HomeMy WebLinkAboutHORSETOOTH BUSINESS PARK PUD - Filed DA-DEVELOPMENT AGREEMENT - 2003-12-01DEVELOPMENT AGREEMENT
THIS AGREEMENT, made and entered into this,,2,�9"day of
199/ , by and between the CITY OF FORT COLLINS, COLORADO, a
Municipal Corporation, hereinafter referred to as "the City" and
TIMBERLINE PARTNERS, LIMITED, a Colorado limited partnership,
hereinafter referred to as "the Developer".
WITNESSETH:
WHEREAS, the Developer is the Owner of certain property
situated in the County of Larimer, State of Colorado, and legally
described as follows, to wit:
HORSETOOTH BUSINESS PARK FIRST FILING, being a Replat of a
part of South Collins Tech Center First, Second and Third
filing and a part of the Northeast 1/4 of the Northeast 1/4
of Section 31, Township 7 North, Range 68 West of the Sixth
P.M., City of Fort Collins, County of Larimer, State of
Colorado.
WHEREAS, the Developer desires to develop said property and
has submitted to the City a subdivision plat and/or a site plan and
landscape plan, a copy of which is on file in the office of the
Director of Engineering and made a part hereof by reference; and
WHEREAS, the Developer has further submitted to the City
utility plans for said lands, a copy of which is on file in the
office of the Director of Engineering and made a part hereof by
reference; and
WHEREAS, the parties hereto have agreed that the development
of said lands: will require increased municipal services from the
City in order to serve such area and will further require the
installation of certain improvements primarily of benefit to the
lands to be developed and not to the City of Fort Collins as a
whole; and
WHEREAS, the City has approved the subdivision plat and/or
site plan and landscape plan submitted by the Developer subject to
certain requirements and conditions which involve the installation
of and construction of utilities and other municipal improvements
in connection with said lands.
NOW, THEREFORE, in consideration of the promises of the
parties hereto and other good and valuable consideration, the
receipt and adequacy of which is hereby acknowledged, it is agreed
as follows:
I. General Conditions
A. The terms of this Agreement shall govern all development
activities of, the Developer pertaining to the subject property
described above. For the purposes of this Agreement, "development
activities" shall include, but not be limited to, the following:
(1) The actual construction of improvements, (2) Obtaining a
building permit therefor, or (3) Any change in grade, contour or
appearance of said property caused by, or on behalf of, the
Developer with the intent to construct improvements thereon.
B. All water lines, sanitary sewer collection lines, storm
sewer lines and facilities, streets, curbs, gutters, sidewalks, and
bikepaths shall be installed as shown on the approved utility plans
and in full compliance with the Council -approved standards and
specifications of the City on file in the office of the Director of
Engineering at the time of approval of the utility plans relating
to the specific utility, subject to a three (3) year time
limitation from the date of execution of this agreement. In the
event that the Developer commences or performs any construction
pursuant hereto after three (3) years from the date of execution of
this agreement, the Developer shall resubmit the project utility
plans to the Director of Engineering for reexamination. The City
may require the Developer to comply with approved standards and
specifications of the City on file in the office of the Director of
Engineering at the time of resubmittal.
C. Except for the footing and foundation permit (Section:
2E.3.), no building permit for the construction of any structure
within the development shall be issued by the City until the water
lines, fire hydrants, sanitary sewer lines and streets (with at
least the base course completed) serving such structure have been
completed and accepted by the City. No building permits shall be
issued for any structure located in excess of six hundred sixty
feet (6601) from a single point of access.
D. Any water lines, sanitary sewer lines, storm drainage
lines, and/or streets described on Exhibit "A," attached hereto,
shall be installed within the time and/or sequence required on
Exhibit "A." If the Director of Engineering has determined that
any water lines, sanitary sewer lines, storm drainage facilities
and/or streets are required to provide service or access to other
areas of the City, those facilities shall be shown on the utility
plans and shall be installed by the Developer within the time as
established under "Special Conditions" in this document.
E. Except as otherwise herein specifically agreed, the
Developer agrees to install and pay for all water, sanitary sewer,
and storm drainage facilities and appurtenances, and all streets,
curbs, gutters, sidewalks, bikeways and other public improvements
required by this development as shown on the plat, site, landscape
and utility plans, and other approved documents pertaining to this
development on file with the City.
PA
F. Street improvements (except curbs, gutters and walks)
shall not be :installed until all utility lines to be placed therein
have been completely installed, including all individual lot
service lines, leading in and from the main to the property line.
G. The installation of all utilities shown on the utility
plans shall be inspected by the Engineering Department of the City
and shall be subject to such department's approval. The Developer
agrees to correct any deficiencies in such installations in order
to meet the requirements of the plans and/or specifications
applicable to such installation. In case of conflict, the utility
plans shall supersede the standard specifications.
H. All storm drainage facilities shall be so designed and
constructed by the Developer as toprotect downstream and adjacent
properties against injury and to adequately serve the property to
be developed (and other lands as may be required, if any). The
Developer has met or exceeded the minimum requirements for storm
drainage facilities as have been established by the City in its
Drainage Master Plans and Design Criteria. The Developer does
hereby indemnify and hold harmless the City from any and all claims
that might arise, directly or indirectly, as a result of the
discharge of injurious storm drainage or seepage waters from the
development in a manner or quantity different from that which was
historically discharged and caused by the design or construction of
the storm drainage facilities, except for (1) such claims and
damages as are caused by the acts or omissions of the City in
maintenance of such facilities as have been accepted by the City
for maintenance; (2) errors, if any, in the general concept of the
City's master plans (but not to include any details of such plans,
which details shall be the responsibility of the Developer); and
(3) specific directives that may be given to the Developer by the
City. Approval of and acceptance by the City of any storm drainage
facility design or construction shall in no manner be deemed to
constitute a waiver or relinquishment by the City of the aforesaid
indemnification. The Developer shall engage a licensed
professional engineer to design the storm drainage facilities as
aforesaid and it is expressly affirmed hereby that such engagement
shall be intended for the benefit of the City, and subsequent
purchasers of property in the development.
I. The Developer shall pay storm drainage basin fees in
accordance with Chapter 26, Article VII of the City Code. Storm
drainage improvements eligible for credit or City repayment under
the provisions of Chapter 26 are described together with estimated
cost of the improvements on the attached Exhibit "B," which
improvements, if applicable, shall include right-of-way, design and
construction costs. See Section II.C, Special Conditions, Storm
Drainage Lines and Appurtenances, for specific instructions.
3
J. The Developer shall provide the Director of Engineering
with certified Record Plan Transparencies on Black Image Diazo
Reverse Mylars upon completion of any phase of the construction.
II. Special Conditions
A. Water Lines
1. The Developer shall reimburse the City the sum of
$3,678.90 for the cost of the 16" water line installed in
Timberline Road adjacent to the South Collins Tech Center (the
former name for this development). Said reimbursement shall be
paid prior to the issuance of the first building permit for this
development.
B. Sewer Lines
Not Applicable
C. Storm Drainage Lines and Appurtenances
1. The Developer and the City agree that all on -site and
off -site storm drainage improvements shall be completed by the
Developer in accordance with the approved plans prior to the
issuance of any certificate of occupancy. Completion of
improvements shall include the certification by a licensed
professional engineer that the drainage facilities which serve this
development, have been constructed in conformance with said
approved plans.
2. The Developer agrees to provide and maintain erosion
control improvements as shown on the approved utility plans to
stabilize all over -lot grading in and adjacent to this development.
The erosion control improvements must be completed prior to the
issuance of any building permits.
D. Streets.
1. The Developer and the City agree that no street
oversizing reimbursement is due the Developer for this development.
E. Hazards and Emergency Access
1. No combustible material will be allowed on the site
until a permanent water system is installed by the Developer and
approved by the City.
2. The Developer shall provide an accessway to any
building under construction, adequate to handle any emergency
vehicles or equipment, and to properly maintain such accessway at
all times. Such accessway shall be at a minimum, 20' wide with 4"
4
aggregate base course material compacted according to City
Standards and with an 80' diameter turnaround at the building end
of said accessway.
3. The issuance of any footing foundation permit by the
City is made solely at the Developer's own risk and the Developer
shall hold the City harmless from any and all damages or injuries
arising directly or indirectly out of the issuance of said permit
prior to the completion of the requirements in accordance with
Section 29-678 of the Code of the City.
III. Miscellaneous
A. The Developer agrees to provide and install, at its
expense, adequate barricades, warning signs and similar safety
devices at all construction sites within the public right-of-way
and/or other areas as deemed necessary by the Director of
Engineering :in accordance with the City's "Work Area Traffic
Control Handbook" and shall not remove said safety devices until
the construction has been completed and approved by the Director of
Engineering.
B. The Developer shall, at all times, keep the public right-
of-way free from accumulation of waste material or rubbish caused
by the Developer's operation; shall remove such rubbish no less
than weekly and; at the completion of the work, shall remove all
such waste materials, rubbish, tools, construction equipment,
machinery, and surplus materials from the public right-of-way. The
Developer further agrees to maintain the finished street surfaces
so that they are free from dirt caused by the Developer's
operation. Any excessive accumulation of dirt and/or construction
materials shall be considered sufficient cause for the City to
withhold building permits and/or certificates of occupancy until
the problem is corrected to the satisfaction of the Director of
Engineering. If the Developer fails to adequately clean such
streets within two (2) days after receipt of written notice, the
City may have the streets cleaned at the Developer's expense and
the Developer shall be responsible for prompt payment of all such
costs.
C. The Developer hereby insures that its subcontractors shall
cooperate with the City's construction inspectors by ceasing
operations when winds are of sufficient velocity to create blowing
dust which, in the inspector's opinion, is hazardous to the public
health and welfare.
D. When the inspector determines that erosion (either by wind
or water) is likely to be a problem, the surface area of erodable
earth material exposed at any one time shall not exceed 200,000
square feet for earthworks operations. Temporary or permanent
erosion control shall be incorporated into the development at the
5
earliest practicable time. By way of explanation and without
limitation, :said control may consist of seeding with approved
grasses, temporary dikes, gabions, and/or other devices.
E. The Developer shall, pursuant to the terms of this
Agreement, complete all improvements and perform all other
obligations, required herein, as such improvements or obligations
may be shown on the original plat and related documents, or any
replat as subsequently filed by the Developer, and the City may
withhold such building permits and certificates of occupancy as it
deems necessary to ensure performance hereof.
F. Nothing herein contained shall be construed as a waiver of
any requirements of the City Code, and the Developer agrees to
comply with all requirements of the same.
G. In the event the City waives any breach of this Agreement,
no such waiver shall be held or construed to be a waiver of any
subsequent breach hereof.
H. Financial obligations of the City of Fort Collins payable
after the current fiscal year and/or not appropriated or budgeted
are contingent upon funds for that purpose being appropriated,
budgeted and otherwise made available.
I. This Agreement shall run with the real property herein
described and shall be binding upon the parties hereto, their
personal representatives, heirs, successors, grantees and assigns.
Assignment of interest within the meaning of this paragraph shall
specifically include, but not be limited to, a conveyance or
assignment of any portion of the Developer's real or proprietary
interest in 'the real property herein described, as well as any
assignment of the Developer's rights to develop such property under
the terms and conditions of this Agreement.
J. In the event the Developer
property and is thereby divested
interest in said property, the City
Developer from liability under this
breach of the terms and conditions
after the date of any such transfer
the succeeding property owner shall
Agreement.
transfers title to such real
of all equitable and legal
hereby agrees to release said
Agreement with respect to any
of this Agreement occurring
of interest. In such event,
be bound by the terms of this
K. Each and every term of this Agreement shall be deemed to
be a material element hereof. In the event that either party shall
fail to perform according to the terms of this Agreement, such
party may be declared in default. In the event that a party has
been declared in default hereof, such defaulting party shall be
given written notice specifying such default and shall be allowed
a period of five (5) days within which to cure said default. In
0
the event the default remains uncorrected, the party declaring
default may elect to: (a) terminate the Agreement and seek damages;
(b) Treat the Agreement as continuing and require specific
performance or; (c) avail itself of any other remedy at law or
equity.
L. In the event of the default of any of the provisions
hereof by either party which shall require the party not in default
to commence legal or equitable action against said defaulting
party, the defaulting party shall be liable to the non -defaulting
party for the non -defaulting party's reasonable attorney's fees and
costs incurred by reason of the default. Nothing herein shall be
construed to prevent or interfere with the City's rights and
remedies specified in Paragraph III.E of this Agreement.
THE CITY OF FORT COLLINS, COLORADO
A Munici al Corporation
By:
City Manager
ATAT S
CITY CLERK
APPROVED AS TO FORM:
DireOfptof Engineering
C' y Attorney
DEVELOPER:
TIMBERLINE PARTNERS, LIMITED,
a Colorado limited partnership
By:
By:
Gerald P. Lee
Partner
►1
EXHIBIT "A"
1. Schedule of water lines to be installed out of sequence.
Not Applicable.
2. Schedule of sanitary sewer lines to be installed out of
sequence.
Not Applicable.
3. Schedule of street improvements to be installed out of
sequence.
Not Applicable.
4. Schedule of storm drainage improvements to be installed out
of sequence.
Not Applicable.
0
EXHIBIT "B"
NOT APPLICABLE