HomeMy WebLinkAboutKELGER PARK - Filed DA-DEVELOPMENT AGREEMENT - 2003-12-08SUBDIVISION AGRFEAM
THIS AGREEMENT is made and entered into this
15th day of
November , A.D. 1977, by and between THE CITY OF FORT COLLINS,
COLORADO, a municipal corporation, hereinafter sometimes designated as the
"City", and hereinafter designated as the
"Developer",
WITNESSETH:
WHEREAS, Developer is the owner of certain property situate in the County
of Larimer and State of Colorado and legally described as follows:
ffELGEiS %i9hK SUG�C1i ✓i s O7 Q
WHEREAS, Developer desires to develop said property as a
subdivision and has submitted to the City a subdivision plat (and a site plan
of said property is to be developed as a Planned Unit Development), a copy of
which is on file :in the office of the City Engineer and by this reference made
a part hereof; and
MIEREAS, Developer has further submitted to the City a utility plan for
said lands, a copy of which is on file in the office of the City Engineer and
by this reference made a pkirt hereof; and
mIEREAS, the parties hereto have agreed that the development of said lands
will require increased municipal services from the City in order to serve such
area and will furU or require the installation of certain improvements primarily
of benefit to the lands to be developed and not to the City of Fort Collins as
a whole; and
WHEREAS, the City has approved the subdivision plat (and site plan where
applicable) submitted by the Developer subject to certain requirements and
conditions which involve the installation of and construction of utilities and
other municipal improvements in connection with said lands.
NOW, THERETORE, in consideration of the premises and the terns and conditions
herein stated and for other valuable consideration, the adequacy of which is
acknowledged by the parties hereto, it is agreed as follows:
1. Except as otherwise herein specifically agreed, the Developer agrees
to install and pay for all utility lines, storm drainage facilities, streets
and other municipal .facilities necessary to serve the lands within the subdivision.
2. Water Lines.
a. Developer agrees to install all water lines as shown on the utility
plans in accordance with the requirements and as shown on said plans, whether
such lines are actually on the property, bordering the property or on other
lands connecting the subject property to the existing City water distribution
system.
b. Such water lines shall be installed in full compliance with the
standard specifications of the City on file in the office of the City Engineer
and applicable provisions of the City Code relating to the installation of such
lines.
C. Developer understands and agrees that no building permit for any
structure in the subdivision shall be issued by the City until the water line
and the fire hydrant serving such structure is installed and accepted by the
City.
d. Any water lines described on Exhibit
A,
attached
hereto shall be
installed within the time required on Exhibit A.
If
the City
Engineer determines
that any lines shown on the utility plans are required to provide service to
Other areas of the City, those lines shall be installed within the time determined
by the City Engineer.
dm
e. All of said lines shall be installed at the sole expense of the
Developer,
f. The installation of said line shall be inspected by the Engineering
Services Department of the City and shall be subject to such department's ap-
proval. Developer agrees to correct any deficiencies in such installation in
order to meet the requirements of the plans and the specifications applicable
to such installation.
3. Sanitary Sewer Collection Lines.
a. The Developer agrees to install all sanitary sewer collection
lines shown on the utility plans, whether the same be on or off the subject
property.
b. Such sanitary sewer lines shall be installed in full compliance
with the standard specifications of the City on file in the office of the City
Engineer relating to the installation of such lines.
c. Developer understands and agrees that no building permit shall be
issued by the City for any structure in the subdivision until the sanitary sewer
line'serving such structure is installed and accepted by the City.
d. Any sanitary sewer lines described on Exhibit A, attached hereto
shall be installed within the time required on Exhibit A. If the City Engineer
determines that any lines shown in the utility plans are required to provide
service to other areas of the City, those lines shall be installed within the
time determined by the City Engineer.
e. All of said lines shall be installed at the sole expense of the
Developer.
-3-
z f- 49ze installation of said lines shall be inspected by the Engineering
Services Departimn t of the City and subject to such department's ap
proval.
.
j Developer agrees to correct any deficiencies in such installation in order to
meet the requirements of the plans and the specifications applicable to such
7 installation.
i
4. Electric Lines and Facilities. The City Light and Power Department
shall install all electric distribution lines and facilities required for the
subject property and the Developer shall i-xiy for such work in accordance with
the established charges of the Light and Power Department. Such installation
shall include all street lights required for the development.
5. Storm Sewer Lines and Facilities.
a. The Developer shall install all stone sewer lines and facilities
shown on the utility plans.
b. Such storm sewer lines and facilities shall be installed in full
compliance with the standard specifications of the City on file in the office
of the City Engineer relating to the installation of such lines.
c. All of said lines and facilities shall be constructed in an orderly
fashion, as determined by the City Engineer, so as to prevent damage to other
utilities, streets, curb, gutter, sidewalks, and all adjacent properties.
d. A11 of said facilities shall be installed at the sole expense of
Developer.
e. The installation of all of such lines and facilities shall be in -
sped by the Engineering Services Department of the City and shall be subject
to such department's approval. Developer agrees to correct any deficiencies
in such installation in order to meet the requirements of the plans and the
specifications applicable to such installation.
6. Streets.
a. The Developer agrees to install all streets shown on the utility
plans, complete with paving, curb, gutter and sidewalks.
b. Such streets shall be installed in full compliance with the standard
specifications of the City on file in the office of the City Engineer relating
to the installation of such streets.
c. No buildinq permit for the construction of any structure in the
subdivision shall be issued by the City until the street providing access to
the structures is improved with at least the gravel base required. Furthermore,
no building permit shall be issued by the City for any structure located in
excess of 660 feet from a single point of access.
d. Any streets described on Exhibit A, attached hereto, shall be
completely installed with the time required on Fxhibit A.' If the City Engineer
determines that any streets shown on the utility plans are required to provide
access to other areas of the City, those streets shall be installed within the
time required by the City Engineer.
e. All of said streets shall be installed at the sole expense of the
Developer,
f. Developer agrees to correct any deficiencies in such installation
in order to meet the requirements of the plans and the specifications applicable
to such installation.
g. Street improvements shall not be installed until all utility lines
to be placed in the streets have been completely installed and all services to
-5-
individual lots have been installed from nkiin utility lines to the property
line.
7. Other Requirements.
B. Miscellaneous.
a. This agreement shall be binding upon the parties hereto, their
heirs, personal representatives and assigns.
b. Nothing herein contained shall be construed as a waiver of any
requirements in the City SuLdivision Ordinance or any other provision of the
City Code and the Developer agrees to cony>]y with all requirements of the same.
ATTEST:
.,,City Clerk
� �� c6 �1 _
Dir r f Llxlineerinc Services
%City Attorney
THE CITY OF FORT COLLINS, COLORADO
layltr�itiVv�t/
City Manager
Y
President 6/ KERLAND CORPORATION
Secretary -'treasurer t6LAND CORPORATION
EXIIIBiT A
1. Schedule of crater lines to be installed out of sequence.
2. Schedule of sanitary sewer lines to be installed out of sequence.
/Kc,,r>
3. Schedule of street improvements to be installed out of sequence.