HomeMy WebLinkAboutVILLAGE WEST SIXTH - Filed DA-DEVELOPMENT AGREEMENT - 2004-03-10AGRELYENT
THIS AGREEMENT is made and en.tcred into this _ 4�v day of
A.D. 19 2 by and between THE CITY OF
FORT COLLINS, COLORADO, a municipal corporation, hereinafter sometimes designated
as the "City", and Bartran Homes, Inc. hereinafter designated as the
"Developer",
WITNLSSETH:
WHEREAS, Developer is the owner of certain property situate in the
County of L.arimer, State of Colorado, more particularly described as Village West
Sixth Filing; and
WHEREAS, Developer desires to develop said property as a residential
subdivision and has submitted to the City a plan showing a proposed subdivision
layout for said lands, a copy of which is on file in the office of the City Engineer,
and by this reference made a part hereof; and
WHEREAS, Developer has further submitted to the City a utility plan for
said lands, a copy of which is on file in the office of the City Engineer and by
this reference made a part hereof; and
WHEREAS, the parties hereto have agreed that the development of said
lands will require increased municipal services from the City in order to serve
such area and will further require the installation of certain improvements
primarily of benef't to the lands to be developed and not to the City of Fort
Collins as a whole; and
WiHIREAS, the City's planning and zoning board has approved the plan
submitted by the Developer subject to certain requirements and conditions which
involve the installation of and construction of utilities and other municipal
improvements in connection with said lands.
NOW, THEREFORE, in consideration of the premises and the terms and
conditions herein stated and for other valuable consideration, the adequacy of
which is acknowledped by the parties hereto, it is agreed as follows:
1. Except as otherwise herein specifically agreed, the Developer
agrees to install and pay for all utility lines, storm drainage facilities,
streets and other municipal facilities necessary to serve the lands described on
the subdivision plat such lines, streets and facilities including, but not limited
to, those shown on the utility plan.
2. Water Lines.
a. Developer agrees to install all water lines as shown on the
utility plans in accordance with the requirements and as shown on said plans,
whether such lines are actually on the property, bordering the property or on
other lands connecting the subject property to the existing City water
distribution system.
b. Such water lines shall be installed in full compliance with
the standard specifications of the City on file in the office of the City Engineer
relating to the installation of such lanes.
C. Developer understands and agrees that no building permit for
any structure in the subdivision shall be issued by the City until the fire hydrant
serving such structure is installed and accepted by the City.
the Developer.
d. All of said lines shall be installed at the sole expense of
-2-
e. The installation of said line shall be inspected by toe
Engineering Services Department of the City and shall be subject to such
department's approval. Developer agrees to correct any deficiencies in such install-
ation in order to meet the requirements of the plans and the specifications
applicable to such installation.
3. Sanitary Sewer Collection Lines.
a. The Developer agrees to install all sanitary sewer collection
lines shown on the utility plans, whether the same be on or off the subject property.
b. Such sanitary sewer lines shall be installed in full compliance
with the standard specifications of the City on file in the office of the City
Engineer relating to the installation of such lines.
C. Developer understands and agrees that no building permit shall
be issued by the City for any structure in the subdivision until the sanitary sewer
line serving such structure is installed and accepted by the City.
the Developer.
d. ALl of said lines shall be installed at the sole expense of
e. The installation of said lines shall be inspected by the
Engineering Services Department of the City and subject to such department's
approval. Developer agrees to correct any deficiencies in such installation in
order to meet the requirements of the plans and the specifications applicable to
such installation.
4. Electric Lines and Facilities. The City Light and Power Department
shall install all electric distribution lines and facilities required for the
subject property and the Developer shall pay for such work in accordance with
the established charges of the Light and Power Department. Such installation shall
include all street lights required for the development.
-3-
5. Storm Sewer Lines and Facilities.
a. The Developer shall install all drainage facilities shown on the
utility plans. It is understood that such lines and facilities do riot
represent all of the Developer's obligations.
b. Such drainage facilities shall be installed in full compliance
with the standard specifications of the City on file in the office of the City
Engineer relating to the installation of such lines.
C. Developer agrees to submit plans for the stormwate.r runoff detention
system to the City Engineer for his approval. Developer proposes to locate the
detention pond directly east of said lands, and west of tire New Mercer Canal.
Said plans shall he submitted for approval and construction of said detention pond
completed within one year of the date first hereinabove written.
d. All of said facilities shall be installed at tire sole expense
of the Developer.
e. The installation of all of such facilities shall be inspected
by the Engineering Services Department of the City and shall be subject to such
department's approval. Developer agrees to correct any deficiencies in such install-
ation in order to meet the requirements of the plans and the specifications applicable
to such installation. In the event such installation is not completed and approved
within the time set forth above, the City shall have the right to cause such
additional work to be done as it deems necessary to complete the installation in
a satisfactory manner and the Developer shall be liable for the cost of such
additional work.
6. Streets.
a. The Developer agrees to install all streets shown on the utility
plan, complete with asphalt paving, curb, gutter and sidewalks.
b. Such streets shall be installed in full compliance with the
standard specifications of the City on file in tire office of the City Engineer
-4-
relating to the installation of such lines.
C. Developer agrees to complete the installation of street
improvements no later than within one year of the date first hereinabove written.
d. No 'building permit for the construction of any structures in the
subdivision shall be issued by the City until the street providing access to
the structures is improved with at least the gravel base required.
e. The installation of all streets shall be inspected by the
Engineering Services Department of the City and subject to such department's
approval. Developer agrees to correct any deficiencies in such installation in
order to meet the requirements of the plans and the specifications applicable to
such installation. In the event the improvements are not completed and approved
within the time set forth above, the City shall have the right to cause such
additional work to be done as it deems necessary to complete the installation in
a satisfactory manner and the Developer shall be liable for the cost of such
additional work, including all normal charges made by the City for financing,
engineering, publication, legal and miscellaneous on City Special Street Improvement
Districts.
f. Street Improvements small not be installed until all utility
lines to be placed in the street have been completely installed and all services to
individual lots have been installed from main utility lines to the property line.
-5-
This agreement shall be binding upon the parties hereto, their
heirs, personal representatives and assigns.
IN WITNESS WHEREOF, the parties hereto have caused this agreement to
be signed the day and year first hereinabove written.
ATTEST:
City C1crk
APPROVED:
i
Director of Engineerig' services
i
City Attorney
THE CITY OF FORT COLLINS, COLORADO
By 0AA f. Q.,�.vJIAr..J
City Manager
l
Developer
-6-