Loading...
HomeMy WebLinkAboutFOX MEADOWS BUSINESS PARK - Filed CS-COMMENT SHEETS - 2003-11-28CITY OF FORT COLLINS COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION M E M O R A N D U M Gob Snow t1ountain Bell -Engineering j24 C Magnolia Collins, CO 80521 TO: FROM: Mike Herzig, Develooment Coordinator RE: Subdivision Utility Plans DATE: February 8, 1988 Submitted for your review and comment are utility glans for: Fox Meadows Business Park Please respond by: February 16, 1988 BZJ7 i+y .•l jr•: OFFICE OF COMMUNITY DEVELOPMENT. PLANNING DIVISION 300 LaPorte Ave- P.O. Box 580 Fort Colhns, Colorado 80522 (303) 221 6750 DATE: 8 Feb 88 DEPARTMENT: ITEM. 8-82t, FOX MEADOWS BUSINESS PARK - Preliminary & Final No Problems Problems or Concerns (see' below) �T/l11J` C-ir�vT3 Act �r� ?� Date 2 _$. Signature CI CITY OF FORT COLLINS OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT February 17, 1988 Mr. Phillip Robinson Stewart and Associates 214 North Howes Street Fort Collins, CO 80521 Dear Mr. Robinson: Staff has reviewed the request for the Fox Meadows Busine plat located at the southeast corner of Horsetoot Road and Timberline Road and offers the following comments: 1. The easements along both arterials (Horsctooth and Timberline) should be increased to 15 feet and designated as "utility, WcpeFe--E�sil easement". Q� 2. The 7 foot wide sidewalk should be carried through the access ramp and then tapered down to 4 feet. 3. A soils report is needed at this point in time. This will allow staff to review the paving plan. 4. The 21 inch storm drainage pipe that would receive flows does not belong to the City. All storm drainage improvements should be put in an easement. Also, getting the storm drainage flows across Bighorn Drive from north to south may be a problem. These issues should be resolved in a standard -drainage report. 5. The existing sanitary sewer in Bighorn Drive must be extended'' to// j Timberline Road to accommodate the South Collins Tech Center.e.¢� 6. A repay exists on the water line in Timberline Road, S2.76 per foot. bLHVIGLJ. PLANNING 7. The Parks and Rec Department will not provide any maintenance of any landscape, improvements in the Timberline Road right-of-way. 8. The plat document should contain a vicinity map. There appears to be available space in the upper right corner of the document to provide a vicinity at an appropriate scale. 9. The Department of Natural Resources, the City Forester, and the Planning Department are very concerned about saving significant vcgc- tation. There is a stand of mature trees on the south property line. Please address whether these trees arc on the property. If these trees are on the property, then it is suggested that the City Forester, Mr. Tim Buchanan, be consulted to conduct an analysis. It may be necessary to prune to encourage preservation. 10. Developers of Sunstone P.U.D. have dedicated a drainage tract to the City Stormwater Utility to feed a regional detention pond. Within this drainage channel, the developer will also construct a bicycic/pedestrian path which will be located on the south property line of your proposed subdivision. It is important to the City that this bike path be extended to Timberline Road since Timberline is clarified as a major arterial and would probably feature a s4 foot, OWr an street bike #err As part of the subdivision request, an casement should be dedicated for continuation of this bicycle and pedestrian path. In addition, a commitment should be made either on the plat or by development agreement that design and construction of this path will be the responsibility of the developer of Fox Meadows Business Park. Detailed plans of this path are available at the Planning Department. 11. Please note that WestGas owns and operates an 8" high pressure natural gas pipeline which is close to the northwest corner of Tract 2. This pipeline runs from west to east in Horsetooth Road and turns north in Timberline Road. WestGas must be given 48 hours notice of any proposed activity in the vicinity. All crossings which might involve this pipeline should be coordinated well in ad-vance of construction. This concludes staff comments at this time. I suggest that we immediately set up a meeting to discuss these comments since the request is for both a preliminary and final combined. In order to stay on schedule for the March 28, 1988 Planning and Zoning Board, please note the following deadlines: Plan revisions are due March 2, 1988 (3 copies) PA1T's, colored renderings, and 10 final prints are due March 21. 1988 Final documents are (]no March 24, 1988 As always, please call if there arc any questions. Sincerely, Ted Shepard Project Planner cc: Joe Frank, Assistant Planning Director Mike Herzig, Development Engineer CITY OF FORT COLLINS OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT M E M O R A N D U M TO: Bob Snow, Mountain Bell Gary Huett, Public Service of Colorado Mark Taylor, Water and Sewer Doug Martine, Light and Power Glenn Schlueter, Storm Drainage Leslie Stumpe, Parks FROM: Jim Faulhaber, Civil Engineer I DATE: March 5, 1988 RE: Fox Meadows Business Park Please review the revised utility plan for Fox Meadows Business Park. I would appreciate receiving a response prior to March 14, 1988. No Problems Problems - Which are: MEN0014591 OFFICF 01 DEVELOPMENT 300 LaPorte Ave. PO Box 580 Fort Collin;, Colorado 80522 (303) 221-6750 SERVICES. PLANNING CITY OF FORT COLLINS OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT M E M O R A N D U M TO: Bob Snow, Mountain Bell Gary Huett, Public Service of Colorado Mark Taylor, Water and Sewer Doug Martine, Light and Power Glenn Schlueter, Storm Drainage Leslie Stumpe, Parks FROM: Jim Faulhaber, Civil Engineer I ,gv� i DATE: March 5, 1988 RE: Fox Meadows Business Park MAR I l988 Please review the revised utility plan for Fox Meadows Business Park. I would appreciate receiving a response prior to March la, 1988. No Problems Problems - Which are: t & ,k1 of v&1w- 60" Cj r661.e, s6i &. ner �11 ee,Q,,,, s F3Usl��as (D�rk- vyIi�cwt (b (o e uAjuc/ an--3W-4-t-;n w� i� -bzjeAdL # Ariuewpii rAJ;us OFFICE OF DFVFI OPMENT 300 LaPorte Ave. P O Box 580 Fort Collins, Colorado 80522 (303) 221-6750 SERVICES. PLANNING it -I-E M 7Sep 88 1.) PARIMMI.ery 8-82F EC"-: MEAL.WS BUSINESS PARK - MASTER PLAN zoroblems Prot'F:ms or Concerns (see below) Date Signature E DATE. 7 Sep 88 DEPART FNT: � ITEM: 8-82E FOX MEADOWS BUSINESS PARK, PHASE 1 - PRELIMINARY G� No Problems Problems or Concerns (see below) • I-lfty� ogRw/kz D lJRol-vl/ lNe rl/17G6f Le4:-WL 0E5 e2i p77 . • uTt�r FRSc-I'-�c=rr5 ffz.�NG /{a/C}5� 7a�Tl� `{ 71 6�%�Llnlr iU c�O Ta CJC SM7Wh' y� Ij / n�lDE, 51Glti 0�5TIrNCeS irRr Tbo 5/�o2T r�R LN TRIa"N C�5 77J CaN U� N/ L-"hJ Cc- yYDI� A//-1 G� ry/�dh5ciy� 02 C {-/OZ/` 7-6 Date Signature /'-� �r�� ���