June 19, 1981
Mr, Bob Smith
Fort Collins Engineering Department
P. 0. Box 580
Fort Collins, CO 80522
Dear Bob:
Attached herewith are the plans and calculations illustrating the
method we, have taken to treat the drainage generated on the Four
Seasons Fourth Filing site. The approach taken for the Fourth
filing correlates closely with that used for the Third Filing.
Detention on site is difficult due to grading requirements and
the subsequent destruction of a sizeable number of existing apple
trees. Therefore, we propose allowing the runoff to flow directly
into the curb and gutter along Arbor Avenue. The runoff will then
follow the routing of runoff from the Third Filing; that is east
along Arbor Avenue to Tradition Drive then south to Bonita Avenue
then east. across Tradition Drive in the existing valley pan and
continuing east along the south curb and gutter of Bonita Avenue;
from there the runoff will flow in the west curb and gutter of
Benthaven Street. The runoff will flow south to the catch basins
in Benthaven where it will be piped east into the detention pond
just eastof the street. The attached calculations show that the
street capacities of these existing streets are adequate for these
additional flows. Calculations are attached to show the adequacy
of the pond expansion.
If you have any questions regarding this matter, please contact me.
Very truly yours,
M & I, I61C.
IAiAZJ2-
Micheal R. Lawson
MRL:ms
Enclosures
Cow�•Kcrc.�.�..� �
G•R3ac G .ems.=o.4t
tq.lt ctiu(es
G .s4 .
9r
q.'5'54 ac.
C= 0-17
5�3r�S s
_ CZ I.sss
c=
-� .,> r 1 c c
�.= O•�l'S
c=p•45
66.4$6c• � Q.1L c.4•
1 --
-T
12;n 4 .
tss- 7-7 of re_ '
N4 G7
-�43�ocr E
vtl,
C=o-I�j
1 C-/Z8IR(
---
LO�c l U�ci
LS�J,
,i INS COv(.S4,v v c4-lam r� Q-Cj rJ ��!Q ov.e
(IS'Al. _a ( UI n. .w
r
_
H1
A
FORTCOLLINS COLORADO 80525
HONFES„ IIdC. (303) 226-3303
Business Address 4730 S. College, Ft. Collins, CO.
July 7, 1981
Mr. Josh Richardson
Engineering Department
City of Fort: Collins
P.O. Box 58CI
Ft. Collins, CO 80522
RE: Driveway Variance
Final Flat Site Plan
Four Seasons Fourth Filing
Dear Josh:
We request a variance to modify the driveway set -back distance
from Arbor Avenue as shown on the above site plan. The drive-
way set -back: from Arbor Avenue is supposed to be 50'. We
request the following variances:
Lot 165 - From 50' to 37'
Lot 166 - From 50' to 45'
Lot 174 - From 50' to 45'
These distances still allow a two car length stacking area be-
tween Arbor Avenue and the nearest driveways.
If you have any questions, please call me.
Sincerely, Aeu
„O pCT �R gb11QANCrc
M. S#k!phen McMillan
MSM:rlj
cc: Lloyd McLaughlin
LICENSED • BONDED • INSURED Offices in . . . NEVADA, WYOMING, IDAHO, COLORADO
( IIY UI I OI21 ( OI 1 INS P.O. Box 580 Fort Collins
ENGINEERING SERVICES
July 21, 198.1
M. Stephen W Millan
Chinn Hanes, Inc.
4730 S. College
Fort Collins, Colorado
Dear Steve:
Colorado 80522
We have reviewed your request for a variance to a driveway setback
of 50-feet for your Four Seasons 4th Filing. I am happy to inform
you that we will accept your request due to the low traffic volume
on your private drive. If you have any questions, call me at
484-4220, extension 735.
Sincerely,
Josh Richardson
Engineering
cc: Traffic
Planning
VarianaE� file
Project file
303) 484 4220 Ext. 723
.. __ ......a... .__:arms
CITY OF FORT COLLINS P.O. Box 580 Fort Collins, Colorado 80522 Phone 484-4220 E
ENGINEERING SERVICES
November 29, 1982
Reuben Ulrich
Chism Homes, Inc.
4730 S. College
Fort Collins, CO
Dear Mr. Ulrich:
We have received ccFqDlaints recently about a drainage problem on the
south side of Burgundy Court near the bike path entrance/exit. Apparently
there is a low point in the gutter which causes a perpetual stand of water.
In the winter, icing problems will subsequently occur and this will present
an even greater nuisance than the current ponding of water.
When one of the residents called Chism Homes to complain, she was told
that the City was responsible for such problems. Please be aware that
this is a mistaken presumption. Chapter 95 §95-34 of the Fort Collins
Code states that:
It shall be the duty of the City Engineer to have charge of
all sidewalks, curbs and gutters and driveways within the limits
of the City of Fort Collins and to see that the same are properly
constructed and kept in repair, and in case any thereof shall
become unsafe or out of repair, to order the same to be repaired
at the expense of the property owner as herein provided......
The Code further states that failure to repair a sidewalk or curb and gutter
deemed unsafe to the public will cause the required work to be performed by
the City and. the cost of the repairs or reconstruction will be collected
from the owner through the County Treasurer's office with the general
property taxies.
Please note also that this section of sidewalk and curb and gutter has not
been constructed according to the plans on file in the City Engineer's
office as required.
I'm sure you can appreciate the concerns of the area residents. Solving this
problem is in the best interests of all concerned - the residents, the City,
and your company.
I would appreciate your cooperation in this matter. If you have any questions
or if I can be of any assistance, please do not hesitate to call me.
Sincerely,
Michael H. Mercer
Engineering Services
cc: Dave Stringer
Suzannah Johnson
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
September 23, 1985
Mr. Dan Wheeler
PO Box 519 .5�
Greeley, CO 80632
Dear Dan,
As per our conversation today, I am writing this letter to confirm the
conditions by which I will allow the Second Phase of Four Seasons to be
heard At the September 25th Meeting of the Planning and Zoning Board.
Because one of the parties (Ron Strahle) who owns the land to the east and
from whom you are seeking an easement is out of town and unable to be
reached and because I have a copy of a letter agreeing to work out the
easement, I will allow the item to be heard with the following two
conditions. Before the City will file the project the easement must be
submitted as well as the documentation for handling the street name
changes. This must be accomplished within 30 days from the date of this
letter. Because the detention pond cannot be built without this easement,
you will be unable to get more than 35 building permits for Four Seasons
Fifth both phases, until the storm drainage improvements are completed (as
per the Development Agreement).
Please see that this is accomplished in a timely manner.
Sincerely,
A/41
Bonnie Tripoli
Development Coordinator
CC: Dave Stringer, Chief Construction Inspector