Loading...
HomeMy WebLinkAboutMASON STREET PUD - Filed DA-DEVELOPMENT AGREEMENT - 1993-10-21DEVELOPMENT AGREEMENT THIS AGREEMENT, made and entered into this �)I day of . , 1: __<•_'1= 199_1 by and between the CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and FIELDSTONE LTD., a Colorado limited partnership, hereinafter referred to as the "Developer". WITNESSETH: WHEREAS, the Developer is the Owner of certain property situated in the County of Larimer, State of Colorado, (hereafter referred to as the "Property") and legally described as follows, to wit: LOT 2, MASON STREET P.U.D., situate in the Northeast 1/4 of Section 35, Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. WHEREAS, the Developer desires to develop the Property and has submitted to the City a subdivision plat and/or a site plan and landscape plan, a copy of which is on file in the office of the Director of Engineering and made a part hereof by reference; and WHEREAS, the Developer has further submitted to the City utility plans for the Property, a copy of which is on file in the office of the Director of Engineering and made a part hereof by reference; and WHEREAS, the parties hereto have agreed that the development of the Property will require increased municipal services from the City in order to serve such area and will further require the installation of certain improvements primarily of benefit to the lands to be developed and not to the City of Fort Collins as a whole; and WHEREAS, the City has approved the subdivision plat and/or site plan and landscape plan submitted by the Developer subject to certain requirements and conditions which involve the installation of and construction of utilities and other municipal improvements in connection with the Property. NOW, THEREFORE, in consideration of the promises of the parties hereto and other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, it is agreed as follows: I. General Conditions The terms of this Agreement shall govern all development activities of the Developer pertaining to the Property. For the purposes of this Agreement, "development activities" shall include, EXHIBIT "B" NOT APPLICABLE 10 DEVELOPMENT AGREEMENT THIS AGREEMENT, made and entered into this 1q 6 day of Wl A.D. 1983, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as "the City," and RONALD N. GISELMAN, owner, hereinafter referred to as "the Developer," WTTAIFCCFTW WHEREAS, the Developer is the owner of certain property situate in the County of Larimer, State of Colorado, and legally described as follows, to-wi t: Mason Street P.U.D. situate in the Northeast Quarter of Section 35, Township 7 North, Range 69 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. WHEREAS, the Developer desires to develop said property and has submitted to the City a subdivision plat and/or a site plan, a copy of which is on file in the Office of the City Engineer and made a part hereof by reference; and WHEREAS, the Developer has further submitted to the City a utility plan for said lands, a copy of which is on file in the office of the City Engineer and made a part hereof by reference; and WHEREAS, the parties hereto have agreed that the development of said lands will require increased municipal services from the City in order to serve such area and will further require the installation of certain improvements primarily of benefit to the lands to be developed and not to the City of Fort Collins as a whole; and WHEREAS, the City has approved the subdivision plat and/or site plan submitted by the Developer subject to certain requirements and conditions which involve the installation of and construction of utilities and other municipal improvements in connection with said lands. NOW, THEREFORE, in consideration of the premises and the terms and conditions acknowledged by the parties hereto, it is agreed as follows: 1. General Conditions. A. All water lines, sanitary sewer collection lines, storm sewer lines and facilities, streets, curbs, gutters, side- walks, and bikepaths shall be installed as shown on the approved utility plans and in full compliance with the Council approved standard specifications of the City on file in the Office of the City Engineer at the time of approval of the utility plans relating to the specific utility, subject to any time limitations as provided by Ordinance. B. No building permit for the construction of any structure within the development shall be issued by the City until the water lines, fire hydrants, sanitary sewer and streets (with at least the base course completed) serving such struc- ture have been completed and accepted by the City. No build- ing permits shall be issued for any structure located in excess of six hundred sixty feet (660') from a single point of access. -2- C. Any water lines, sanitary sewer lines, storm drainage lines, and/or streets described on Exhibit "A", attached hereto, shall be installed within the time and/or sequence required on Exhibit "A". If the City Engineer determines that any water lines, sanitary sewer lines, storm sewer facilities and/or streets shown on the utility plans are required to provide service or access to other areas of the City, those utilities shall be installed within the time determined by the City Engineer as referred to under "Special Conditions" in this document. D. Except as otherwise herein specifically agreed, the Developer agrees to install and pay for all water, sanitary sewer and storm sewer facilities and appurtenances, and all streets, curbing, gutter, sidewalks, bikeways and other municipal facilities necessary to serve the lands within the develop- ment. E. Street improvements (except curbing, gutter and walks) shall not be installed until all utility lines to be placed therein have been completely installed, including all indivi- dual lot service lines leading in and from the main to the property line. F. The installation of all utilities shown on the utility draw- ings shall be inspected by the Engineering Division of the City and shall be subject to such department's approval. -3- The Developer agrees to correct any deficiencies in such installations in order to meet the requirements of the plans and/or specifications applicable to such installation. In case of conflict, the utility drawings shall supercede the standard specifications. G. All storm sewer facilities shall be so designed and con - strutted as to protect the downstream properties and to adequately serve'the property to be developed (and other lands as may be required, if any). The developer hereby agrees to indemnify and hold the City harmless from any and all claims that might arise, directly or indirectly, as a result of the discharge of storm drainage or seepage waters from the devel- opment in a manner or quantity different from that which was historically discharged. H. The Developer shall pay storm drainage basin fees in accor- dance with Chapter 93 of the City Code. Storm drainage improvements eligible for credit or City repayment under provisions of Chapter 93 are described together with the estimated cost of the improvements on the attached Exhibit "E,", which improvements shall include right of way, design and construction costs. The basin fee payable by the Developer shall be reduced by the estimated cost of said eligible improvements. Upon completion of such eligible improvements, the amount of such reduction shall be adjusted to reflect the actual cost. If the cost of the eligible improvements con- -4- strutted by the Developer and described in the above mentioned exhibit exceeds the amount of the storm drainage fees payable for the development, the City shall reimburse the excess cost out of the Storm Drainage fund upon completion of the improve- ments and approval of the construction by the City. I. The Developer shall provide the City Engineer with certified Record Utility Drawing Transparencies on Black Image Diazo Reverse Mylars upon completion of any phase of the construc- tion. 2. Special Conditions. A. Storm drainage lines and appurtenances All storm drainage facilities shall be constructed by the Developer and approved by the City Engineer prior to the release of the Certificate of Occupancy for Phase I. B. Streets 1) The City shall repay the Developer for oversizing College Avenue to arterial standards in lieu of local street standards in accordance with the Code of the City of Fort Collins Article 99-6(F). 2) The Developer is responsible for the construction to City standards of that portion of Colboard Drive adjacent to this P.U.D. according to the following terms: a) If Colboard Drive is constructed by another developer prior to the construction of Phase II of Mason Street P.U.D., this Developer shall repay the City for the costs incurred by said other developer for construction of one half of Colboard Drive where it abutts this property, at time of Building Permit. This is subject to the provisions of the Code of the City of Fort Collins Article 99-6.B.(6). b) If Phase II of Mason Street P.U.D. is constructed prior to development occurring on Lots 3 and 4 of RCD Plaza South Subdivision, the Developer shall pay the City 150% of the costs of construction of one half of Colboard Drive where it abutts this property, the -5- amount to be determined by the City Engineer at time of building permit. The City shall establish an escrow account with said monies to be used to reimburse the Developer that eventually constructs Colboard Drive. 3) If Phase II of Mason Street P.U.D. is constructed prior to redevelopment occurring at College Motors P.U.D. the Developer shall pay the City 150% of the costs of the improvements to change the temporary access way from College Motors P.U.D. to the final design. The amount of said costs to be determined by the City Engineer and due at time of building permit for Phase II. 4) Improvements to College Avenue shall be completed prior to the release of the Certificate of Occupancy for Phase I of Mason Street P.U.D. 3. Miscellaneous. A. The Developer agrees to provide and install, at his expense, adequate barricades, warning signs and similar safety devices at all construction sites within the public right-of-way and/or other areas as deemed necessary by the City Engi- neer in accordance with the City's "Work Area Traffic Control Handbook" and shall not remove said safety devices until the construction has been approved by the director. B. The Developer shall, at all times, keep the public right-of- way free from accumulation of waste material or rubbish caused by his operation, shall remove such rubbish no less than weekly and, at the completion of the work, shall remove all such waste materials, rubbish, tools, construction equipment, machinery, and surplus materials from the public right-of-way. He further agrees to maintain the finished street surfaces free from dirt caused by his operation. Any excessive ac- cumulation or dirt and/or construction materials shall be considered sufficient cause for the City to withhold building permits and/or certificates of occupancy until corrected to the satisfaction of the City Engineer. If the Developer fails to adequately clean such streets within two (2) days after receipt of written notice, the City may have the streets cleaned at his expense and he shall be responsible for prompt payment of all such costs. C. The Developer hereby insures that his subcontractors shall cooperate with the City's construction inspectors by ceasing operations when winds are of sufficient velocity to create blowing dust which, in the inspector's opinion, is hazardous to the public health and welfare. D. When the inspector determines that erosion (either by wind or water) is likely to be a problem, the surface area of erodable earth material exposed at any one time shall not exceed 200,000 square feet for earthworks operations. Temporary or permanent erosion control shall be incorporated into the subdivision at the earliest practicable time. By way of explanation and without limitation, said control may consist of seeding of approved grasses, temporary dikes, gabions, and/or other devices. E. The Developer shall, pursuant to the terms of this agreement, complete all improvements and perform all other obligations required herein, as such improvements or obligations may be shown on the original plat, or on any replat subsequently filed by the Developer, and the City may withhold such buil- -7- ding permits and certificates of occupancy as it deems neces- sary to ensure performance hereof. F. This Agreement shall be binding upon the parties hereto, their successors, grantees, heirs, personal representatives, and assigns and shall be deemed to run with the real property above described. G. Nothing herein contained shall be construed as a waiver of any requirements of the City Code, and the Developer agrees to comply with all requirements of the same. ATTEST: C a APPROVED: erect of Public W City Attorney By THE CITY OF FORT COLLINS, COLORADO A Municipal Corporation City/Manager OWNER EXHIBIT "A" 1. Schedule of water lines to be installed out of sequence. Not Applicable. 2. Schedule of sanitary sewer lines to be installed out of sequence. Not Applicable. 3. Schedule of street improvements to be installed out of sequence. See Paragraph 2B (2) 4. Storm drainage improvements to be installed out of sequence. See Paragraph 2A. but not be limited to, the following: (1) The actual construction of improvements, (2) Obtaining a building permit therefor, or (3) Any change in grade, contour or appearance of said property caused by, or on behalf of, the Developer with the intent to construct improvements thereon. B. All water lines, sanitary sewer collection lines, storm sewer lines and facilities, streets, curbs, gutters, sidewalks, and bikepaths shall be installed as shown on the approved utility plans and in full compliance with the Council -approved standards and specifications of the City on file in the office of the Director of Engineering at the time of approval of the utility plans relating to the specific utility, subject to a three (3) year time limitation from the date of execution of this Agreement. In the event that the Developer commences or performs any construction pursuant hereto after three (3) years from the date of execution of this agreement, the Developer shall resubmit the project utility plans to the Director of Engineering for reexamination. The City may require the Developer to comply with approved standards and specifications of the City on file in the office of the Director of Engineering at the time of resubmittal. C. No building permit for the construction of any structure within the development shall be issued by the City until the water lines, fire hydrants, sanitary sewer lines and streets (with at least the base course completed) serving such structure have been completed and accepted by the City. No building permits shall be issued for any structure located in excess of six hundred sixty feet (6601) from a single point of access. D. Any water lines, sanitary sewer lines, storm drainage lines, and/or streets described on Exhibit "A," attached hereto, shall be installed within the time and/or sequence required on Exhibit "A." If the Director of Engineering has determined that any water lines, sanitary sewer lines, storm drainage facilities and/or streets are required to provide service or access to other areas of the City, those facilities shall be shown on the utility plans and shall be installed by the Developer within the time as established under "Special Conditions" in this document. E. Except as otherwise herein specifically agreed, the Developer agrees to install and pay for all water, sanitary sewer, and storm drainage facilities and appurtenances, and all streets, curbs, gutters, sidewalks, bikeways and other public improvements required by this development as shown on the plat, site, landscape and utility plans, and other approved documents pertaining to this development on file with the City. F. Street improvements (except curbs, gutters and walks) shall not be installed until all utility lines to be placed therein have been completely installed, including all individual lot service lines leading in and from the main to the property line. E rviirny� 'inn The Development Agreement for MASON STREET P.U.D. This Exhibit does not apply to this Development. COST ESTIMATE FOR MAJOR DRAINAGE IMPROVEMENTS Include only those major storm drainage basin improvements required by an adopted basin master plan. ITEM DESCRIPTION QUANTITY UNIT COST TOTAL COST 1. Storm sewer, manholes, end sections, etc. 2. Sub -Total Channel excavation, detention pond excavation and riprap Sub -Total $ Ea. _ _ Ea. $ Ea. Ea. $ _C.Y. $___/C.Y. $ C.Y. $ /C.Y. $ EXHIBIT B - Page 2 ITEM 3. (a) (b) 4. (a) DESCRIPTION Right-of-way & easement acquisition Sub -Total Professional Design Other UANTITY UNIT COST TOTAL COST S.F. $ /S.F. $ Ac. $ /Ac. $ Lump Sum $ Total estimated cost of Storm Drainage improvements eligible for credit or City repayment $ Prepared by: _ _ _ _ _ Title: Address: DEVELOPMENT AGREEMENT THIS AGREEMENT, made and entered into this WA day of May A.D. 1983, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as "the City," and RONALD N. GISELMAN, owner, hereinafter referred to as "the Developer," WTTWFCCFTW- WHEREAS, the Developer is the owner of certain property situate in the County of Larimer, State of Colorado, and legally described as follows, to-wi t: Mason Street P.U.D. situate in the Northeast Quarter of Section 35, Township 7 North, Range 69 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. WHEREAS, the Developer desires to develop said property and has submitted to the City a subdivision plat and/or a site plan, a copy of which is on file in the Office of the City Engineer and made a part hereof by reference; and WHEREAS, the Developer has further submitted to the City a utility plan for said lands, a copy of which is on file in the office of the City Engineer and made a part hereof by reference; and WHEREAS, the parties hereto have agreed that the development of said lands will require increased municipal services from the City in order to serve such area and will further require the installation of certain improvements primarily of benefit to the lands to be developed and not to the City of Fort Collins as a whole; and WHEREAS, the City has approved the subdivision plat and/or site plan submitted by the Developer subject to certain requirements and conditions which involve the installation of and construction of utilities and other municipal improvements in connection with said lands. NOW, THEREFORE, in consideration of the premises and the terms and conditions acknowledged by the parties hereto, it is agreed as follows: 1. General Conditions. A. All water lines, sanitary sewer collection lines, storm sewer lines and facilities, streets, curbs, gutters, side- walks, and bikepaths shall be installed as shown on the approved utility plans and in full compliance with the Council approved standard specifications of the City on file in the Office of the City Engineer at the time of approval of the utility plans relating to the specific utility, subject to any time limitations as provided by Ordinance. B. No building permit for the construction of any structure within the development shall be issued by the City until the water lines, fire hydrants, sanitary sewer and streets (with at least the base course completed) serving such struc- ture have been completed and accepted by the City. No build- ing permits shall be issued for any structure located in excess of six hundred sixty feet (660') from a single point of access. -2- C. Any water lines, sanitary sewer lines, storm drainage lines, and/or streets described on Exhibit "A", attached hereto, shall be installed within the time and/or sequence required on Exhibit "A". If the City Engineer determines that any water lines, sanitary sewer lines, storm sewer facilities and/or streets shown on the utility plans are required to provide service or access to other areas of the City, those utilities shall be installed within the time determined by the City Engineer as referred to under "Special Conditions" in this document. D. Except as otherwise herein specifically agreed, the Developer agrees to install and pay for all water, sanitary sewer and storm sewer facilities and appurtenances, and all streets, curbing, gutter, sidewalks, bikeways and other municipal facilities necessary to serve the lands within the develop- ment. E. Street improvements (except curbing, gutter and walks) shall not be installed until all utility lines to be placed therein have been completely installed, including all indivi- dual lot service lines leading in and from the main to the property line. F. The installation of all utilities shown on the utility draw- ings shall be inspected by the Engineering Division of the City and shall be subject to such department's approval. -3- The Developer agrees to correct any deficiencies in such installations in order to meet the requirements of the plans and/or specifications applicable to such installation. In case of conflict, the utility drawings shall supercede the standard specifications. G. All storm sewer facilities shall be so designed and con- structed as to protect the downstream properties and to adequately serve'the property to be developed (and other lands as may be required, if any). The developer hereby agrees to indemnify and hold the City harmless from any and all claims that might arise, directly or indirectly, as a result of the discharge of storm drainage or seepage waters from the devel- opment in a manner or quantity different from that which was historically discharged. H. the Developer shall pay storm drainage basin fees in accor- dance with Chapter 93 of the City Code. Storm drainage improvements eligible for credit or City repayment under provisions of Chapter 93 are described together with the estimated cost of the improvements on the attached Exhibit "B", which improvements shall include right of way, design and construction costs. The basin fee payable by the Developer shall be reduced by the estimated cost of said eligible improvements. Upon completion of such eligible improvements, the amount of such reduction shall be adjusted to reflect the actual cost. If the cost of the eligible improvements con- -A- strutted by the Developer and described in the above mentioned exhibit exceeds the amount of the storm drainage fees payable for the development, the City shall reimburse the excess cost out of the Storm Drainage fund upon completion of the improve- ments and approval of the construction by the City. I. The Developer shall provide the City Engineer with certified Record Utility Drawing Transparencies on Black Image Diazo Reverse Mylars upon completion of any phase of the construc- tion. 2. Special Conditions. A. Storm drainage lines and appurtenances All storm drainage facilities shall be constructed by the Developer and approved by the City Engineer prior to the release of the Certificate of Occupancy for Phase I. B. Streets 1) The City shall repay the Developer for oversizing College Avenue to arterial standards in lieu of local street standards in accordance with the Code of the City of Fort Collins Article 99-6(F). 2) The Developer is responsible for the construction to City standards of that portion of Colboard Drive adjacent to this P.U.D. according to the following terms: a) If Colboard Drive is constructed by another developer prior to the construction of Phase II of Mason Street P.U.D., this Developer shall repay the City for the costs incurred by said other developer for construction of one half of Colboard Drive where it abutts this property, at time of Building Permit. This is subject to the provisions of the Code of the City of Fort Collins Article 99-6.B.(6). b) If Phase II of Mason Street P.U.D. is constructed prior to development occurring on Lots 3 and 4 of RCD Plaza South Subdivision, the Developer shall pay the City 150% of the costs of construction of one half of Colboard Drive where it abutts this property, the -5- amount to be determined by the City Engineer at time of building permit. The City shall establish an escrow account with said monies to be used to reimburse the Developer that eventually constructs Colboard Drive. 3) If Phase II of Mason Street P.U.D. is constructed prior to redevelopment occurring at College Motors P.U.D. the Developer shall pay the City 1501 of the costs of the improvements to change the temporary access way from College Motors P.U.D. to the final design. The amount of said costs to be determined by the City Engineer and due at time of building permit for Phase II. 4) Improvements to College Avenue shall be completed prior to the release of the Certificate of Occupancy for Phase I of Mason Street P.U.D. 3. Miscellaneous. A. The Developer agrees to provide and install, at his expense, adequate barricades, warning signs and similar safety devices at all construction sites within the public right-of-way and/or other areas as deemed necessary by the City Engi- neer in accordance w-,th the City's "Work Area Traffic Control Handbook" and shall not remove said safety devices until the construction has been approved by the director. B. The Developer shall, at all times, keep the public right-of- way free from accumulation of waste material or rubbish caused by his operation, shall remove such rubbish no less than weekly and, at the completion of the work, shall remove all such waste materials, rubbish, tools, construction equipment, machinery, and surplus materials from the public right-of-way. lie further agrees to maintain the finished street surfaces free from dirt caused by his operation. Any excessive ac- cumulation or dirt and/or construction materials shall be considered sufficient cause for the City to withhold building ,permits and/or certificates of occupancy until corrected to the satisfaction of the City Engineer. If the Developer fails to adequately clean such streets within two (2) days after receipt of written notice, the City may have the streets cleaned at his expense and he shall be responsible for prompt payment of all such costs. C. The Developer hereby insures that his subcontractors shall cooperate with the City's construction inspectors by ceasing operations when winds are of sufficient velocity to create blowing dust which, in the inspector's opinion, is hazardous to the public health and welfare. D. When the inspector determines that erosion (either by wind or water) is likely to be a problem, the surface area of erodable earth material exposed at any one time shall not exceed 200,000 square feet for earthworks operations. Temporary or permanent erosion control shall be incorporated into the subdivision at the earliest practicable time. By way of explanation and without limitation, said control may consist of seeding of approved grasses, temporary dikes, gabions, and/or other devices. E. The Developer shall, pursuant to the terms of this agreement, complete all improvements and perform all other obligations required herein, as such improvements or obligations may be shown on the original plat, or on any replat subsequently filed by the Developer, and the City may withhold such buil- -7- ding permits and certificates of occupancy as it deems neces- sary to ensure performance hereof. F. This Agreement shall be binding upon the parties hereto, their successors, grantees, heirs, personal representatives, and assigns and shall be deemed to run with the real property above described. G. Nothing herein contained shall be construed as a waiver of any requirements of the City Code, and the Developer agrees to comply with all requirements of the same. ATTEST: City Clerk APPROVED: irectW�, of Public Walks City Attorney By THE CITY OF FORT COLLINS, COLORADO A Municipal Corporation City Manager it OWNER G. The installation of all utilities shown on the utility plans shall be inspected by the Engineering Department of the City and shall be subject to such department's approval. The Developer agrees to correct any deficiencies in such installations in order to meet the requirements of the plans and/or specifications applicable to such installation. In case of conflict, the utility plans shall supersede the standard specifications. H. All storm drainage facilities shall be so designed and constructed by the Developer as to protect downstream and adjacent properties against injury and to adequately serve the Property (and other lands as may be required, if any). The Developer has met or exceeded the minimum requirements for storm drainage facilities as have been established by the City in its Drainage Master Plans and Design Criteria. The Developer does hereby indemnify and hold harmless the City from any and all claims that might arise, directly or indirectly, as a result of the discharge of injurious storm drainage or seepage waters from the development in a manner or quantity different from that which was historically discharged and caused by the design or construction of the storm drainage facilities, except for (1) such claims and damages as are caused by the acts or omissions of the City in maintenance of such facilities as have been accepted by the City for maintenance; (2) errors, if any, in the general concept of the City's master plans (but not to include any details of such plans, which details shall be the responsibility of the Developer); and (3) specific directives that may be given to the Developer by the City. Approval of and acceptance by the City of any storm drainage facility design or construction shall in no manner be deemed to constitute a waiver or relinquishment by the City of the aforesaid indemnification. The Developer shall engage a licensed professional engineer to design the storm drainage facilities as aforesaid and it is expressly affirmed hereby that such engagement shall be intended for the benefit of the City, and subsequent purchasers of property in the development. I. The Developer shall pay storm drainage basin fees in accordance with Chapter 26, Article VII of the City Code. Storm drainage improvements eligible for credit or City repayment under the provisions of Chapter 26 are described together with estimated cost of the improvements on the attached Exhibit "B," which improvements, if applicable, shall include right-of-way, design and construction costs. See Section II.C, Special Conditions, Storm Drainage Lines and Appurtenances, for specific instructions. J. The Developer shall provide the Director of Engineering with certified Record Plan Transparencies on Black Image Diazo Reverse Mylars upon completion of any phase of the construction. 7 FXNTRTT "A" 1. Schedule of water lines to be installed out of sequence. Not Applicable. 2. Schedule of sanitary sewer lines to be installed out of sequence. Not Applicable. 3. Schedule of street improvements to be installed out of sequence. See Paragraph 2B (2) 4. Storm drainage improvements to be installed out of sequence. See Paragraph 2A. MASON STREET P.U.D. AMENDMENT AGREEMENT NO. 1 THIS AGREEMENT, made and entered into this 627 day of JJJNt ,19� by and between the CITY OF FORT COLLINS, COLORADO, a municipal corporation ("City"), and RONALD N. GISELMAN, OWNER ("Developer"), is an amendment to that certain Development Agreement dated the 19th day of May, 1983, by and between the parties hereto. By this Agreement, the aforesaid Development Agreement is hereby amended in the following particulars: Paragraph 2.B.4) is amended to add the following: The Developer shall complete the improvements to College Avenue prior to one year from the date of issuance of the temporary Certificate of Occupancy. Paragraph 2.C. is added as follows: 2.C. Other. The Developer agrees to complete the improvements to the parking lot for Phase One, remove the structures as indicated on the site plan for Phase One, and install the remaining landscaping within one year from the date of this Agreement. IN WITNESS WHEREOF, the parties hereto have set their hands the day and year first above written. CITY OF FORT COLLINS a municipal corporation City Manager ATTEST: City C er APPROVED: erect o u is Wor<s �,�,� t y Attorney Owner �,� ,, SUBDIVISION AGREEMENT THIS AGREEMENT, made and entered into this C� 1 5tday of Ajvr* f , A.D. 1981, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as "the City," and RICHARD D. FUQUA and PATRICIA FUQUA, hereinafter referred to as "the Developer," WITNESSETH: WHEREAS, the Developer is the owner of certain property situate in the County of Larimer, State of Colorado, and legally described as follows, to -wit: Dick's Datsun, P.U.D., located in the Northeast 1/4 of ection 5, owns ip 7 North, Range 69 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. WHEREAS, the Developer desires to develop said property as a com- mercial subdivision and has submitted to the City a subdivision plat (and a site plan if said property is to be developed as a Planned Unit Develop- ment), a copy of which is on file in the Office of the Director of Engi- neering Services and made a part hereof by reference; and WHEREAS, the Developer has further submitted to the City a utility plan for said lands, a copy of which is on file in the office of the Director of Engineering Services and made a part hereof by reference; and WHEREAS, the parties hereto have agreed that the development of said lands will require increased municipal services from the City in order to serve such area and will further require the installation of certain improvements primarily of benefit to the lands to be developed and not to the City of Fort Collins as a whole; and WHEREAS, the City has approved the subdivision plat (and site plan where applicable) submitted by the Developer subject to certain require- ments and conditions which involve the installation of and construction of utilities and other municipal improvements in connection with said lands. NOW, THEREFORE, in consideration of the premises and the terms and conditions acknowledged by the parties hereto, it is agreed as follows: 1. General Conditions. A. All water lines, sanitary sewer collection lines, storm sewer lines and facilities, streets, curbs, gutters, sidewalks, and bikepaths shall be installed as shown on the approved utility plans and in full compliance with the standard specifications of the City on file in the Office of the Director of Engineer- ing Services relating to the specific utility. B. No building permit for the construction of any structure within the subdivision shall be issued by the City until the water lines, fire hydrants, sanitary sewer and streets (with at least the base course completed) serving such struc- ture have been completed and accepted by the City. No build- ing permits shall be issued for any structure located in excess of six hundred sixty feet (660') from a single point of access. C. Any water lines, sanitary sewer lines, storm drainage lines, and/or streets described on Exhibit "A", attached hereto, -2- shall be installed within the time and/or sequence required on Exhibit "A". If the Director of Engineering Services deter- mines that any water lines, sanitary sewer lines, storm sewer facilities and/or streets shown on the utility plans are required to provide service or access to other areas of the City, those utilities shall be installed within the time determined by the Director as referred to under "Special Conditions" in this document. D. All electric lines and facilities shall be installed in accordance with the Electric Service Rules and Regulations, the Electric Construction Policies, Practices and Procedures, and specifications of the City of Fort Collins' electric utility. E. Except as otherwise herein specifically agreed, the Developer agrees to install and pay for all water, sanitary sewer and storm sewer facilities and appurtenances, and all streets, curbing, gutter, sidewalks, bikeways and other municipal facilities necessary to serve the lands within the subdivi- sion. F. Street improvements (except curbing, gutter and walks) shall not be installed until all utility lines to be placed therein have been completely installed, including all indivi- dual lot service lines leading in and from the main to the property line. G. The installation of all utilities shown on the utility draw- -3- ings shall be inspected by the Engineering Division of the City and shall be subject to such department's approval. The Developer agrees to correct any deficiencies in such installations in order to meet the requirements of the plans and/or specifications applicable to such installation. In case of conflict; the utility drawings shall supercede the standard specifications. H. The Developer shall provide the Director of Engineering Services with certified Record Utility Drawing Transparencies on Black Image Diazo Reverse Mylars upon completion of any phase of the construction. 2. Special Conditions. A. Water lines (oversizing, payback, etc.). See Exhibit "A". B. Sanitary sewer (oversizing, payback, etc.). Not applicable. C. Storm drainage lines and appurtenances (detention pond con- struction, off -site mains, etc.). D. Streets (oversizing, traffic lights, signs, etc.). Not applicable. E. Other requirements. See Exhibit "B". 3. Miscellaneous. A. The Developer agrees to provide and install, at his expense, adequate barricades, warning signs and similar safety devices at all construction sites within the public right-of-way and/or other areas as deemed necessary by the Director of Engineering Services in accordance with the City's "Work Area -4- Traffic Control Handbook" and shall not remove said safety devices until the construction has been approved by the director. B. The Developer shall, at all times, keep the public right-of- way free from accumulation of waste material or rubbish caused by his operation. He shall remove such rubbish no less than weekly and, at the completion of his work, shall remove all waste materials, rubbish, tools, construction equipment, machinery, and surplus materials from the public right-of-way caused by his operation. The Developer agrees to maintain the finished street surfaces free from dirt caused by his opera- tion. Any excessive accumulation or dirt and/or construction materials shall be considered sufficient cause for the City to withhold building permits and/or certificates of occupancy until corrected to the satisfaction of the Director of Engi- neering Services. In the event that the Developer fails to adequately clean the streets within two (2) days after written notice, the City may have the street cleaned and charge the Developer for said costs of cleaning. C. The Developer hereby insures that his subcontractors shall cooperate with the City's construction inspectors by ceasing operations when winds are of sufficient velocity to create blowing dust which, in the inspector's opinion, is hazardous to the public health and welfare. -5- D. When the inspector determines that erosion (either by wind or water) is likely to be a problem, the surface area of erodable earth material exposed at any one time shall not exceed 200,000 square feet for earthworks operations. Temporary or permanent erosion control shall be incorporated into the subdivision at the earliest practicable time. By way of explanation and without limitation, said control may consist of seeding of approved grasses, temporary dikes, gabions, and/or other devices. E. This Agreement shall be binding upon the parties hereto, their successors, heirs, personal representatives, and assigns. F. Nothing herein contained shall be construed as a waiver of any requirements of the City Subdivision Ordinance or any other provision of the City Code, and the Developer agrees to comply with all requirements of the same. THE CITY OF FORT COLLINS, COLORADO ATTEST: ZA paCorporation BY era er -6- DICK'S n TSUN .P.U.D. By c ar uqua, Own By��« C c c 1 c —;a;ricI- uqua, wnr�"` -7- II. Special Conditions A. Water Lines Not Applicable B. Sewer Lines Not Applicable C. Storm Drainage Lines and Appurtenances 1. The Developer and the City agree that all on -site and off -site storm drainage improvements shall be completed by the Developer in accordance with the approved plans prior to the issuance of any certificate of occupancy. Completion of improvements shall include the certification by a licensed professional engineer that the drainage facilities which serve this development have been constructed in conformance with said approved plans. 2. The Developer agrees to provide and maintain erosion control improvements as shown on the approved utility plans to stabilize all over -lot grading in and adjacent to this development. The Developer shall also be required to post a security deposit in the amount of $1,950.00 prior to beginning construction to guarantee the proper installation and maintenance of the erosion control measures shown on the approved Plan. Said security deposit shall be made in accordance with the criteria set forth in the Storm Drainage Design Criteria and Construction Standards. D. Streets. 1. The Developer and the City agree that no street oversizing reimbursement is due the Developer for this development. E. Hazards and Emergency Access. 1. No combustible material will be allowed on the site until a permanent water system is installed by the Developer and approved by the City. 2. The Developer shall provide an accessway to any building under construction which is, adequate to handle any emergency vehicles or equipment, and shall properly maintain such accessway at all times. Such accessway shall be at a minimum, 20' wide with 4" aggregate base course material compacted according to City Standards and with an 80' diameter turnaround at the building end of said accessway. 3. The issuance of any building permit by the City is made solely at the Developer's own risk and the Developer shall EXHIBIT "A" 1. Schedule of water lines to be installed out of sequence. Prior to the issuance of any building permit for the proposed building addition on this property, the Developer shall extend the water main from Boardwalk Drive to this property and install the fire hydrant shown on sheet 5 of 6, R.C.D. Plaza Utility Drawings. The City shall in turn endeavor to collect from the R.C.D. Plaza Developer (at time of issuance of additional building permits) and, when collected, repay the Developer for installing said water main and fire hydrant. 2. Schedule of sanitary sewer lines to be installed out of sequence. Not applicable. 3. Schedule of street improvements to be installed out of sequence. Not applicable. 4. Storm drainage improvements to be installed out of sequence. Not applicable. Robert Sutter architects planners City of Fort Collins Department of Planning P.O. Box 580 Fort Collins, Colorado Subject: Dear Sirs: drake office center ..... ...... 333 w drake road ft. Collins, Colorado 80526.., . A 303) 223 - 5198 and Development 80522 nt January 13, 1981 P1 I have received and reviewed the drawings concerning Dick's Datsun P.U.D. and the resultant cross easement requirements for the adjacent properties to the north of which I am a participating property owner. It is my intent to cooper- ate with the City of Fort Collins in the implementation of this solution as proposed by Dick's Datsun P.U.D. and shown on the enclosed sketch of this affected area. It is also my understanding that this solution is in lieu of the frontage road previously imposed on these properties. Subsequently, the 50' (fifty foot) right-of-way as dedicated to the City of Fort Collins by Creger Plaza and College Motors P.U.D. for the frontage road will be nullified in favor of a public cross easement through these properties in the parking areas, retaining only a single curb cut on South College Avenue for the College Motors P.U.D. property (see enclosed sketch) presently Foothills Chrysler �1 Plymouth, which will, via the cross easement, allow two points of access toM4a-t P- -.t{- Creger Plaza lot 5, including the access fnp Creger ive. •- Signed Reid Rosenthal RBB:sfj Signed Robert E. Creger College Motors P.U.D. EXHIBIT B l n n` O I J CD CD co OR r4 C wo CD d � CD y , Q Gfs�� �LdZc1 � hold the City harmless from any and all damages or injuries arising directly or indirectly out of the issuance of said permit prior to the completion of the requirements in accordance with Section 29- 678 of the Code of the City. III. Miscellaneous A. The Developer agrees to provide and install, at its expense, adequate barricades, warning signs and similar safety devices at all construction sites within the public right-of-way and/or other areas as deemed necessary by the Director of Engineering in accordance with the City's "Work Area Traffic Control Handbook" and shall not remove said safety devices until the construction has been completed and approved by the Director of Engineering. B. The Developer shall, at all times, keep the public right- of-way free from accumulation of waste material or rubbish caused by the Developer's operation; shall remove such rubbish no less than weekly and; at the completion of the work, shall remove all such waste materials, rubbish, tools, construction equipment, machinery, and surplus materials from the public right-of-way. The Developer further agrees to maintain the finished street surfaces so that they are free from dirt caused by the Developer's operation. Any excessive accumulation of dirt and/or construction materials shall be considered sufficient cause for the City to withhold building permits and/or certificates of occupancy until the problem is corrected to the satisfaction of the Director of Engineering. If the Developer fails to adequately clean such streets within two (2) days after receipt of written notice, the City may have the streets cleaned at the Developer's expense and the Developer shall be responsible for prompt payment of all such costs. C. The Developer hereby agrees that it will require its subcontractors to cooperate with the City Is construction inspectors by ceasing operations when winds are of sufficient velocity to create blowing dust which, in the inspector's opinion, is hazardous to the public health and welfare. D. When the inspector determines that erosion (either by wind or water) is likely to be a problem, the surface area of erodible earth material exposed at any one time shall not exceed 200,000 square feet for earthworks operations. Temporary or permanent erosion control shall be incorporated into the development at the earliest practicable time. By way of explanation and without limitation, said control may consist of seeding with approved grasses, temporary dikes, gabions, and/or other devices. E. The Developer shall, pursuant to the terms of this Agreement, complete all improvements and perform all other 61 obligations, required herein, as such improvements or obligations may be shown on the original plat and related documents, or any replat as subsequently filed by the Developer, and the City may withhold such building permits and certificates of occupancy as it deems necessary to ensure performance hereof. F. Nothing herein contained shall be construed as a waiver of any requirements of the City Code, and the Developer agrees to comply with all requirements of the same. G. In the event the City waives any breach of this Agreement, no such waiver shall be held or construed to be a waiver of any subsequent breach hereof. H. Financial obligations of the City of Fort Collins payable after the current fiscal year and/or not appropriated or budgeted are contingent upon funds for that purpose being appropriated, budgeted and otherwise made available. I. This Agreement shall run with the Property and shall be binding upon the parties hereto, their personal representatives, heirs, successors, grantees and assigns. It is agreed that all improvements .required pursuant to this Agreement touch and concern the Property regardless of whether such improvements are located on the Property. Assignment of interest within the meaning of this paragraph shall specifically include, but not be limited to, a conveyance or assignment of any portion of the Developer's real or proprietary interest in the Property, as well as any assignment of the Developer's rights to develop the Property under the terms and conditions of this Agreement. J. In the event the Developer transfers title to the Property and is thereby divested of all equitable and legal interest in the Property, the City hereby agrees to release said Developer from liability under this Agreement with respect to any breach of the terms and conditions of this Agreement occurring after the date of any such transfer of interest. In such event, the succeeding property owner shall be bound by the terms of this Agreement. K. Each and every term of this Agreement shall be deemed to be a material element hereof. In the event that either party shall fail to perform according to the terms of this Agreement, such party may be declared in default. In the event that a party has been declared in default hereof, such defaulting party shall be given written notice specifying such default and shall be allowed a period of five (5) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to: (a) terminate the Agreement and seek damages; (b) Treat the Agreement as continuing and require specific performance or; (c) avail itself of any other remedy at law or equity. 71 L. In the event of the default of any of the provisions hereof by either party which shall require the party not in default to commence legal or equitable action against said defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney's fees and costs incurred by reason of the default. Nothing herein shall be construed to prevent or interfere with the City's rights and remedies specified in Paragraph III.E of this Agreement. 7 ATTEST: �" CITY CLERK APPROVED AS TO CONTENT: Director of Engineers APPRO D AS TO FORM: City Attorney ATTEST: arg et.- . Lon THE CITY OF FORT COLLINS, COLORADO, a Munic�pa1 Corporation By: c zz,4� City Manager DEVELOPER: FIELDSTONE, LTD. a Limit d Par rship By: Peter Lo g , C By: 1.1 EXHIBIT "A" 1. Schedule of water lines to be installed out of sequence. Not Applicable. 2. Schedule of sanitary sewer lines to be installed out of sequence. Not Applicable. 3. Schedule of street improvements to be installed out of sequence. Not Applicable. 4. Schedule of storm drainage improvements to be installed out of sequence. Not Applicable. W