HomeMy WebLinkAboutCENTRE AVENUE EXTENSION - Filed GC-GENERAL CORRESPONDENCE - 2003-11-04THE SEAR --BROWN GROUP
FULL -SERVICE DESIGN PROFESSIONALS
FORMERLY RBD, INC.
209 SOUTH MELDRUM
FORT COLLINS, COLORADO 80521-2603
970-482-5922 FAX: 970-482-6368
November. 12, 1997
"red Shepard
Current Planning
281 N. College Avenue
Fort Collins, CO 80524
Re Centre Avenue Roadway Extension
Sear -Brown Project #: 120-030
Dear Mr. Shepard:
I iiclosed for your information are draft copies of the Preliminary Centre Avenue Drawings for
this project. Two sets of blueline drawings are submitted herewith. Two sets of drawings will be
(liven directly to CSURF. Also enclosed is a letter from CSURF concerning the right of way
dedication.
Please keep in mind that we are still in the design process and some drawings are either not
included. or not complete. At this time, some design issues are subject to change after discussion
reviews with CSILTRF. The drawings indicate where we are to date in terms of design and
drafting.
I f you have any questions or comments, please feel free to give me a call.
Sear -Brow
- - S�)al- �
red Barela, P.E.
Project Engineer
enc: as noted
cc: Julie Birdsall, CSURF
Kathleen Byington, CSURF
Darin Atteberry, City Managers Office
File: 120-030 (A)
�:L,w rORR•IIFNN51LVANIA
COLORAOO • M z,[ I
STANDARDS IN EXCELLENCE
Dave Strmger_Centre Avenue Reveev Page 1
From:
Ted Shepard
To:
Dave Stringer, Tim Blandford
Date:
6/17/98 9:57AM
Subject:
Centre Avenue Review
Dave and Tim
I just concluded a meeting with CSURF regarding their long term plans for the balance of the C.A.T. and
one of our topics was the Centre Avenue project.
Here's what I learned and then I have a question:
CSURF is working with Sear Brown, Stormwater, and FEMA on the length of the span of the bridge.
Preliminary indications, based on the HEC II and the EXTRAN models, is that a 40 foot span will work.
Thus it appears that the 200 foot span will not be needed saving CSURF a considerable sum of money.
CSURF and Sear Brown will submit to FEMA documentation for a CLOMR and LOMR. Part of this
submittal is that FEMA needs Preliminary Roadway Design for Centre Avenue. CSURF is working with
Bob Smith to find out how we did Timberline over the Poudre River and to what level of plan completion
FEMA needs, 80%? 90%?
Sear Brown is expected to submit Centre Avenue plans to Engineering around September 1st, 1998. 1
advised CSURF to coordinate a pre -submittal meeting with Engineering to discuss a timeline. I thought
that if we could give them the timeline for Timberwood Drive plans that may be a fair estimation on how
long plan review wound be.
They would like to do their bridge and irrgation ditch work this winter and then come out of the ground in
Spring with roadwork.
This means that plan review would have to be done this Fall.
So, expect a call from either Julie Birdsall or Kathleen Byington regarding setting up an informational
meeting regarding Centre Avenue plan review.
Feel free to call if you have questions,
Thanks, Ted