HomeMy WebLinkAboutTOWN SQUARE 1250 WEST ELIZABETH STREET MCDONALDS - Filed GC-GENERAL CORRESPONDENCE - 2003-11-04HU17-ZOLLIRS, INC 1 4582 South Ulster St. r Suite 1303 r Denver, CO 80237-2639 s 303.740.7325 phone r 303.224,9997 fox 1 huinzollorsaom
Monday - February 24, 2003
Sent Via: ® I" Class ❑ FedEx ❑ Courier ❑ Hand Deliver
❑ Facsimile to:
❑ Email to:
IIIIIIIII II IIII Ii II III'I IIIIR II IIIIIIIIIII IIIIIIII II IIIIIIIIII
BHA DESIGN, INC„
4803 Innovation Drive
Ft. Collins, CO 80525-6249
Attention: Mr. Bruce Hendee
Principal
Dear Mr. Hendee:
Re: Development Coordination for W. Elizabeth St
McDONALD's REsTAuRANT @ TowN SQUARE
1250 W. Elizabeth Street
City of Ft. Collins, CO
HZI JN. 16-0217-01
Congratulations! We understand that your firm was awarded the Elizabeth Street Corridor Master Plan
Stu contract with the City of Fort Collins.
As you may know, MCDONALD'S CORPORATION is planning to raze its existing facility located at 1250
West Elizabeth Street (within the "Town Square" development) and replace it with their new state-of-
the-art facility, including a dual drive-thru system. Ms. Lisa Lucero-Perman (Project Manager,
McDonald's) recently spoke to your associate, Mr. Roger Sherman regarding this project.
Per our November 18, 2002 "Site Plan Advisory Review Committee Meeting", Mr. Thomas Reiff
(Transportation Planner, City of Fort Collins) noted that the West Elizabeth Avenue street improvement
project was "moving forward" and that the City was "currently negotiating" the contract'. Mr. Reiff
recommended that we work closely with the selected consultant (at that time the `selected consultant'
was not known) to "ensure what [we're] showing along the frontage works within the City's scheme."
To bring you upAo-speed on our project, we recently2 submitted the required Minor Amendment
Application to Mr. Ted Shepard (Chief Planner, City of Fort Collins) for review and approval. The
current timeline goal for this project is to complete the rebuild of the facility before Colorado State
University students return for the Fall, 2003 semester.
In an effort the ensure our plans `work with the City's scheme', we are pleased to provide you with one
(1) copy of the following drawings (as submitted to Mr. Shepard3) for your initial review and thoughts:
Dwg No. Title Date
ECM-1 Existing Conditions Map 02/10/2003
Sp-1 Site Plan 02/10/2003
SP-2 Grading Plan 02/10/2003
L-1 Landscaping Plan 02/10/2003
Ms. Lucero-Perman and I would enjoy the opportunity of meeting with you and your Elizabeth Street
Corridor Master Plan Studv Design Team to review this information. Please feel free to call either Ms.
Reference: Meeting Memorandum for Site Plan Advisory Review Committee Meeting by BRYANT dated 11/18/2002.
2 Reference: Submittal Letter for Minor Amendment from BRYANT to SHEPARD dated 02/21/2003.
' This is a `partial' set of the drawings that were submitted as part of the
Minor Amendment Application.
�eti10-n.aQ SeiLvwct� wii�ti Qo 0 �� (yu� � 0
Mr. Bruce Hendee — BHA Design, Inc.
Development Coordination for W. Elizabeth Street
February 24, 2003
Page 2
HURTZO ARS
Lucero-Perman (303.779-0444) or me to setup a mutually convenient time to meet, should you feel this
would be beneficial. Thanks — we look forward to working with you to make Elizabeth Street an
improved corridor!
Sincerely,
P.E.
Prolesslonal Englneerse
.ow" NSrf UIRWIf ffml
Enclosures.
cc: Ms. Lisa Lucero-Perman, McDonald's Corporation
zMr..Ted.Shepard, City_of Fort Collin. Planing/
Mr. Thomas Reiff, City of Fort Collins: Transportation Planning
file: i:Ipro1116O217Wocsllbh022403.doc
7-30-03: 5:25AM:GWEST
VVL1v LVV.v Zvi. 11 - .- -v --,
Memorandum
;970 377 6436
11111I VLLIVJIV
postAt` Fax NOW 7671 Io„m 7
Date: July 29, 2003
To; Lire Spencer, OWEST
From- Katie Moore, Project Engineer
RE. REQUEST TO not dedicate a standard utility easement
The Applicant for the minor amendment to the McDonald's at Campus West at 1250 West
Elizabeth Street has requested not to dedicate the standard 15' utility easement along the
ROW of W. Elizabeth Street. This project will dedicate an additional 9' of Right -of -Way for
the street, and proposes a pocket easement for a water meter, but proposes to provide no
otl ter utility easements. Does QWEST need easements in this area?
Please sign and return any comments to Katie Moore in the Development Review
Department to be received by August 5, 2003. If no correspondence has been returned by
this date, it will be assumed that you have no objections to the above proposal. Please feel
free to contact me at 9701221.6605, ext. 7128 if you have any questions, Thank you,
KNo problems
Problems/Concerns as follows,
Katie Moore - RE JN 16021701: McDonald's (1250 W. Elizabeth Street Ft.. Collins) RE: SUBMITTAL OF REVISED ENGTWffER
From: Katie Moore
To: Bryant, Weylan; Shirley A. Farrell (E-mail)
Date: 8/27/03 9:18AM
Subject: RE: JN 16021701, McDonald's (1250 W. Elizabeth Street, Ft. Collins) RE: SUBMITTAL
OF REVISED ENGINEERING CONSTRUCTION DRAWINGS
Woody,
If you'd like to print out new deeds of dedication and have them re -signed, then I can just hold onto the
legals and sketches and wait for the new deeds, since they don't need to be changed.
Regarding signing off on the minor amendment - Engineering has no problems with McDonald's getting a
demolition permit, but we won't be able to sign off on the minor amendment until we have signed plans
and deeds of dedication for the ROW and easements in hand. I will be out of the office beginning August
28th and will return September 8th, but other Development Review Engineers will be able to work on this
while I am out. Please let me know if you have any further questions,
Katie Moore
Development Review Engineer
City of Fort Collins
>>> "Bryant, Weylan" <wbryant@Huitt-Zollars.com> 08/27/03 07:14AM >>>
Reply Sent: Wednesday, August 27, 2003 at 7:02 AM MST
HZI JN: 16-0217-01
Shirley...
* WE NEED YOUR IMMEDIATE ASSISTANCE, PLEASE!
* Katie MOORE (Development Review Engineer, City of Ft. Collins.ENGR) has
reviewed the DEED OF DEDICATION FOR RIGHT-OF-WAY and DEED OF DEDICATION FOR
EASEMENT for the 1250 W. Elizabeth Street (Ft. Collins) site and has several
questions that I don't know the answers for. Please see her original email
to me below.
* Please call me AS SOON AS POSSIBLE so we can discuss how to respond -
especially regarding MOORE Comment #5. 1 recommend that, if needed, NEW
DOCUMENTS be prepared and signed; HOWEVER, this will require that I
coordinate with MOORE who has the ORIGINAL Legal Descriptions and Graphics
prepared by the Surveyor.
Katie...
* I'll be in touch as soon as I Ms. Farrell calls with answers and
directions.
* As you know, McDonald's has "closed their doors" on this facility, in
preparation for demolition. HOWEVER, we are not able to demolish the
building until a Building Permit is in hand (McDonald's "rules") and we
can't get the Building Permit until we receive approvals from Planning and
Engineering - the infarnous Catch-22. Knowing that: (1) we are working on
the language and responding to your questions below; (2) you have no further
comments on the engineering construction drawings (as you know, I spoke with
Basil HAMDEN yesterday who noted he was prepared to "sign off' on his
portion of the review); and (3) Planning is prepared (as soon as I respond
to an email that I received from Ted SHEPPARD last evening) on the MINOR
AMENDMENT PLANS when do you believe you will be able to notify the Building
Department that they can release the Building Permit?
* As we discussed yesterday afternoon, I'm prepared to make the mylar
reproducibles of the Engineering Construction Drawings and have been in
contact with Mr. Oliver McBryan (the owner of the property to the north) to
obtain his "sign off' on the Cover Sheet. Please let me know at your
Katie Moore- RE: JN 16021701 McDonald's (1250 W. Elizabeth Street Ft Collins) RE: SUBMITTAL OF REVISED ENGIi
earliest convenience when I'm "cleared" to prepare the mylar reproducibles
so I can coordinate with my team. Thanks for your help!
... Woody
Huitt-Zollars, Inc. - DENVER
(303) 740-7325 phone * (303) 224-9997 fax * (303) 810-6007 mobile
wbryantno huitt-zollars.com * email
http:\\www.huitt-zollars.com * website
*** This e-mail is CONFIDENTIAL and is intended solely for the use of the
individual or entity to whom it is addressed. If you are NOT the intended
recipient or the person responsible for delivering the e-mail to the
intended recipient, be advised that you have received this e-mail in error
and that any use, dissemination, forwarding, printing, or copying of this
e-mail is strictly prohibited. ***
-----Original Message -----
From: Katie Moore [mailto:kamoore(a)fcgov.coml
Sent: Tuesday, August 26, 2003 5:09 PM
To: wbryant(o(?Huitt-Zollars.com
Subject: JN 16021701: McDonald's (1250 W. Elizabeth Street, Ft. Collins) RE
SUBMITTAL OF REVISED ENGINEERING CONSTRUCTION DRAWINGS
Woody,
I was reviewing the deeds of dedication for the easement and
right-of-way, and several items need to be cleared up:
1. McDonald's Real Estate Company, what type of company is it? is it
an Illinois Corporation? an Alaska i
2. If it is a corporation, then an attest is required for the
signature if someone other than the president or v.p. is signing, and
this attest should be the Secretary.
3. Since Catherine A Griffin signed as an attorney in fact, we'll need
a copy of her power of attorney.
4. If Catherine Griffin is not an attorney at law, then an attorney at
law will need to sign the attorney's certification and provide their
registration number. If she is an attorney at law, she'll need to
provide her registration number below her signature.
5. If you'd like me to return the deeds already submitted, please let
me know. If you're going to re-sign a new copy and send it to me, I
would appreciate the following change to the language ( I recently found
out about this clause for cases such as this, where the dedication can
be accepted without going to the planning and zoning board):
Instead of the line that states:
Accepted by the City of Fort Collins on the _ day of _, 20_
City Clerk
Please use:
This Deed of Dedication is accepted by the Director of Community
Planning and Environmental Services pursuant to Section 2.1.5 of the
Land Use Code of the City of Fort Collins this _ day of , 20_
Cameron Gloss
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
(970)221-6605
Weylan Bryant
Huitt-Zollars, Inc.
4582 S. Ulster Street - Suite 1303
Denver, Colorado 80237
Dear Mr. Bryant,
The McDonald's site located at 1250 West Elizabeth Street in Fort Collins is currently under
review by the City of Fort Collins for a minor amendment which was submitted by Huitt-Zollars. This
minor amendment shows McDonald's removing and replacing the sidewalk within the new Right of Way
(ROW), as well as reconfiguring the eastern driveway to the site within the ROW. The City is currently
planning a project to widen West Elizabeth Street, moving the curb and gutter, adding pavement, and
changing parkways and landscaping along this block, which is why McDonald's is not being required to
perform any of these improvements with this minor amendment. To summarize, the only improvements in
the Right of Way now being required for the McDonald's minor amendment are the sidewalk and
driveway improvements.
I hope this cParifies any questions or concerns you may have. If not, please feel free to contact
me at the number above or Tom Reiff in Transportation Planning at (970) 416-2040.
Sincerely,
Katie Moore
Development Review Engineer
City of Fort Collins
Services
Engineering Department
City of Fort Collins
June 18, 2004
Specialized Grading Enterprises, Inc.
P.O. Box 551
Morrison, CO 80465
J.O.B. Concrete Incorporated
13595 Stuart Court.
Broomfield, CO 80o2o
Re: Improper Inlet, Curb, and Sidewalk Construction at McDonald's at 1250 W. Elizabeth Street
Dear Sirs:
It has come to our attention that the stone water inlet, curb, and sidewalk in the drive -through lane constructed by your
company at the McDonald's in Fort Collins was constructed at the wrong elevation.
I have been m contact with Mr. Rod Marsh of Deer Creek Corporation and Mr. Waylan Bryant of Huitt-Zollars over the
past six months in an attempt to resolve this issue. Those attempts have been unsuccessful.
As licensed and bonded contractors with the City of Fort Collins it is your responsibly to construct the improvements
according to the approved plans. The inlet, curb, and sidewalk need to be removed and reconstructed at the proper
elevation.
The improper construction will result in an access problem from the drive -through lane to West Elizabeth Street when
the West Elizabeth Street improvements are complete. Our attempts thm Mr. Marsh and Mr. Bryant to coordinate the
reconstruction of the West Elizabeth construction with the inlet, curb, and sidewalk reconstruction have failed
Therefore, the City project will close the McDonalds drive on June 21' to complete the curb and getter and bike lane
reconstruction.
The City will construct a temporary asphalt patch along the back side of the West Elizabeth Street improvements. This
transition may be abrupt, but will stay in place until the corrections are made to the inlet and curb you installed
Please contact Lance Newlin or me at 970-221-6605 to discuss scheduling the improvements needing corrections.
Correction of these improvements will avoid further action by the City of Fort Collins toward your bond and license.
Sincerely,
Rick Richter
Pavement Management Engineer
City of Fort Collins
CC:
Lance Newlin, City of Fort Collins
Rhonda Henson, City of Fort Collins
Rod Marsh, Deer Creek Corp.
Weylan Brvant P.E. Huitt-Zollars Inc.
McDonald's Corporation, Englewood. CO
Vance Mohamed. McDonald's Fort Collins
Western Surety, Sioux Falls. SD
-81 North k:o➢ege Avenue • °0. 3ox 480 1 Forc C-Ains, C'—D 80522-0580 o (970) 221-d603 • FA (070):21-w7G
•WIVIV.1090v.Com