HomeMy WebLinkAboutCRAFTS RESUB 1220 SOUTH COLLEGE AVENUE - Filed DA-DEVELOPMENT AGREEMENT - 2004-02-12DEVELOPMENT AGREEMENT
THIS AGREEMENT, made and entered into this 154 day of Noven ber,
A.D. 1989, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal
Corporation, hereinafter referred to as "the City," and PETER A. AND
MARILYN A. LADANYI, Owners, hereinafter referred to as "the Developer,"
WITNESSETH:
WHEREAS, the Developer is the owner of certain property situate in the
County of Larimer, State of Colorado, and legally described as follows,
to -wit:
Silver Spruce Inn, situate on Lots 10 and 11, Block 18,
Crafts Resub of Lake Park Addition, City of Fort
Collins, County of Larimer, State of Colorado.
WHEREAS, the Developer desires to develop said property and has
submitted to the City a subdivision plat and/or a site plan, a copy of
which is on file in the Office of the City Engineer and made a part hereof
by reference; and
WHEREAS, the Developer has further submitted to the City a utility
plan for said lands, a copy of which is on file in the office of the
City Engineer and made a part hereof by reference; and
WHEREAS, the parties hereto have agreed that the development of said
lands will require increased municipal services from the City in order to
serve such area and will further require the installation of certain
EXHIBIT "B"
The Development Agreement for Silver Spruce Inn.
This exhibit does not apply to this development.
COST ESTIMATE FOR MAJOR DRAINAGE IMPROVEMENTS
Include only those major storm drainage basin improvements required by an adopted basin
master plan.
ITEM DESCRIPTION
1. Storm sewer, manholes, end sections, etc.
Sub -Total
2. Channel excavation, detention pond
excavation and riprap
TY UNIT COST TOTAL COST
L.f.
/L.f. $
L.f.
/L.f. $
Ea.
Ea. $
Ea.
Ea. $
C.Y.
$
/C.Y.
$
C.Y.
$
/C.Y.
$
C.Y.
$
/C.Y.
$
Sub -Total $.
EXHIBIT B - Page 2
ITEM DESCRIPTION
3. Right-of-way & easement acquisition
(a)
5
Sub -Total
Professional Design
Other
TY UNIT COST TOTAL COST
S.F. $ /S.F. $ _
Ac. $ /Ac. $
Q
Lump Sum $
Total estimated cost of Storm Drainage improvements eligible for
credit or City repayment
Prepared b Title:
Address: __
$
improvements primarily of benefit to the lands to be developed and not to
the City of Fort Collins as a whole; and
WHEREAS, the City has approved the subdivision plat and/or site plan
submitted by the Developer subject to certain requirements and conditions
which involve the installation of and construction of utilities and other
municipal improvements in connection with said lands.
NOW, THEREFORE, in consideration of the premises and the terms and
conditions acknowledged by the parties hereto, it is agreed as follows:
1. General Conditions.
A. All water lines, sanitary sewer collection lines, storm
sewer lines and facilities, streets, curbs, gutters, side-
walks, and bikepaths shall be installed as shown on the
approved utility plans and in full compliance with the Council
approved standard specifications of the City on file in the
Office of the City Engineer at the time of approval of the
utility plans relating to the specific utility, subject to any
time limitations as provided by Ordinance.
B. No building permit for the construction of any structure
within the development shall be issued by the City until the
water lines, fire hydrants, sanitary sewer and streets
(with at least the base course completed) serving such struc-
ture have been completed and accepted by the City. No build-
ing permits shall be issued for any structure located in
excess of six hundred sixty feet (660') from a single point of
access.
-2-
C. Any water lines, sanitary sewer lines, storm drainage lines,
and/or streets described on Exhibit "A", attached hereto,
shall be installed within the time and/or sequence required on
Exhibit "A". If the City Engineer determines that any water
lines, sanitary sewer lines, storm sewer facilities and/or
streets shown on the utility plans are required to provide
service or access to other areas of the City, those utilities
shall be installed within the time determined by the City
Engineer as referred to under "Special Conditions" in this
document.
D. Except as otherwise herein specifically agreed, the Developer
agrees to install and pay for all water, sanitary sewer and
storm sewer facilities and appurtenances, and all streets,
curbing, gutter, sidewalks, bikeways and other municipal
facilities necessary to serve the lands within the develop-
ment.
E. Street improvements (except curbing, gutter and walks)
shall not be installed until all utility lines to be placed
therein have been completely installed, including all indivi-
dual lot service lines leading in and from the main to the
property line.
F. The installation of all utilities shown on the utility draw-
ings shall be inspected by the Engineering Division of the
City and shall be subject to such department's approval.
-3-
The Developer agrees to correct any deficiencies in such
installations in order to meet the requirements of the
plans and/or specifications applicable to such installation.
In case of conflict, the utility drawings shall supercede the
standard specifications.
G. All storm sewer facilities shall be so designed and con-
structed as to protect the downstream properties and to
adequately serve the property to be developed (and other lands
as may be required, if any). The developer hereby agrees to
indemnify and hold the City harmless from any and all claims
that might arise, directly or indirectly, as a result of the
discharge of storm drainage or seepage waters from the devel-
opment in a manner or quantity different from that which was
historically discharged.
H. The Developer shall pay storm drainage basin fees in accor-
dance with Chapter 93 of the City Code. Storm drainage
improvements eligible for credit or City repayment under
provisions of Chapter 93 are described together with the
estimated cost of the improvements on the attached Exhibit
"B", which improvements shall include right of way, design and
construction costs. The basin fee payable by the Developer
shall be reduced by the estimated cost of said eligible
improvements. Upon completion of such eligible improvements,
the amount of such reduction shall be adjusted to reflect the
actual cost. If the cost of the eligible improvements con-
-4-
structed by the Developer and described in the above mentioned
exhibit exceeds the amount of the storm drainage fees payable
for the development, the City shall reimburse the excess cost
out. of the Storm Drainage fund upon completion of the improve -
meats and approval of the construction by the City.
I. The Developer shall provide the City Engineer with certified
Record Utility Drawing Transparencies on Black Image Diazo
Reverse Mylars upon completion of any phase of the construc-
tion.
2. Special Conditions.
A. Water lines (oversizing, payback, etc.).
N/A
B. Sanitary sewer (oversizing, payback, etc.).
N/A
C. Storm drainage lines and appurtenances (detention pond con-
struction, off -site mains, etc.).
N/A
D. Streets (oversizing, traffic lights, signs, etc.).
See Exhibit "A"
3. Miscellaneous.
A. The Developer agrees to provide and install, at his expense,
adequate barricades, warning signs and similar safety devices
at all construction sites within the public right-of-way
and/or other areas as deemed necessary by the City Engi-
neer in accordance with the City's "Work Area Traffic Control
-5-
Handbook" and shall not remove said safety devices until the
construction has been approved by the director.
B. The Developer shall, at all times, keep the public right-of-
way free from accumulation of waste material or rubbish caused
by his operation, shall remove such rubbish no less than
weekly and, at the completion of the work, shall remove all
such waste materials, rubbish, tools, construction equipment,
machinery, and surplus materials from the public right-of-way.
He further agrees to maintain the finished street surfaces
free from dirt caused by his operation. Any excessive ac-
cumulation or dirt and/or construction materials shall be
considered sufficient cause for the City to withhold building
permits and/or certificates of occupancy until corrected to
the satisfaction of the City Engineer. If the Developer fails
to adequately clean such streets within two (2) days after
receipt of written notice, the City may have the streets
cleaned at his expense and he shall be responsible for prompt
payment of all such costs.
C. The Developer hereby insures that his subcontractors shall
cooperate with the City's construction inspectors by ceasing
operations when winds are of sufficient velocity to create
blowing dust which, in the inspector's opinion, is hazardous
to the public health and welfare.
D. When the inspector determines that erosion (either by wind or
water) is likely to be a problem, the surface area of erodable
earth material exposed at any one time shall not exceed
200,000 square feet for earthworks operations. Temporary or
permanent erosion control shall be incorporated into the
subdivision at the earliest practicable time. By way of
explanation and without limitation, said control may consist
of seeding of approved grasses, temporary dikes, gabions,
and/or other devices.
E. The Developer shall, pursuant to the terms of this agreement,
complete all improvements and perform all other obligations
required herein, as such improvements or obligations may be
shown on the original plat, or on any replat subsequently
filled by the Developer, and the City may withhold such buil-
ding permits and certificates of occupancy as it deems neces-
sary to ensure performance hereof.
F. This Agreement shall be binding upon the parties hereto, their
successors, grantees, heirs, personal representatives, and
assigns and shall be deemed to run with the real property
above described.
G. Nothing herein contained shall be construed as a waiver of any
requirements of the City Code, and the Developer agrees to
comply with all requirements of the same.
THE CITY OF FORT COLLINS, COLORADO
A Municipal Corporation
f .. Ci ty, Manager
i
-7-
ATTEST:
City Clerk k—
v
APPROVED:
oft
IeL
of Pub�i Worl
Cii tt/y��J. Attorney r/ %
Peter A. Ladanyi
Marilyn Ladanyi�
No
EXHIBIT "A"
1. Schedule of water lines to be installed out of sequence.
N/A
2. Schedule of sanitary sewer lines to be installed out of sequence.
N/A
3. Schedule of street improvements to be installed out of sequence.
The alley between College and Remington, from Pitkin north to the
property line, shall be paved by this developer to City standards.
4. Storm drainage improvements to be installed out of sequence.
N/A
3