HomeMy WebLinkAboutHAR SHALOM MINOR SUB - Filed OA-OTHER AGREEMENTS - 2003-11-19CONGREGATION BAR SHALOM SUBDIVISION
AMENDMENT AGREEMENT N0.1
THNDMENT AGREEMENT, made and entered into this 0 ot/-
day of -rG'c , of 199.3, by and between the CITY OF FORT COLLINS,
COLORA 0, a municipal corporation, hereinafter referred to as the
"City" and CONGREGATION HAR SHALOM, a Colorado non-profit religious
corporation, hereinafter referred to as the "Developer," is an
amendment to that certain Subdivision Agreement dated the 15th of
June, A.D. 1981, by and between the City and the Developer,
hereinafter referred to as the "Development Agreement."
WHEREAS, the parties hereto previously executed the
Development Agreement; and,
WHEREAS, the parties are presently desirous of modifying the
Development Agreement;
NOW, THEREFORE, in consideration of the promises of the
parties hereto and other good and valuable consideration, the
receipt and adequacy of which is hereby acknowledged, the parties
agree as follows:
Subheading 2. Special Conditions; section D. Streets shall be
modified to delete the sentence " See Exhibit "A"." and add the
following paragraph:
The Developer and the City agree that the Developer shall
complete the design and construction of the curb and
gutter with related pavement improvements along the
development frontage of Drake Road prior to the issuance
of the next building permit for this development.
Notwithstanding the foregoing, the Developer shall have
the option to postpone the construction of said
improvements and obtain issuance of a building permit
following the escrow of funds to be deposited with the
City in the form of cash, bond, nonexpiring letter of
credit or other form of City approved security sufficient
to guarantee completion of the Developer's share of said
improvements. The escrow amount shall be 1500 of the
estimated cost to complete said improvements (see
estimated cost on attached Exhibit "C"). However, said
improvements shall be designed, constructed and accepted
by the City prior to the issuance of a certificate of
occupancy.
Exhibit "A"; subheading 3. Schedule of street improvements to
be installed out of sequence; paragraph shall be deleted and
replaced with the following paragraph:
Completion of the Drake Road curb, gutter and pavement
improvements along the frontage of this development shall
be completed in accordance with the provisions in
Subheading 2.D. of this Agreement.
Except as herein modified, the Development Agreement shall
continue in full force and effect. This Agreement and the
Development Agreement constitute the entire understanding of the
parties.
IN WITNESS WHEREOF, the parties hereto have set their hands
the day and year first above written.
ATTEST::
O Lt • -
CITY CLERK
APPROVED AS TO CONTENT:
�z � ng
Director of Engineerlg,
APPROVW) AS TO FORM:
ity Attorney
THE CITY OF FORT COLLINS, COLORADO,
a Municipal Corporation
BY ,G//%12
itY M nag
DEVELOPER:
CONGREGATION HAR SHALOM, a Colorado
non-profit religious corporation
Neil Sherrod, President
ATTEST:
By: l
Gary Sp vak, Secretary (corporate seal)
STEWART&ASSOCIATES
Consulting Engineers and Surveyors
August 18, 1993
Mr. Mike Herzig
Development Coordinator
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado
Dear Mike:
80522
Re: Han Shalom Minor Subdivision
EXHIBIT "C"
I have calculated the cost to install curb and gutter along the frontage
of the Har Shalom Minor Subdivision to be Five Thousand Eight Hundred Seventy —
Two Dollars ($5,872.00). This is based upon the following estimated costs:
1. 258 L.F. Curb and Gutter at $11.00 per L.F. $2,838.00
2. 212 S.F. Concrete Driveway at $3.50 per S.F. 742.00
3. 57.3 S.Y. of 10—inch Depth Asphalt at $40.00
per S.Y. 2,292.00
Total $5,872.00
Please call if you have any questions regarding this estimate.
Sincerely,
Phillip I. Robinson, P.E. & L.S.
Vice President
jrr
James H. Stewart
and Associates, Inc
-
103 S. Meldrum Street
P.O. Box 429
Ft- Collins. CO 80522
303/d82-9331
Fax 303 182-9382