HomeMy WebLinkAboutFRONT NINE AT SOUTHRIDGE GREENS PUD - Filed CS-COMMENT SHEETS - 2003-11-28DATE DEPARTMEN)'
"000 j I I , FAI
a
COMMENTS
71
c
AN
2-1
z�,
*
0
ITEM; -9z F�
COMMENTS
. Glc -sue -��
DEVELOPMENT CENTER EXT.655
May 26, 1983
Mr. Bernie Cain
BUCAIN CORPORATION
1705 Heatheridge Road
Fort Collins, Colorado 80526
Dear Bernie:
Staff has reviewed the Fairway 4 and Tract H, Southridge Greens PUD and has
the following comments:
Fairway 4
1. Front Nine Drive is to be 36 feet paved width to the bridge inter-
sections and 28 feet for the remainder of the loop.
2. Access to Tract G, from Front Nine Drive, should not be designed as
a through street. Cul de sacs or private driveways would be accept-
able.
3. Crossover Lane is to be redesigned so as not to be a through street.
A private driveway/parking lot, still maintaining fire access, is
acceptable.
4. The location and distribution of parking is questioned. Overflow
parking should be convenient to all units. Parking on the inside
of curves is not permitted. Not more than 50% of street frontage
is to be parking and driveways.
5. Private drives can be 24 feet instead of 25 feet as proposed.
6. All streets are to be designed to City standards.
Tract H
7. A variance request to permit the 28 feet is to be submitted to the
Development Center.
8. A variance request to permit intersections offset less than the City
standard of 200 feet is to be submitted to the Development Center.
Mr. Bernie Cain
May 26, 1983
Page Two
9. 12 feel: front lot easements are to be provided.
10. Staff suggests removing the "common open space" area as it appears
unusable.
11. Street names are to be on the site plan.
12. All streets are to be designed to City standards.
13. Preliminary utility and storm drainage plans are to be submitted
for both projects.
Revised site and utilities plans are to be submitted by Thursday, June 9,
1983. All graphics, including a colored rendering of the site plan and
8V' x 11" reducl'ions are to be submitted by Monday, June 20, 1983.
If you have any questions regarding the above comments, please feel free to
contact me.
Sincerely,
Cathy Ch5 nese
City Planner
CC:ro
cc: Mauri Rupel, Development Center Director
Bonnie Tripoli, Engineering Analyst