Loading...
HomeMy WebLinkAboutFRONT NINE AT SOUTHRIDGE GREENS PUD - Filed GC-GENERAL CORRESPONDENCE - 2003-11-28April 29, 1983 Project No.: 217-10 Cathy Chian^se Planner Planning and Development City of Fort Collins P.O. Box 580 Ft. Collins, Colorado 80522 Re: Tract 11 at SouthRidge Greens P.U.D. Dear Cathy: On April 28, 1983 we met to discuss the preliminary road layout at ','outhRidge Greens in general and at Tract H in particular. Attending were yourself, Rick Ensdorff, Mauri Rupel, Bernie Cain, and myself, Bill Blackwell. Following are major items of discussion at the meeting: 1) I made a presentation of preliminary road alignments including traffic patterns and proposed street widths. Enclosed is a copy of the drawing presented. 2) It was determined that the loop going north through tracts D and F may be 28' wide. 3) Bridges on this loop may be 28' wide. The street width transition should not be at the bridge but at the inter- section with the boulevard. 4) The boulevard section fronting Fairway II has been retained for two 'points of fire access during constructin, not for aesthetics. The private drive on Fairway II can provide a second point of access. Thus the boulevard section need be carried only to the 1st entrance north of the main boulevard. 5) 1 presented sketches for the street in Tract H wrapping the 8th Green. H � 1 Z_ W E I O ' U �^ s A11JOl3A iino n, .NI'IOv:Hoo U~ LO lJ� w a U O — ��. l _ W Q N 1' XW U W Z 1 i H r a x V Z _i b.l W a 2 ZE 1 ow U J W F- a U N T T - Z it 11 O z Z LJ m ^j ^+ w w N o cl T O l w w w N a Vn ; o �A Z a: Q w " Imo. Z w w p Ld o \ � o — o cr c� a a - W U cc • I u W 1 N �l tt Fmfn L& R FIGURE 13 DESIGN C:O.APUTATION FORM FOR CULVERTS 6^ A� CITY OF FORT COLLINS DEVELOPMENT SERVICES — ENGINEERING August 11, 1988 Cain Companies Bernie Cain 425 W. Mulberry Fort Collins, Colorado Re: Street and traffic signs in the Southridge Greens P.U.D. and Front Nine Dear Mr. Developer: My office has been informed by Dick Wartenbe of the City Traffic Department that the sigrvs installed in the Southridge Greens P.U.D. and Front Nine Development do not meet the City's criteria for signs. Dick has talked with your sign contractor, Rocky Mountain Safety Services, and was not satisfied with their response. Therefore, as the developer of this project; it is your responsibility to the City that your sub -contractors provide acceptable products and work. Please be informed that until such time as the signs are brought up to the City standard, Certificates of occupancy will not be issued for any structure within this development. If you have any questions regarding specific corrections to the signs in this development, please contact Dick Wartenbe at 221-6815. Sincerely, David Stringer Chief Construction Inspector CC: Gary Diede r'q w 300 LaPorte Ave. • PO. Box 580 • Fort Collins. Colorado 80522 • (303) 221-6605 6) It was determined this street should be a 25 mph design speed and a 28 foot street width. A variance may be required for corner sight distance, but the design should come as close to City Standards as possible. 7) The traffic circle was discussed. Traffic circles are generally discouraged by the City, but this application is justified from both aesthetic and traffic circulation reasons. a) Medians on north and south streets should be 75 to 100 feet long and taper to a minimum of four feet. b) Signage will be "Keep Right" at. end of median, "Yield" at the circle, and a direction arrow on the circle's median opposite from approaching traffic. c) The possibility of a right turn only from Tract E between the circle and the entrance of the street mentioned in 5 and 15 was discussed. If the median in the street is extended past the entrance making physical restraint from left turns a variance to the 150' foot offset requirements will be considered. If you have any corrections or additions to these minutes, please contact me. Sincerely, ENGINEERING PROFESSIONALS, INC. William H. Blackwell, P.E. WHB/psh ENC. CC: Cliff Buckley Bernie Cain CITY OF PORT DEVELOPMENT CENTER EXT.655 M E M O R A N D U M To: Cathy Chianese, Senior City Planner From: Bonnie Tripoli, Utility Plans Examiner '3'S Re: Variance Requests for Southridge Greens Tract H Date: June 22, 1983 At this point in the review process, I can only give you answers to two of Engineering Professionals' requests for variances. The rest are based on data reviewed at the time of the final and will be reviewed at that time. The request for a variance from 36 foot street width to a 28 foot street width was granted by Rick Ensdorff on the basis of the low volume of traffic and that the configuration of the streets would make it unlikely for anyone to use the streets for a through movement. No parking signs will be required to be installed by the developer at the time of acceptance of the street by the City. The second request. was for a variance to the 200 foot separation of intersec- tions. EPI is requesting only a 165 foot separation between the intersections of Hummel Lane and Front Nine Drive. and Southridge Greens Boulevard and Hummel Lane. Due to site restraints and again the expected low volume of traffic, the City will grant this variance. It should be noted that changes in the final design may be necessary if the remainder of the variances are not granted. BT:ro Fort Collins -Loveland Water District Mouth Fort Collins Sanitation District 4700 South College Avenue FORT COLLINS, COLORADO 80525 RECEIVED TELEPHONE 226-3104 — 669-4321 June 24, 1983 Development Center Attention: Mauri Ruppel P. 0. Box 580 Fort Collins, CO 80522 RE: Front Nine Drive, Southridge Greens P.U.D. Dear Mauri: JUN 2 7 1363 PLANNING DEPARTMENT The District has reviewed the above mentioned project and has the following comments: 1. The change in water line sizing and location from the master plan needs to be explained. 2. District easements will be required for water and sanitary sewer lines that are not located within the streets. 3. Submission of the Fairway II utility plans will be required in order for the District to complete the review of the Front Nine Drive plans. 4. The vertical and horizontal separations of the water, sanitary sewer and storm lines need to be clearly defined at the intersection of Southridge Greens Boulevard and Greenridge Parkway. 5. The District will require curb stops and interior meter settings for this development. If you have any questions, please feel free to contact me. or Terry Farrill. Since/rely, Michael DiTullio District Manager MDT/ccs cc: Terry Farrill, Systems Engineer Dean Hill, Operations Supervisor July 22, 1983 Project No.: :217-10 Mr. Phil Waite City of Fort Collins P.O. Box 580 Fort Collins, Co. 80522 0 engineering professionals inc. Re: Temporary storm water discharge from The Front Nine at SouthRidge. Dear Phil: During the City's review of the Front Nine, Tract H, at SouthRidge Greens, the request for more information about discharge at the east side of the site was requested. This letter provides that information. The master drainage plan calls for discharge from SouthRidge Boulevard approximately 700 feet from the end of construction this phase, see Figure 1. When the project is corr_pleted this is where the runoff will be discharged from the road. Until that time the water will be allowed to run across the unplatted residential- area to be intercepted by the golf course drainage system, routed through the irrigation pond, and discharged to Fossil Creek. See Figure 2. If you have any questions concerning this, please let me know. Sincerely, ENGINEERING PROFESSIONALS, INC. 3 � William H. Blackwell, P.E. WHB/psh �I CQo 303/226-3852 • 2625 Redwing Road • Drake Executive Plaza, Suite 110 • Fort Collins, Colorado 80526 w foo� Nrcw 2 � I 1 1® l q c.(A.CW q C 3 c r - - - - -- ----- ' I ® 36 --- - . ®O 0 / s / r CAjCy BAS/N FLOry FOR M4(/OR ,1 .47'0RM O,VLY �� 4 6 No Text November 8, 1983 Project No.: 217-10 Mr. Phil Waite City of Fort Collins P.O. Box 580 Fort Collins, Co. 80522 re: Addendum to the Front Nine at SouthRidge Greens Drainage Report. Dear Phil: It is the developer's wish to extend the downstream end of the storm sewer that drains the intersection of Front Nine Drive and SouthRidge Boulevard. The purpose of this extension is to eliminate a portion of open channel- that otherwise would be four feet below finished grade. The location of this channel., on the golf course beside the 8t1) green., makes the aesthetics of such a cut a major concern. As can be seen from the attached calculations, the installed storm sewer operates under inlet control. The downstream extension does not change this i-nl.et control.. There would be no change in water surface at the intersection due to this extension. Sincerely, ENGINEERING PROFESSIONALS, INC. William H. Blackwell, P.E. WHB/psm ENC. 303/226-3852 • 26:25 Redwing Road • Drake Executive Plaza, Suite 110 • Fort Collins, Colorado 80526 it w 4 q� -auRSE cvwrft�acro�r ffAOE 9W.4LE G-��YCNO 7TY /L /NE. A X 5EE 5NEET // a�'TO,Ph1 SEIYEP li i �FA6; j