Loading...
HomeMy WebLinkAboutFOUR SEASONS PUD EIGHTH - Filed GC-GENERAL CORRESPONDENCE - 2003-11-04JUN-23-92 TUE 9:02 THE GROUP INC FAX NO, 3032233529 P,02 FOUNDATION II Consulting ENGINEERING 1Bngineers, Ltd. June 1, 1992 Commission No. 1204-08-04-03 Desyn Homes 401 West Mulberry Fort Collins, CO 80521 Gentlemen: We have inspected the structure at Lot 21, Four Seasons Eighth subdivision (3764 Century Drive), a subdivision of Fort Collins, Colorado. This inspection was performed on May 19, 1992. The elevation at the lowest point of access, which is the window well located on the north end of the east aide of the house, is a minimum of three (3) feet four (4) inches above the elevation of the nearest point of the..,(q(jjalr,ent drainage channel. If you have any qu Respectfully, 2 ` s 23341 Ay �1.h Ke in W Patt rson, v%i'ej¢'l.1 FOUNDATION ENGINEERING, L�fSN Ul KWP/sbe 1. ING ENGINEERS, LTD. 100 East3rd Street 0 Loveland, Colorado 80537 9 (303) 663-0138 06-26-92 02:02 PM FROM FOUDATION ENG. TO 3032216239 POI FOUNDATION 11 Consulting ENGINEERING Engineers, Ltd. A-rrvo' L-:A- j-ou 1-1w.ta5 June 26, 1992 Commission No. 1204-08-04-06 Desyn Homes 401 West Mulberry Fort Collins, CO 80521 RE: Lot 21, Four Seasons Eighth (3864 Century Drive) Gentlemen: We have reviewed the top of the foundation elevation at the residence under construction at the above referenced location. It is our opinion that the top of the foundation is at 5073.5 and the the lowest window well is 5071.5 feet. The benchmark is 5066.6 and is the northeast bottom bolt at the southeast corner of Tradition and Dennison. It is our opinion that these elevations conform with the requirements of the grading plan. If you have any questions, please call. Respectfully, Kevin W. Patterson FOJSPaTION ENGINEER Nt=, Gm T ENGINEERS, LTD. KWP/sbsfj- •c 100 East 3rd Street 0 Loveland,Colorado60537 • (303)663-0138 126 P01 Deig do & Delgado CONSULT N7S and LAND SURVEYOR$ M MOVA p I 1313 COULTER STREET, FORT COLLINS. COLLO ADO 80524 TELEPHONE 224.5079 January 2,1992 Mr. Glen Schlueter Civil Engineer Storm Water Utilities City of Fort Collins Fort Collins, Colorado.80522 Post -It'" brand fax transmittal memo 7f3TJ. #of Pope. . From > <4v . Cm x Co. C: GYi/ic C'O': da✓ Dapt. room, e ,K,,.�,'3 G 2g L Foxka�� Fex0 Re: Four Seasons, Eighth Filing Subdivision Conformity of Detention Pond, Dear Mr. Schlueter; The following is being submitted to you, as certification on the detention pond in Four Seasons, Subdivision. Submitted herewith is a red lined copy of sheet 4 of 10, Grading and Drainage Plan- Four Seasons, Eighth Filing Subdivision, of the engineered plans from Stewart and Associates, Consulting Engineers. The plan sheet shows the existing elevations that were taken by Delgado & Delgado, Consultants of Fort Collins, on the 27th day of December 1991. The construction of this pond was found to be consistent and within acceptable tolerances as specified in the approved plan sheet as submitted. Critical elevations were checked as follows: (1) Culvert sidewalk flowline. Plan = 65.76 Final = 65.76 (2) Flowline outlet pipe. Plan = 66.20 Final = 66,20 (3) Top of berm. Plan = 69.7 Final = (4) Spillway overflow elevation. Plan = 69.5 Final = (5) Contour elevation outline Plan = 67.0 Final = All other elevations as checked are with the approved plans as submitted itted; rete Delgado' ado & Delgado Colorado Registered Professionals 69.7 to 70.20 67.0 consistent and to the city. 10725 in accordance FOUNDATION II Consulting ENGINEERING Engineers, Ltd. September 24, 1992 Commission No.: 1204-08-12 02 Desyn Homes 401 West Mulberry Fort Collins, Colorado 80521 Gentlemen* We have inspected the structure at Lot 20, (3902 Century Drive), Four Seasons Eighth Filing. a subdivision of Fort Collins, Colorado. This inspection was performed on September 23, 1992. The elevation at the lowest point of access, which is the window well located on the west end of the south side of the house, is a minimum of one foot ten inches (1'10") above the elevation of the nearest point of the adjacent drainaqe channel. If you have any ques Res�.i] lY: Kevin W. Patterson FOUNDATION ENGINEE KWP:sbs ;i";p4Pase feel free to call ING ENGINEERS, LTD. 100 East 3rd Street • Loveland, Colorado 80537 • (303) 663-0138 Delgado & Delgado CONSULTANTS and LAND SURVEYORS G. Pete Delgado, L. S. 1313 COULTER STREET, FORT COLLINS, COLORADO 80524 January 2,1992 Mr. Glen Schlueter Civil Engineer Storm Water Utilities City of Fort Collins Fort Collins, Colorado.80522 Re: Four Seasons, Eighth Filing Subdivision Conformity of Detention Pond. Dear Mr. Schlueter; TELEPHONE 224-5079 The following is being submitted to you, as certification on the detention pond in Four Seasons, Subdivision. Submitted herewith is a red lined copy of sheet 4 of 10, Grading and Drainage Plan- Four Seasons, Eighth Filing Subdivision, of the engineered plans from Stewart and Associates, Consulting Engineers. The plan sheet shows the existing elevations that were taken by Delgado & Delgado, Consultants of Fort Collins, on the 27th day of December 1991. The construction of this pond was found to be consistent and within acceptable tolerances as specified in the approved plan sheet as submitted. Critical elevations were checked as follows: (1) Culvert sidewalk flowline. Plan = 65.76 Final = 65.76 (2) Flowline outlet pipe. Plan = 66.20 Final = 66.20 (3) Top of berm. Plan = 69.7 Final = (4) Spillway overflow elevation. Plan = 69.5 Final = (5) Contour elevation outline Plan = 67.0 Final = All other elevations as checked are with the approved plans as submitted Re c ly fitted; G / ete Delgado elgado & Delgado Colorado Registered Professionals 69.7 to 70.20 69.5 67.0 consistent and to the city. 10725 in accordance 51 EWART&kSSOC[ATES Consulting Engineers and Surveyors August 5, 1991 Ms. Susan Hayes Storm Water Utility City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Susan: I received, from Jon Estabrook of Odau.Cerlstruction, a price of Five Thousand One Hundred Fifteen Dollars ($5115.00) to perform the required erosion control procedures for the Four Seasons Eighth Filing. The price to reseed the maximum stripped are of 250,000 square feet at a price of 0.012 Dollars ($0.012) per squ re foot would be Three Thousand Dollars ($3000.00). Please call if you need more information (In this project. Sincerely, Phillip Robinson, P.E. & L.S. Vice President jrr James H. Stewart and Associates, Inc. 214 N. Howes Street PO Box 429 Ft. Collins. CO 80522 303i482-9331