Loading...
HomeMy WebLinkAboutFOX MEADOWS BUSINESS PARK ONE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2003-11-28City of I ort Collin" Transportation Services I nc,ineering Department Development Construction Permit, Page 1/3 DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 00-24-00 Issuance Date: /% — �k Project Name: FOX MEADOWS Business Park No. I Project Location: Northeast Corner of Timberline and Horsetooth Roads Permittee: Maxwell Construction, Inc. City and developer contacts: See attached Exhibit A for names and phone numbers of all contact persons for this project. Fees: Erosion Control ( to be paid to Storm Water Utility prior to permit issuance Permit Application Fee (paid at the time of application) $300.00 Construction Inspection Fee (paid prior to issuance of this permit) Street excavation fee $350.00 10 177.20 Total $10827.20 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $144,851.00 Form of security deposited with the City: ' cL , l We . -,Icc �%� PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide Aas-constructed@ plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer@ and AEngineer@ shall mean a Professional Engineer licensed in Colorado.) '181 Noi III ('11I1o,2c A%cnuL� • N). Hos 580 • Fort CC] IIn,,, CO 80522-0580 • (970) 221-6605, • 1'AX (970) 2214,378 WV,w� .ci.fort-collins.cu.us OCT-10-2000 TUE 03;16 PM CFC ENO. FAX NO, 9702216378 P, 06 ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated { value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all ptivate WRTastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached Sheet titled "Project Quantities and Cost Estimate Sheet." Public Inirasttvcture, estimated coats S /S/Y. 85/, QO Private infrastructure, estimated coats s I certify that the information on this permit application alone with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable intsrost in the real property, as defined in Section 1.2 of the City Code; and including common areas legally comaected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby pennit City officials to enter upon the property for purposes of inspoction and, if necessary, to enter upon such pr erty to peto�n work quired of the applicant if the applicant were to fail to perform the required k.,I ��� Applicant 9 'd VSH'CN E9LOH LEOE Wd89 6 •0000 Oct.l? 2000 3:58PP1 3037831753 No.3834 P. 7 ail i 8pp8p8p8pp8p 1�8pp8881{8��A8t8pppp(8yy88 N N 11511 N N W N mN N I p8pg8Om�S8�8N8� N N b w N M N N i N M N INN I i fppD ppp [�pp 0 iO (O ppppp 80O OO(pOp�J p 0eep C! pBpp p N M {+Oq�{B{�/�OOpQ N N S W p pOe N �"� W'lw m M 51 pmpp�p N M N p�p N p�p� N NI I �18p8888p8 3pp8ip3p�pP3S88ci 1 pN� MM fQ�3ryO8po8ppQ8Q®88'1888♦8� 1p�N I.N � fm7 fG iN m NNci ' Iry�S t{[�y�fm�{N tr ��rrff of pCQ� pGg V C Of In m D m IY QQOO rION NN NW—KZ 7 pm1cm0 f LLJ n J LLJ U U��� LLJ LLJ W W W W��� N � J J f4 N r N N lb a j ou UZ A MC'ON ESLOEBLEOE ME:[ 00H 'H,PO Oct.12. 2000— 3:59PM-3031B30753--T--_ g ';olll I e 3834—P. 9-..1 DEVELOPMENT BOND Bond No. 400 SB 6282 FGVOW ALL lv v BY THESE PRESENTS: that we MAXWELL CONSTRUCTION, INC. 333 West Hampden Avenue, Suite 325, Englewood Colorado 80110 as Principal, he" nafter rcfcrred to as the Developer" and ST. PAUL FIRE AND MARINE INSURANCE COMPANY St. Paul, Minnesota a corporaticn organized under the laws of the State of Minnesot as Surety, hcrcia er referred to as "Surety", are held and firmly bound unto the CITY OF FORT COLLLNS, COLORADO, a municipal corporation, hereinafter refetrcd to as the "City", in the sum of ONE HUNDRED FORTY FOUR THOUSAND EIGHT HUNDRED PIETY ONE AND NO/100-------- Dollars (s 144, 851.00--� t0 be d to the for C r which payment well and truly to be made, we bird ourselves, our heirs,pexecutors and administrators, successors and assig ns, firmly by these preseIItY. doper has submitted to the City for its approval of the fallowing develo Fox Meadows, Northeast Corner of Timberline and Horsetooth Roads, Collins, Colorado and WHEREAS, the City has approved said development project and the Developer and the City have executed a Development Agreement dated pig to the development project (the "Development Agreement-) a copy of which is by reference made a part hereof; and WHEREAS, the City Code requires that the Developer post a bond equal to the total cost to construct the Developer's portion of the public infrastructure (which, upon completion and acceptance by the City shall become the oroocrty of the City), which for the above -described dcvclopmcatproject shall be ONE HUNDRED FORTY FOUR THOUSAND EIGHT HUNDRED FIFTY ONE AND NO/100-- Dollars (5 144, 851.00--), with such Surety to be upon condition that the bond remain in full force and effect until such time as the City releases such bond, which release Shall occur upon (1) issuance to the Developer of a notice of final acceptance stating that ail of the public infrastructure improvements have been completed in accordance with the approved plans for said development project and the specifications and standards of the City; and (2) delivery to the City by the Developer of a bond, cash or other securing deposit in a form acceptable to the City to guarantee that the Developer shall maintain and repair all of said public infrastructure impmvemrnts in accordance with the City Code. NOW, THEREFORE, the condition of this oblipticn is such that if the Developershall truly and faithhilly perform to the satis faction of the City its obligations in constructing, maintaining and repairing the public infrastructure constructed in connection with the aforesaid development project in accordance with the City Code (including the Land Use Code and Transitional Land Use Regulations, as applicable), and the Development AgmemenS then this obligation shall be void; otherwise to reanairr in full force and effect DATED this 6th day of November 2000 DEVELOPER: MAXWELL CONSTRUCTION, INC. Printed Name By. Title: ST. PAUL FIRE AND MARINE SURETY: INSURANCE COMPANY PrintedNatne By ! dry r 1/,�✓n7� Atfomey-im-Fact (attach Pawcr of Aftimmey) Cynthia M. Burnett A'n HRHHilb,Rogal and Hamilton Company i Surety bonds and insurance POWER OF AT7ORNEY 5c1t )III 'd S11rch ('onlpenv St. I'lud Dire and Nlarinu Insurance ('ongmnr St. Paid Guardian himauce Cum pan,' St. Paul Nlerrun Imuraucu C'ompluty IIItI(ed States I ideliIN and Guaranty Company Fidulit, and Guaranty l nfinl'am e Company I idelilc :md Glmr:utly IMLIIMICe Cndenrritcrs, InC. I'ouer ul'.Allorury Nu. 20567 Certifirme No. IN11MA .ALL NII 5 111"I,IIPSI! IllI S I-Ialt SLuh ;ud SurCI'. C'. nil :mo I, a nnpnl.nlon dohonJLr IIIC LIN r 'I Ills Slalc nl Ary Park, uad Ih.0 SI P,1LtI I II :mJ Ahomy In.m ill,- ( 1lnnam v_ I':ud GI Idh,t1 Invlrao_ ( Ill p,utI aL L l o1. 1'eui VIIICt nLtI1'J I J � (.mlp:nn .I2 Cot 1,11 '11ol, Jule It2 I tit! c, 1 lack[ Ihr hoc. n I K AreC a IA unlC4it,I uJ III:i I 11110 i ;nee'. F111C111 aId (iu IeLln (\,nlp:ult I i,Itrn i:.I❑ I I t)I IIIJ/Ld allay: he Inl1, Il IhL `o nC a Alan_ Iwld..uld hu 1� r llA .lad r u:ilAIIII` a II a ('nln I1 n II I t I 1111u11 de c nlLalll/:a and.I I I u IL S1 IN fll' I10.Id_Z I 1 11 Ide11lA onJ 1 iu LI LInn In.,I 11L; i'n rII 1141.. m Cul']�9I IIaI1 lull uI'i IIIII Cd - IInJL1 dr Il,, oI �hc Saar ni NN IrO r_vI rr 1 m ,/r rnL �Ar '(-, mlpr .Ind Ih I da ('omp.uncN J.r u +rIII,I ';u nIIII n Id appnlnl Courtney T. Peterson.. Leon B. Dartois, James S. Rosulek, J. R. Richards, Douglas J. Rothey, Susan J. Rawson and Cynthia M. Bumett Denver Colorado of It, ('ilv ut . Slate - - lhelr trucand CIfill :AItomccl zl-io-LeeL cac II nl 111CH ;c 1:111A 1 le IcilF 1 toile I'inlu ,Ili I n: l'<d :d o e- In oRJI ili n,lnte'e HIeh lo. Imd to Al, Ile. Sad uud aCil ed can<:md L111 NIALk. un1111tidn1_'�. Can f:Iat tlla tIlhu ICInIJo iiulrnnl, II in Iil Il arte In4:c I n :IC i111f OI I QI111),UI C, in 111CiI ho. I I IC C . ut Cu. It I an lu irl IIIC II I II iK ut pro I I II I_ a9l.m to Lt 11 1C pa UIIILIII,n C,1IL 1L I, IlIIII a )Io in'_' nI Lu I'I I I I, •.li n^_ I'IIndN I11[ mldart 1 3, mCs rcuui1Cd VI' pLr'nillid w I I n .Id ion. ,I pl oa.. ti i.I.... 'WCd I,V bllc. IN I I'NEY, VV IER]((1F.Ih, (-..Inlparie' h ICL caucd rhl' C11CL1I111CN to he "tr""d and'Naha Ill, Ist LLn nt December I999 Scahuard Surely Company United States Pidelihand (lluaranh Company .St. fail It h e and Marine Insurance Company Iidelih and Guaranty Insurance Contpam SI. I'ald Guardian Insurance Cmnpanv Fidelity and Guar:mh Insurance Cndenrriters, Inc. St. I mi)lucult lnsura.Ice(nntpall tit 927 y 1 t'w ? ceoaaa�a O ' wccatawt(n V .:�� l Ltls xr, . i N rues R- 1977 1 1951 Inlet P. Pnl\\lr. v.:, p1<.InCri e." 1 Stale nt Vlore :old �' �� C'II`: of R:dl hllule MICI TALL R_ NICKIIBIHL\, Ab 11vmnt Scacntry Cln Ihi. Ist___. dtw nl December I999, h.fe1'e nlc-:he underisnecl WIILCr_ persnndllr uppcnred IulI11 P. Phin:IC% and ?ail t Icl If_ \idid l �n. leilo eL t I... lai ed Ih, to h IhL \-u Pre Iu.nt and \mi hL tiLcmGI1 ICs Ile' filch- nl Surat Compnne, SI. Paul I Ire end Vl mne luwrmre (' nnlp.nll_ll. IlJ(In'll'h11lmtuunL;C.+nlpally S[I t III AtetLtul In urn (-o:nui",,..ila[St.ue'Ildelilc onl Glee 11M (lmtp:me_ Fi,Clill and t of anh n-nton I'nmp:ml_ IJ Idalh :n1,1 ( ; t I II II I urin r 1'11. ba N ut I's. iuu.:: nd IhX Ile .L:II II[I,Id I I ) I 111 11 11 TOiII,_ 111y:111111111 arc III' - VIIIIGLLe ",it' it .nJ f all l'.Iulc.l nil Ilal IPCI_ .u.'h. bJllr_ l II I'/Cd t It .u-...CCLI (1 111 n1'c IIil Ilb b 11111 e:I nl IhC puI'pu.L. I 1 tCin C0111JIIIN h_c ]i_^_ninl lIle n'It tCr of t11L t,�rlt I ll i�,rn III h 1 .Ir, a.. �luil .Iulhnrvcd u11ILet._ In N111ueY+VVhelul I.rcuuo nn ilonJ nI "IicI'll "'d Vle I' mmir ism plI Il.c I Ill , I Inh. nU Itli lit ('C.A ISV11 I ] OPOF.AI_A_ Cl"Ci + nllhi'IL' °1,2C' HI- 11 )l PIq.IC1 ti It Engineering Department 281 North College Avenue - PO Box 580 Fort Collins, CO0)22- (970)221-66056605 FAX (970) 221-6378 City of F� ot� PERMIT FOR EXCAVATION ON PUBLIC PROPERTY IN THE RIGHT-OF-WAY Minimum of 5 Working Days Required for Approval. Emergency Excavation Permits may be obtained next business day. pplicant: Fill out sections 1 — 5 only CityUse 1 ' IApplicant Name ❑ Company rilnc. I '- Address: �— City/State/Zip: / - ❑ Sub -Contractor: s 2. Phone' -'- Phone: `il/ /-L PyR Do both contractor and sub -contractor possess license & proper endorsement to work in the Public Right -of -Way? Yes _ No Is this a City project? —_ Yes If so, Project Manager's Name: Field Contact Name: 3. Excavation Address: Scheduled Start Date: Temp. Patch Date: Excavation Type: Open Cut: Excavation Size: Width Length _ Total Sq. Ft. Pavement Removed: Existing Surface Type: Asphalt _ Gravel Soil Purpose of Excavation: VE Phone: Final: Back Fill: Boring: Sq. Ft. Depth Concrete Grass Water Sewer Telephone Electric Gas Communications Other 4' Applicant is responsible to notify the following departments: ❑ Utilities - 700 Wood St., 221-6700 For coordination of new utilities with existing utilities ❑ Traffic - 625 Ninth St., 221-6630 For traffic control plan submittal and coordination of signalized Intersections. ❑ Parks (if applicable) - 413 S. Bryan, 221-6660 For work in the park system ❑ Parking - 210 E. Olive, 221-6617 For work downtown or at CSU ❑ Forestry - 413 S. Bryan, 221-6660 For trees, shrubs or other vegetation Mark box next to department after notification. Permit #: Approval Date: Expiration Date: 30 DAYS FROM APPROVAL Reviewed By: _ Review Date: _ Ede Development Project Name Fees: Application Fee: Non -Refundable Inspection Fee: $45.00/1000 ftz Pavement Impact Fee: ' x Permit Excavation ft2 x COW ftz 1 to 100 $ 3.50 101 to 500 2.50 501 to 3,000 2.00 over 3,000 1.50 ❑ Impact Fee Tripled if pavement is Less Phan 5 years Pavement Age: Sub -total Previous Payments Total Due: Date Paid: Cash Account # Check # $ Field verification of excavation size: Conditions: _; .. , .... oI� _ r Engineering Approval: i Date: J. Applicant has read this permit and agrees to abide by the City of Fort Collins Standard Plans and Specifications and to any ordinances, special conditions, restrictions, and regulations that may be imposed by the Department of Engineering. Applicant's Signature: t t = «� Date: ZI C Notify the Engineering Inspection Recorder at 221-6609 48 hours prior to any construction in the public right -of way. White - Engineering Yellow - Inspection Pink - Applicant Gold - Revenue EXHIBIT A Project Name: Fox Meadows II Project AKA: City Staff contacts: Development Engineer: Dave Stringer 281 N. College Ave. Fort Collins, Co. 80524 970 221- 6765 Construction Inspector: Lance Newlin 281 N. College 970 221-6605 970 222- 0854 Water utilities Engineer: Roger Buffington 700 Wood Street 970 221- 6854 Erosion Control Inspector: Bob Zakley 700 Wood Street 970 221- 6063 Traffic Operations: Street Closures: Transportation Planner: Forestry: Light & Power: Ward Stanford 625 Ninth Street 970 221 - 6615 Sly Mireles 625 Ninth Street 970 221- 6815 Kathleen Reavis 210 E. Olive 970 221- 6140 Tim Buchanan 281 N. College 970 221- 6361 700 Wood Street 970 224 — 6700 US West: Eric Handcock- 970 377- 6401 Development Construction Permit, Page 2/3 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: Normal work hours as allowed by City Muncipal Code 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plains, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the Aas-constructed@ plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and Development Construction Permit, Page 3/3 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP=s) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Applicant is required to obtain a Street Excavation Permit prior to the cutting of all existing City streets . Contact the Engineering Department, Chief Construction Inspector Lance Newlin for permit and associated fees Permittees acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manger Signature:_` _ ,r .. �� Date: Approval for issuance: City Engineer Approval L �f ate:—' (P rmit Issuance Date) F SUBMIT THE FOLLOWING ITEMS (Required for all projects): • $I/Z"x11" copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for Ill, of the pulik improvements to be constructed, In addition, include all private improvements that are required to be inspected by the City Construction Inspectors, This information must be submitted in the format shown on the attached farm titled "Project Quantities and Cost Estimate Shom" ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETINGi A construction coordination meeting to discuss plans and special requirements for your project, Is required for all development projects. The people required to aiaend the meeting are the Project Manager, Project Engineer, Developer, Architecv'Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend- List the peoples names and titles for those who will attend the pro - construction meeting; Name ^Title 1 ..a,i rY,SV 1fn �l oesacs. �..N1.�M Jr-56,� L�1M0 �4R[uaP.6 N1A Nerwc.ro.i 4 9 'd 7E8EN E9L0EE169E Nd89E OOOZ OCT-10-2000 TUE 03:16 PM CFO ENG, FAX NO. 9702216378 P. 02 DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (w1gq) For Qty use only: Application Number: i42 -W App1ication Date:_ /D - /O - Zoos Permit oppNeallon fee: A '1212. er0 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engirt at 221-6750, 3. Subnut the Application and pay the Application Pee at the fee at the Engineering counter at 281 No. College Avenue, PROJECT INFORMATION: Project Name (as approved by the City): Fm McACoJS APA.art+.CUCti Project AXA. (Marketing name if different from Projeet Name): Project Location: 3anc SwV" T+Bf0.ti\NG 0.0be Yc 31V7 So c% 7-'M%5gA\ws1L Rona gam CO g05 a5 Property Owner(At the time of this permit issuance): Name Addrw Phone Office; 30'6 - Ccllphonor Fax number: Email: Applicant/Project Manager (no primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement fbr this project): �+ Name: Mrtcr �go(sHi - Marwaw. 4DNST0.vC T\ON, 1Ne , Address: w6-6 ,.o. AaMoogN pve„ sw cvs :sp e. wpw-zwooeh, cc soon o Phone number(s); Office: 3e8- ,1A a o Callphone; Fax number; _,tea - -t Pa - on ss Email: .H�aoP.N�@ e.,ar �.+-�uNrc.cc�N l d VEH 'CN £9L0N H H N L9 E 000E '71 100 OCT-10-2000 TUE 03:16 PM OR ENG, FAX NO, 9702216378 P. 03 Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person responsible for the design of this project, responsible for certification that improvements are t_ constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providintjas-constructed plans): Address:_ �pA415 1J. a^4o A Aga., 5.vm 1ao Phone nwnber(s); Office: _. a03-gy9 -\Li 1 Cellphone: Fax number: aoa_-,Sq - Maty Email: Professional License Number; a s�o aa ,e%q -11% Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement -add additional names below): Name: MAac 'An"tooAc" • F,k gout CouJ..ay L.P. Address: 1\1,5 6. �cNNaHwaya, Su�T? W'a, Dativax,Cn $a1\p Phone nutnber(s); OIDce:__goa-1aa Sorg Cellphone; Fax number; Email: General Contractor Me contractor in overall charge of the public infrastructure construction): Name: CoNars�..ac\oti, \Na.. Address:, 333 .. �J. k1+•+OOtN A�:., Su%V& a2s, t^rlsyc�&? Cc1 go\\p Phone number(s); Oltice: o a - Cellphone: Fax number: ao-a--1g3-0-153 Email: MP9-0g1n" d MWyaa6J-(pNic, cov\ If you have no General Contractor, list all other contractors below. Grading contractor; Name: Address; Phone itwnbsr(s); Office; Cellphone; Fax number: Email: Utility contractor; E d VEEE CN E9iMIHE Nd 9:E OCK dl 00 OCT-10-2000 TUE 03:16 PM CFO ENG, FAX NO, 9702216378 P. 04 Name: Address _ Phonenumber(s): Office: Cellphone: Fax number: Email: Concrete contractor for flat work: Name: Address: _ Phone number(s): office; Celiphone: Fax number: Email: Concrete contractor for structures: Name: Address: Phone number(s): Office: Csilphone: Fax number Email: Paving contractor, Name: Address: Phone number(s): Office: Callphons: Fax number: Email: Landscape contractor: Name: Address: Phone number(&): Office: Cellphone: Fax number: Email: Other contractors and parties involved in the project: V 'd MPON EcLONL'M NL9:E Mul 11 100 OCT-10-2000 TUE 03:16 PM CFO ENG, FAX NO, 9702216378 P. 05 SUBMIT THE FOLLOWING ITEMS (Required for all proisets)- • 81/2"xl I" copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for All of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors, This information must be submitted in the &=at shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked)- 0 Traffic control plan(®) for the project El Proposed haul routes shown on a City map to Shop drawings o Other CONSTRUCTION COORDINATION MEETING; A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting; Name Title � is o�.°wctwa 4 �1Q.C�8O.6 N1P rJL , uiar3A�G.r'�O�% 9 'd VM 'ON E9LCH LEOE k 89:E OCOZ Zl'00