page 3
Department: Water Wastewater
Topic: General
Number: 21
[1/30/04] Water services may n
water service for lot 3 to avoi
Show locations of existing gas
feet minimum separation between
gas and electric lines.
See utility plans and replat fo
Be sure and return all reclined
If you have any
issues related
(970) 221-6341.
Yours Truly,
Steve Olt,
City Planner
questio
to this
Issue Contact: Jeff Hill
Created: 1/30/2004
of cross adjacent lots. Adjust
d crossing corner of lot 2.
and electric mains. Maintain 4
curb stop/meter pits and all
r other comments
plans with any re -submittal.
ns regarding th
project, please
cc: Katie Moore, City Engineering
John Shaw, Property Owner
Page 4
ese issues or any other
feel free to call me at
6aProject Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: Nlarch 2, 2004
Project: SiHAW REPLAT - TYPE I (LUC)
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
March 10, 2004
Note - Please identify your redlines for future reference
Issue Contact: (Katie Moore
Topic: General
Number: 8 Created: 11 /21 /2003
[312104] Thank you for letting me know in the comment letter how the ROW was dedicated, but it should be labeled on the plat
as well. See redlines.
[2/4/04] How the alley ROW was dedicated was not addressed.
[11/21/031 How was the ROW for West St, Elm St. and the alley originally dedicated?
Number: 9 Created: 11/21/2003
[3/2/04] 12/4104] FYI reminder
[11121/03] A Development Agreement will be needed for this subdivision to address concerns about the alley and
sidewalk improvements. The alley will have to be designed and constructed if more than one dwelling unit takes
access off of it. The current sidewalk along Elm St does not meet standards, so each lot would be responsible for
constructing a sidewalk to standards as it develops.
Number: 23 Created: 2/4/2004
[312/04] [2/4/04] Please see redlines for any additional comments.
Number: 25 Created: 2/4/2004
[3/2104] A variance request for this item was received and approved. Please list this approval in the general notes.
[2/4/04] Driveways are required to be straight for 25' from the curb. Please reconfigure the driveway off of Elm.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓ Plat Site Drainage Report Other&t$
l
Utility Redline Utility Landscape
Page 1
. ; STAFF PROJECT REVIEW
Citvot lmrt c ollm'
Stewart & Associates Date: 03/18/2004
c/o Jack Blake
103 South Meldrum Street
Fort Collins, CO. 80521
Staff has reviewed your submittal for SHAW REPLAT- TYPE I (LUC), and we
offer the following comments:
ISSUES:
Department: Engineering
Topic: General
Number: 8
Issue Contact: Katie Moore
Created:11/21/2003
[3/2/04] Thank you for letting me know in the comment letter how the ROW
was dedicated, but it should be labeled on the plot as well. See redlines.
[2/4/04] How the alley ROW was dedicated was not addressed.
[11/21/03] How was the ROW for West St, Elm St. and the alley originally
dedicated?
Number: 9 Created: 11/21/2003
[3/2/04] [2/4/04] FYI reminder
[11/21/03] A Development Agreement will be needed for this subdivision to
address concerns about the alley and sidewalk improvements. The alley will
have to be designed and constructed if more than one dwelling unit takes access
off of it. The current sidewalk along Elm St does not meet standards, so each
lot would be responsible for constructing a sidewalk to standards as it develops.
Number: 23 Created: 2/4/2004
[3/2/04] [2/4/04] Please see redlines for any additional comments.
Number: 25 Created: 2/4/2004
[3/2/04] A variance request for this item was received and approved. Please
list this approval in the general notes.
[2/4/04] Driveways are required to be straight for 25' from the curb. Please
reconfigure the driveway off of Elm.
Page 1
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 34 Created: 3/9/2004
The swole at the back of the lots needs to be included in the drainage
easement. The swale can be moved closer to the lot line, or the drainage
easement can be enlarged.
xxxxxxxxxxxxx,tx+�xxxxxxxxxxx,txxxxxxxxxxxxxx,txxxxxxyr*xxxxic*xxxxxxxxx,txxx
This item has been scheduled for an administrative public hearing on Tuesday,
March 23, 2004, beginning at 5:30 p.m., at 281 North College Avenue. The
issues and concerns expressed in this letter can be addressed with your Final
Compliance plan submittal after the public hearing. Be sure and return all red -
lined plans when you submit Final Compliance.
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
If you have any questions regarding these issues or any other issues related to
this project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt,
City Planner
cc: Katie Moore
John Shaw
Current Planning file #36-03
Page 2
SHAW REPLAT
STEWART &c ASSOCIATES RESPONSES TO STAFF PROJECT REVIEW
CURRENT PLANNING:
TOPIC: GAS SERVICE
Existing gas lines platted on Utility Plans
TOPIC: GENERAL
16. Revised Misspelled Arthur Ditch
17. Revised Shaw P.D.P. to be Shaw Replat
19. Submitting Utility Plans
ENGINEERING:
3. Provided 6' UE-8' may conflict with existing house
4. Added 9'UE along West Street
5. Revised easements
6. Added legend
8. Dedicated an original Capitol Hill plat
9. Acknowledged need for development agreement
14. Submitting Utility Plans
15. As of now, developer is not pursuing the vacation of West right-of-way.
LIGHT AND POWER
I. Acknowledged fee requirement
NATURAL RESOURCES
10. Acknowledged
POLICE:
7. Acknowledged
STORMWATER UTILITY:
13. Submitting Utility Plans
WATER WASTEWATER:
11. Submitting Utility Plans
12. Added 6-foot UE
ZONING:
2 Acknowledged
Staff review comments of November 26th, 2003 meeting have been addressed.
SI IA W 'If III j tev fopm 6 c Ant
Project Comments Sheet
Selected Departments
Department: Engineering
Date: December 3, 2003
Project: SHAW REPLAT - TYPE 1 (LUC)
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
November 26, 2003
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 3 Created: 11 /5/2003
[ 1 1 /5/03] Please provide an 8' utility easement along the Alley ROW.
Number: 4 Created: 11 /5/2003
[11/5/031 Please provide the standard 9' utility easement along West Street.
Number: 5 Created: 11 /5/2003
[ 1 1 /5/031 Please clarify that the driveway easements are separate private easements not being dedicated to the City, and
clarify who they are being dedicated to.
Number: 6 Created: 11 /5/2003
[11/5/031 Please define UE and DE. (Provide a legend)
Number: 8 Created: 11/21/2003
[ 1 1 /21 /03] How was the ROW for West St, Elm St. and the alley originally dedicated?
Number: 9 Created: 11/21/2003
[ 1 1 /21 /031 A Development Agreement will be needed for this subdivision to address concerns about the alley and
sidewalk improvements. The alley will have to be designed and constructed If more than one dwelling unit takes access off
of it. The current sidewalk along Elm St does not meet standards, so each lot would be responsible for constructing a
sidewalk to standards as it develops.
Number: 14 Created: 12/3/2003
[ 12/3/031 Please submit a utility plan set per LCUASS.
Number: 15 Created: 12/3/2003
[ 12/3/031 Prior to formal submittal of this replat, the developer asked about the possibility of vacating ROW on West
Street. As noted on the plat, some vacation of ROW on West Street has already occurred, and the question of vacating
more ROW was raised. If further ROW vacation proposed by this development, then a formal request for that vacation
will need to be submitted to the City and routed to all affected parties. The only ROW the City sees as a possibility for
further vacation is the triangular portion adjacent to this replat, but this is a preliminary assessment and would, again, need
to be routed to and approved by all affected parties (utilities, City departments, neighbors) and would also need to be
approved by City Council. The instructions for requesting ROW vacation are attached.
T
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
Page 1
,, STAFF PROJECT REVIEW
Cite of Pnrt Cullnu
Stewart & Associates Date: 12/3/2003
c/o Jack Blake
103 South Meldrum Street
Fort Collins, CO. 80521
Staff has reviewed your submittal for SHAW REPLAT (PDP) - TYPE I
(LUC), and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Gas Service
Number: 19 Created: 12/4/2003
[12/4/03] Len Hilderbrand of Xcel Energy offered the following
comments:
a. Existing gas mains are located on the east side of West
Street, south side of Elm Street; and, on the east side of the
north - south alley between North Shields Street and West
Street.
b. Gas service to 1112 Elm Street attaches to the gas main
located in the allev to the west.
Topic: General.
Number: 16 Crewed: 12/4/2003
[12/4/03] Spelling of the Arthur Ditch is incorrect (Aurther) on
the Vicinity Map on the subdivislor, pia:.
Number: 17 Created: 12/4/2003
[12/4/03] The title of the subd_vision plat should be "Shaw Replat"
instead of "A Plat of Shaw PDP".
Number: 18 Created: 12/4/2003
[12/4/03] City staff is requesting that utility plans be submitted
for review. An administrative public hearing will not be scheduled
for this development request until utility plans are provided and
reviewed.
Department: Engineering
Topic: General.
Issue Contact: Katie Moore
Number: 3 Created: 11/5/2003
[11/5/03] Please provide an 8' utility easement along the Alley
ROW.
Number: 4 Created: 11/5/2003
[11/5/03] Please provide the standard 9' utility easement along
West Street.
Paee I
Number: 5 Created: 11/5/2003
[11/5/03] Please clarify that the driveway easements are separate
private easements not being dedicated to the City, and clarify who
they are being dedicated to.
Number: 6 Created: 11/5/2003
[11/5/03] Please define UE and DE. (Provide a legend)
Number: 8 - Created: 11/21/2003
[11/21/031 How was the ROW for West Street, Elm Street, and the
alley originally dedicated?
Number: 9 Created: 11/21/2003
[11/21/031 A Development Agreement will be needed for this
subdivision to address concerns about the alley and sidewalk
improvements. The alley will have to be designed and constructed if
more than one dwelling unit takes access off of it. The current
sidewalk along Elm Street does not meet standards, so each lot would
be responsible for constructing a sidewalk to standards as it
develops.
Number: 14 Created: 12/3/2003
[12/3/03] Please submit a utility plan set per LCUASS.
Number: 15 Created: 12/3/2003
[12/3/033 Prior to formal submittal of this replat, the developer
asked about the possibility of vacating ROW on West Street. As
noted on the plat, some vacation of ROW on West Street has already
occurred, and the question of vacating more ROW was raised. If
further ROW vacation proposed by this development, then a formal
request for that vacation will need to be submitted to the City and
routed to all affected parties. The only ROW the City sees as a
possibility for further vacation is the triangular portion adjacent
to this replat, but this is a preliminary assessment and would,
again, need to be routed to and approved by all affected parties
(utilities, City departments, neighbors) and would also need to be
approved by City Council. The instructions for requesting ROW
vacation are attached.
Department: Light & Power Issue Contact: Doug Martine
Topic: Light & Power
Number: 1 Created: 11/4/2003
[11/4/033 Normal Electric Development Charges plus costs to modify
the electric system due to the requested replat will apply. Contact
Light & Power Engineering at 221-6700 to coordinate power
requirements and costs.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 10 Created: 11/25/2003
[11/25/031 No Issues with the replat.
Page 2
Department: Police
Topic: General
Number: 7
[11/10/03] No comments.
Issue Contact: Joseph Gerdom
Created: 11/10/2003
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 13 Created: 11/26/2003
Please provide a grading and erosion control plan showing proposed
buildings with F.F. elevations as well as existing and proposed
contours. Erosion control notes and proposed mitigation should be
included on this plan.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 11 Created: 11/26/2003
[11/26/03] Please provide a utility plan that shows the existing
water, sewer, electric and gas as well as any proposed services.
Number: 12 Created: 11/26/2003
[11/26/031 Provide a 5 foot utility easement along the west side of
the proposed Lot 1 for the existing sanitary sewer line.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: General
Number: 2 Created: 11/4/2003
[11/4/03] No comment
The following comments were expressed at staff review on November
2Ch.
Engineering:
1. The legal description does not close or match the subdivision
plat.
2. A set of utility plans must be submitted to the City for review.
Water/Wastewater:
1. A set of utility plans must be submitted showing, as a minimum,
the existing utilities around and to this property.
Stormwater:
1. A grading & erosion control plan must be submitted to the City
for review.
Page 3
Light & Power:
1. The normal electric development charges will apply to this
request.
2. There may be system modification charges associated with
development on this property and these charges will be at the
property owner's expense.
This completes staff (and outside reviewing agencies) review and
comments at this time. Additional comments and red -lined plans may
be forthcoming. Another round of staff review is determined to be
necessary to enable City staff to receive and review utility plans.
This proposal is subject to the 90-day revision re -submittal
requirement (from the date of this comment letter, being December 3,
2003) as set forth in Section 2.2.11(A) of the Land Use Code. Be
sure and return all of your red -lined plans when you re -submit The
number of copies of each document to re -submit is shown on the
attached Revisions Routing Sheet.
If you have any questions regarding these issues or any other issues
related to this project, please feel free to call me at 221-6341.
Yours
oourr s' ,nTr/u�lly(},�
4 CN � `
Steve Olt
City Planner
cc: Katie Moore, City Engineering
John Shaw
Current Planning File #36-03
Page 4
tix Project Comments Sheet
low
Selected Departments
City of Fort Collins
Department: Engineering
Date: February 4, 2004
Project: SHAW REPLAT - TYPE I (LUC)
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
February 04, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 8 Created: 11/21/2003
[2/4/041 How the alley ROW was dedicated was not addressed.
[11/21/031 How was the ROW for West St, Elm St. and the alley originally dedicated?
Number: 9 Created: 11 /21 /2003
[2/4/041 FYI reminder
[ 1 1 /21 /031 A Development Agreement will be needed for this subdivision to address concerns about the alley and
sidewalk improvements. The alley will have to be designed and constructed if more than one dwelling unit takes access off
of it. The current sidewalk along Elm St does not meet standards, so each lot would be responsible for constructing a
sidewalk to standards as R develops.
Number: 23 Created: 2/4/2004
[2/4/041 Please see redlines for any additional comments.
Number: 24 Created: 2/4/2004
[2/4/041 Utility easement widths on the utility plan don't match the plat. Please have them match the plat.
Number: 25 Created: 2/4/2004
[2/4/041 Driveways are required to be straight for 25' from the curb. Please reconfigure the driveway off of Elm.
Number: 26 Created: 2/4/2004
[2/4/041 Concentrated Flows and Flows from areas greater than 650 s.f. are not allowed to Flow over a public sidewalk,
and this is what is proposed as shown on the grading plan. Please re -grade and/or provide an under -walk drain (D-10).
Topic: Plat
Number: 22 Created: 2/4/2004
[2/4/041 Please provide the dimensions of the width of the driveway easement as it abuts the ROW and the distance from
the lot corner to the driveway easement.
Date
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat I Site Drainage Report Other
_ z Utility —77— Redline Utility Landscape
Page 1
REC. D
REVISION
COMMENT SHEET
DATE: January 21, 2004 TO: Technical Services
PROJECT: 936-03 Shaw Replat — Type I (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
February 4, 2004
❑ No Comment
pProblems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
/�. LgE6AL Does nlo7- C�Co pQ mR-C11 %1� �/4- FGgT eZal s AS 7 aJn
G../N?! t.✓Ani� DGC$ NcT rr f1YC!-I %f'i� 0�+/NL-fLS �i1PJJU6D�Vi Sr on•` S7/}rv:c..'".
%j, �/f5r5 d� �Ei��'rniG �S DacS �Yloi /i9fIT%'Lf �'c�NLUN cti7/l T�crJ Z>ESCEr!3c�7 GjV;�Ci+�.
z.q.�1
Name ( lease print) Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape c;n of Fort colons