Loading...
HomeMy WebLinkAboutCENTRE AVENUE EXTENSION - Filed GC-GENERAL CORRESPONDENCE - 2003-11-04THE SEAR --BROWN GROUP FULL -SERVICE DESIGN PROFESSIONALS FORMERLY RBD, INC. 209 SOUTH MELDRUM FORT COLLINS, COLORADO 80521-2603 970-482-5922 FAX: 970-482-6368 November. 12, 1997 "red Shepard Current Planning 281 N. College Avenue Fort Collins, CO 80524 Re Centre Avenue Roadway Extension Sear -Brown Project #: 120-030 Dear Mr. Shepard: I iiclosed for your information are draft copies of the Preliminary Centre Avenue Drawings for this project. Two sets of blueline drawings are submitted herewith. Two sets of drawings will be (liven directly to CSURF. Also enclosed is a letter from CSURF concerning the right of way dedication. Please keep in mind that we are still in the design process and some drawings are either not included. or not complete. At this time, some design issues are subject to change after discussion reviews with CSILTRF. The drawings indicate where we are to date in terms of design and drafting. I f you have any questions or comments, please feel free to give me a call. Sear -Brow - - S�)al- � red Barela, P.E. Project Engineer enc: as noted cc: Julie Birdsall, CSURF Kathleen Byington, CSURF Darin Atteberry, City Managers Office File: 120-030 (A) �:L,w rORR•IIFNN51LVANIA COLORAOO • M z,[ I STANDARDS IN EXCELLENCE Dave Strmger_Centre Avenue Reveev Page 1 From: Ted Shepard To: Dave Stringer, Tim Blandford Date: 6/17/98 9:57AM Subject: Centre Avenue Review Dave and Tim I just concluded a meeting with CSURF regarding their long term plans for the balance of the C.A.T. and one of our topics was the Centre Avenue project. Here's what I learned and then I have a question: CSURF is working with Sear Brown, Stormwater, and FEMA on the length of the span of the bridge. Preliminary indications, based on the HEC II and the EXTRAN models, is that a 40 foot span will work. Thus it appears that the 200 foot span will not be needed saving CSURF a considerable sum of money. CSURF and Sear Brown will submit to FEMA documentation for a CLOMR and LOMR. Part of this submittal is that FEMA needs Preliminary Roadway Design for Centre Avenue. CSURF is working with Bob Smith to find out how we did Timberline over the Poudre River and to what level of plan completion FEMA needs, 80%? 90%? Sear Brown is expected to submit Centre Avenue plans to Engineering around September 1st, 1998. 1 advised CSURF to coordinate a pre -submittal meeting with Engineering to discuss a timeline. I thought that if we could give them the timeline for Timberwood Drive plans that may be a fair estimation on how long plan review wound be. They would like to do their bridge and irrgation ditch work this winter and then come out of the ground in Spring with roadwork. This means that plan review would have to be done this Fall. So, expect a call from either Julie Birdsall or Kathleen Byington regarding setting up an informational meeting regarding Centre Avenue plan review. Feel free to call if you have questions, Thanks, Ted