We have inspected the structure at Lot 21, Four Seasons Eighth
subdivision (3764 Century Drive), a subdivision of Fort Collins,
Colorado. This inspection was performed on May 19, 1992.
The elevation at the lowest point of access, which is the window
well located on the north end of the east aide of the house, is a
minimum of three (3) feet four (4) inches above the elevation of
the nearest point of the..,(q(jjalr,ent drainage channel.
If you have any qu
Respectfully, 2 `
s 23341
Ay �1.h
Ke in W Patt rson, v%i'ej¢'l.1
FOUNDATION ENGINEERING, L�fSN Ul
KWP/sbe
1.
ING ENGINEERS, LTD.
100 East3rd Street 0 Loveland, Colorado 80537 9 (303) 663-0138
06-26-92 02:02 PM FROM FOUDATION ENG. TO 3032216239 POI
FOUNDATION 11 Consulting
ENGINEERING Engineers, Ltd.
A-rrvo' L-:A- j-ou 1-1w.ta5
June 26, 1992
Commission No. 1204-08-04-06
Desyn Homes
401 West Mulberry
Fort Collins, CO 80521
RE: Lot 21, Four Seasons Eighth (3864 Century Drive)
Gentlemen:
We have reviewed the top of the foundation elevation at the
residence under construction at the above referenced location.
It is our opinion that the top of the foundation is at 5073.5 and
the the lowest window well is 5071.5 feet. The benchmark is 5066.6
and is the northeast bottom bolt at the southeast corner of
Tradition and Dennison. It is our opinion that these elevations
conform with the requirements of the grading plan.
If you have any questions, please call.
Respectfully,
Kevin W. Patterson
FOJSPaTION ENGINEER Nt=, Gm T ENGINEERS, LTD.
KWP/sbsfj-
•c
100 East 3rd Street 0 Loveland,Colorado60537 • (303)663-0138
126 P01
Deig do & Delgado
CONSULT N7S and LAND SURVEYOR$
M MOVA p I
1313 COULTER STREET, FORT COLLINS. COLLO ADO 80524 TELEPHONE 224.5079
January 2,1992
Mr. Glen Schlueter
Civil Engineer
Storm Water Utilities
City of Fort Collins
Fort Collins, Colorado.80522
Post -It'" brand fax transmittal memo 7f3TJ. #of Pope. .
From
> <4v .
Cm x
Co.
C: GYi/ic C'O': da✓
Dapt. room, e ,K,,.�,'3 G
2g L
Foxka��
Fex0
Re: Four Seasons, Eighth Filing Subdivision
Conformity of Detention Pond,
Dear Mr. Schlueter;
The following is being submitted to you, as certification
on the detention pond in Four Seasons, Subdivision.
Submitted herewith is a red lined copy of sheet 4 of 10,
Grading and Drainage Plan- Four Seasons, Eighth Filing
Subdivision, of the engineered plans from Stewart and
Associates, Consulting Engineers.
The plan sheet shows the existing elevations that were
taken by Delgado & Delgado, Consultants of Fort Collins,
on the 27th day of December 1991.
The construction of this pond was found to be consistent and within
acceptable tolerances as specified in the approved plan sheet
as submitted.
Critical elevations were checked as follows:
(1) Culvert sidewalk flowline.
Plan = 65.76 Final = 65.76
(2) Flowline outlet pipe.
Plan = 66.20 Final = 66,20
(3) Top of berm.
Plan = 69.7 Final =
(4) Spillway overflow elevation.
Plan = 69.5 Final =
(5) Contour elevation outline
Plan = 67.0 Final =
All other elevations as checked are
with the approved plans as submitted
itted;
rete Delgado'
ado & Delgado
Colorado Registered
Professionals
69.7 to 70.20
67.0
consistent and
to the city.
10725
in accordance
FOUNDATION II Consulting
ENGINEERING Engineers, Ltd.
September 24, 1992
Commission No.: 1204-08-12 02
Desyn Homes
401 West Mulberry
Fort Collins, Colorado 80521
Gentlemen*
We have inspected the structure at Lot 20, (3902 Century Drive),
Four Seasons Eighth Filing. a subdivision of Fort Collins,
Colorado. This inspection was performed on September 23, 1992.
The elevation at the lowest point of access, which is the window
well located on the west end of the south side of the house, is a
minimum of one foot ten inches (1'10") above the elevation of the
nearest point of the adjacent drainaqe channel.
If you have any ques
Res�.i] lY:
Kevin W. Patterson
FOUNDATION ENGINEE
KWP:sbs
;i";p4Pase feel free to call
ING ENGINEERS, LTD.
100 East 3rd Street • Loveland, Colorado 80537 • (303) 663-0138
Delgado & Delgado
CONSULTANTS and LAND SURVEYORS
G. Pete Delgado, L. S.
1313 COULTER STREET, FORT COLLINS, COLORADO 80524
January 2,1992
Mr. Glen Schlueter
Civil Engineer
Storm Water Utilities
City of Fort Collins
Fort Collins, Colorado.80522
Re: Four Seasons, Eighth Filing Subdivision
Conformity of Detention Pond.
Dear Mr. Schlueter;
TELEPHONE 224-5079
The following is being submitted to you, as certification
on the detention pond in Four Seasons, Subdivision.
Submitted herewith is a red lined copy of sheet 4 of 10,
Grading and Drainage Plan- Four Seasons, Eighth Filing
Subdivision, of the engineered plans from Stewart and
Associates, Consulting Engineers.
The plan sheet shows the existing elevations that were
taken by Delgado & Delgado, Consultants of Fort Collins,
on the 27th day of December 1991.
The construction of this pond was found to be consistent and within
acceptable tolerances as specified in the approved plan sheet
as submitted.
Critical elevations were checked as follows:
(1) Culvert sidewalk flowline.
Plan = 65.76 Final = 65.76
(2) Flowline outlet pipe.
Plan = 66.20 Final = 66.20
(3) Top of berm.
Plan = 69.7 Final =
(4) Spillway overflow elevation.
Plan = 69.5 Final =
(5) Contour elevation outline
Plan = 67.0 Final =
All other elevations as checked are
with the approved plans as submitted
Re c ly fitted;
G / ete Delgado
elgado & Delgado
Colorado Registered Professionals
69.7 to 70.20
69.5
67.0
consistent and
to the city.
10725
in accordance
51 EWART&kSSOC[ATES
Consulting Engineers and Surveyors
August 5, 1991
Ms. Susan Hayes
Storm Water Utility
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
Dear Susan:
I received, from Jon Estabrook of Odau.Cerlstruction, a price of
Five Thousand One Hundred Fifteen Dollars ($5115.00) to perform the
required erosion control procedures for the Four Seasons Eighth Filing.
The price to reseed the maximum stripped are of 250,000 square
feet at a price of 0.012 Dollars ($0.012) per squ re foot would be Three
Thousand Dollars ($3000.00).
Please call if you need more information (In this project.
Sincerely,
Phillip Robinson, P.E. & L.S.