April 2, 1980
Mr. Stephan McMillan
Chism homes Inc.
4,730 South College Ave.
Fort Collins, CO 80525
RE: Four Seasons Second Filing P.U.D.
Storm Drainage, Project No. 1377-020
Dear Mr. McMillan:
The following is a letter report addressing the storm drainage analysis
for Four Seasons Second Filing, a P.U.D. located southeast of the inter-
section of Horsetooth Road and Shields Street in Fort Collins, Colorado.
This report proposes a series of improvements which will provide groper
intermediate storm water runoff management. This report is closely cor-
related to a drainage report previously done by our office for Four
Seasons P.U.D. First Filing in January 1979. It conforms to the storm
drainage criteria of the City of Fort Collins. All calculations pertain-
ing to this letter report are available on request from this office.
In the quarter -section in which Four Seasons Second Filing lies, the only
improved area is Four Seasons First Filing (see shaded area, 7.xhibit No.
1). The First Filing has existing detention ponds for managing most of
its associated r_roff. The runoff from basin L-de (see Exhibit No. 1)
flows from the first filing to the second filing through Tradition Drive.
As stated in the previous drainage report the existing topography defines
two drainage basins (shown on Exhibit No.l). n e southern basin does not
contribute to the runoff picture of this filing and is not considered in
this report. me northern basin topography is comprised of gently roll-
ing features basically sloping from west to east.
The City of Fort Collins requires an improved site to limit its runoff to
the amount rasuliing from a 2-year frequencv storm occurring while the
sits is in its natural state. To accomplish this, it is usually neces-
sary to design a detention pond with a total storage capacity of the msx-
imum difference between the 100-year storm runoff from the developed area
and the 2-year historical flow. An outlet structure is designed to limit
the flow to the 2-year historical runoff va'_ue.
Mr. McMillan
April 2, 1980
Page 2
The amount of storm water runoff for the area, individual basins and
streets was determined by the rational method. This procedure equates
the design peak flow to the total area, amount of rainfall on that area,
and a multiplier that is determined by the physical characteristics of
the area under study. The rational method is commonly employed in the
design of barrow ditches and storm sewer systems. The bulk of the pro-
cedures, methods and numerical constants were obtained from the Urban
Storm Drainage Criteria Manual, published by the Denver Regional Council
of Governments. The rainfall intensity duration curves used in this
report were developed by the City of Fort Collins Engineering Department.
The approach taken to develop a drainage plan for Four Seasons Second
Filing was effected by the offsite area generally to the west, south, and
north of the proposed development site. The proposed site was divided
into two sub -basins A and B (see Exhibit No. 1). Sub -basin A outlets to
the south and sub -basin B outlets to the east. In order to control the
outflow generated by these sub -basins, it is proposed that southern and
eastern interim detention ponds (see Exhibit No, 1) be built. A final
detention pond (see Exhibit No. 1) would be built as further development
would require. The eastern temporary _pond volume _is sized from the
combined areas of sub -basins B,and_L-4e. The outfall of this pond, 2.15
---- -- ---- --- ---
cfsl is the 2-year historical outfall of these combined areas and also
-- - --
includes the autfaIT -from the greenlie2t -area- -1ne-C een f6e-first and second
filings. The onsite and offsite flows are to be routed to the eastern
pond via a shallow trapezoidal channel (see Exhibit No. 1). The_southetn
temporary pond will provide adequate detention -for _ yb-basin A and _pro-
vide an overflow weir topass the-_offsite historical 100-year flow. The
outfall from sub -basin A, 1.81gf�s, _had no suppleme it yr flowrto amass.
The onsite and offsite flows will be routed via shallow trapezoidal chan-
nels to the southern pond. Both temporary ponds will be bermed to facil-
itate the required volumes. Both ponds will also have trapezoidal chan-
nels daylighting to natural ground from their outfalls.
The drainage patterns of the second filing are modified from our Preli--i-
nary Drainage Study, dated January, 1979. By causing the cul-de- sacs of
the Four Seasons Second Filing to drain to the south and west into Cen-
tury and Michie Drives instead of draining into the green belt area
between the first and second filing. This causes an increased flow in
Century and Michie Drives, but does not exceed the Fort Collins street
inundation criteria.
This design will satisfy hydrologic considerations and provide adequate
detention volumes until further development requires the proposed final
detention pond to be built. It is recommended that the storm water run-
off be routed as shown on Exhibit No. 1 and the detention ponds be sized
according to the detention volumes shown on Exhibit No. 1.
Mr. McMillan
April 2, 1980
Page 3
Please feel free to contact us with any comments or questions.
Very truly yours,
M 6 I, INC.
Jim R. Allen
E.-L.S.
Robert Sutter—
architects 'planners
drake office center_ . 333 w. drake road
ft. collins, colorado 80526 (303) 223 - 5198
City of Fort Collins
Department of Community Development
P.O. Box 508
Fort Collins, Colorado 80522
Subject: M-2 Area PUD of Four Seasons Devel
Dear Sirs:
May 15, 1979
nient, Fort Collins, Colorado.
The intention of this letter is to present the required written documentation for
preliminary PUD submittal which has not been included on the site plan submitted
with this letter. This information shall include the considerations allowed in
developing the design layout as presented and the advantages gained in this par-
ticular PUD. Additional information as to the site conditions and suitability
for development, drainage, utilities, ownership, phasing, ?tc. shall also be
provided.
This information shall be divided into the following categories: Objectives of
this PUD, Design Analysis, Design Development, Advantages of this PUD, Develop-
ment Information, and Summary.
I. Objectives of the PUD
The main objective of the PUD is to provide a harmonious development
both within and to the exterior elements that provides maximized visual
and functional comfort that is also economically feasible for development.
Maximum density should be. realized and yet an aesthetic blend most be
accomplished compatible with other surrounding elements in the
master plan.
Maintenance free living, as much as possible, is a goal to be met.
Therefore a patio home and townhome concept.will be developed since
these concepts are both compatible with maintenance free living as well
as the seven to eight unit per acre density allowed for this portion of
the master plan.
II. Design Analvsis
The location of the property is fronting Horsetooth Road on the north
of the Four Seasons master plan. The Four Seasons master plan is
located at the southeast. corner of West Horsetooth Road and South Shields
Street. The M-2 site is 10 - acres in size.
City of Fort Collins
M-2 Area PUD of Four Seasons
May 15, 1979
page 2
Natural drainage on the site is generally to the east at approximately
one percent. Detention will be accomplished in an over lot system
in the green belt areas and parking areas.
Sanitary sewer, water, natural gas, electric power, and telephone will be
available from both the north and south boundaries of the site.
Soil conditions are suitable for this type of development although the
water table elevations will limit buildings_ to slab on grade, crawl space,
or garden level. A soils investigation has been conducted on the site by
Empire Laboratories of Fort Collins, Colorado.
Fire protection will influence the configuration of buildings and auto
circulation systems on the site to provide for the protection of life
and property. Building separations will be 10'-0 '' to 15-'0" minimum
and all building sides will be within 150'-0" of fire truck access.
Hydrants will be strategically planned and located for adequate service
and coordination with the master plan.
No curb ruts will be utilized on Horsetooth Road and landscaping will be
utilized to buffer housing from both noise and traffic generated by this
traffic artery. Separation of pedestrian and auto traffice on the site
is considered a major design requirement.
Building orientation should be such as to prevent, as much as possible,
direct views between buildings. Landscaping can be utilized to further
protect, buildings from direct views between structures.
II1. Desiqn Development
It is desired to provide as many as possible patio homes in the total
mix of housing on the site and still maintain maximum density. Town-
houses will then be developed to supplement patio homes and provide for
more effective utilization of space. A total density of seven to eight
units per acre is to be achieved.
Patio home lots will be located at the east end of the property for com-
patibility with the low density housing located there. Townhomes will
then be developed at the west of the Project where they will be more
compatible with future higher density housing and commercial development
to be located in the west of the master plan.
Garages for two automobiles will be provided for the patio homes. The
townhome area will be provided with detached single car garages or car-
ports —one per unit. Additional parking in the townhome area will be
in open parking lots.
City of Fort Collins
M-2 Area PUD of Four Seasons
May 15, 1979
page 3
Street width in the patio home area will be 26'-0" wide. It is felt
that due to the numbers of curb cuts and perpendicular parking on both
sides of the streets in this area, parallel parking on either side is
unlikely to occur in most areas. A wider street would only be providing
more driving lanes. The narrower street, because of the unlikelyhood
of parking on it, would still provide the proper widths necessary for
adequate fire protection.
All patio homes will be platted into subdivided lots. It is anticipated
that townhome areas will be subdivided also.
An Architectural Control Committee will be established to control the
aesthetic: appearance of buildings erected on marketed lots. Homeowners
agreements will provide for maintenance of structures which are not respon-
sibly maintained by the owners. The Homeowners Association will also
provide for the upkeep of paved areas not dedicated to the City of Fort
Collins as well as common green belts.
IV. Advantages of this PUD
The mix of housing on this property and its configuration is compatible
with other elements of the master plan for Four Seasons.
The provision of private roads and parking minimizes the effect of curb
cuts on the public streets surrounding the parcel.
Parking has been generally enclosed throughout the project to minimize
the impact of open parking lots and enhance the marketability of the
project.
Building set -backs at the streets have been made irregular to minimize
monotony of street scape.
Major open spaces have been provided for the higher density areas of the
site to separate structures and provide recreation for the higher concen-
trations of population.
Separation of pedestrian and automobile has been maximized
Fire protection requirements have been met.
Direct overlook between structures has been minimized.
Maximum parking has been allowed.
Double loading of most utility mains.
V. Development Information
It is anticipated that the project will be built over the next two to four
year period. Phasing of the project is indicated on the drawings with
City of Fort Collins
M-2 Area PUD of Four Seasons
May 15, 1979
page 4
Phase One beginning in the fall of 1979, Phase Two in the spring of 1980,
and Phase Three in the fall of 1980 or spring_ of 1981. At this date it
is anticipated that the present owner of the site, Chism Homes, Inc., will
build out the entire site.
Market demands will dictate the exact mix of two and three bedroom units
to be built in both the townhome and patio home areas. Parking is pro-
vided to meet any combination since the maximum (two spaces/unit) is
provided.
Building enveolpes are intended to indicate a close proximation of build-
ing coverage required but may vary slightly upon determination of market-
ing demands as to two and three bedroom mix. Townhomes will be two
stories in height. Patio homes will be ranch, garden level, or loft type
structures.
The character of the PUD will be established in a contemporary style with
wood stud construction and possibly some masonry treatment. Landscaping
will be used to accentuate and enhance the visual impact of the site and
structures and soften parking areas and structures. Roof lines will be
pitches and somewhat varied.
The following is a summary of site information and data:
Total Area of PUD 10.0 ± a. 100%
Number of Units
35 Patio Homes
40 Townhomes 75 units
Area Covered by Building Envelopes
35 P.H. & garages x 1730 + s.f. 1.4 + a.
40 T.H. & garages x 800 - s.f. 79 a.
275 { a. 25%'
Area Covered by Auto Circulation/Drives
Townhome parking & circulation, .7 f a.
Patio home parking & circulation .9 - a.
Total paving less walks 1.6 a 16%
Total Remaining Area to Commons
Based on Building Envelopes not
Coverage 5.9 + a. 59%
Total Area to Active Recreation Space 1.5 ± a. 15%
City of Fort Collins
M-2 Area PUD of Four Seasons
VI. Summary
May 15, 1979
page 4
This PUD provides for a maintenance free, harmonious, and pleasant living
atmosphere and it will blend with surrounding elements of the Four Seasons
master plan. It is efficiently and economically composed.
We hope that these comments will serve to explain the approach and reason-
ing utilized in the development of this submitted plan. We look forward
to presenting the plans to the Planning Board and Fort Collins City
Councl.
Cordially�—�f'
Robert A. Sutter, A.I.A.
Copy: Chism Homes, Inc.
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
September 23, 1985
Mr. Dan Wheeler
PO Box 519
Greeley, CO 80632
Dear Dan,
As per our conversation today, I am writing this letter to confirm the
conditions by which I will allow the Second Phase of Four Seasons`jio be
heard At the September 25th Meeting of the Planning and Zoning Board.
Because one of the parties (Ron Strahle) who owns the land to the east and
from whom you are seeking an easement is out of town and unable to be
reached and because I have a copy of a letter agreeing to work out the
easement, I will allow the item to be heard with the following two
conditions. Before the City will file the project the easement must be
submitted as well as the documentation for handling the street name
changes. This must be accomplished within 30 days from the date of this
letter. Because the detention pond cannot be built without this easement,
you will be unable to get more than 35 building permits for Four Seasons
Fifth both phases, until the storm drainage improvements are completed (as
per the Development Agreement).
Please see that this is accomplished in a timely manner.
Sincerely,
%
Bonin e Tri pol i
Development Coordinator
CC: Dave Stringer, Chief Construction Inspector