• Northern Engineering will meet with the ditch rider for the
North Louden Irrigation Ditch on Thursday October 5, 1995 to
discuss the proposed changes to the ditch. Northern has
previously had phone conversations with the Ditch Company
and the ditch company has stated that at this time, the
ditch company has no objections to the changes as proposed.
The Final Utility Plan Set will include a signature block
for the ditch company (Comment 9c).
• The release rate for pond N1 was calculated using the per
acre percentage of the culvert capacity as requested.
However, the RBD report states this value as 0.19 cfs/ac not
0.7 cfs/ac as stated in the Stormwater comment sheet. The
RBD value of 0.19 cfs/ac was used (Stormwater comment).
• When the design and location of the retention ponds are
fixed at Final submittal, a rating curve for the ponds will
be submitted (Stormwater comment 8).
• Attached is a letter of intent from Shenandoah L.L.C. (Jim
McCory) indicating his willingness to grant an offsite
easement for the sanitary sewer line. Easements throughout
the site for water and sewer have been put on the plat and
overall utility sheets (Engineering comment).
• An Utility Coordination meeting will take place on October
12, 1995 to resolve issues concerning the 60, ROW for
College Avenue and other outstanding issues.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
M;1�77M
R.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE:21 &-geM6r 19Q6 DEPARTMENT:
PROJECT: # y0-95A ToeGi I Cmek-?)ur6" +U[-) - Fnag-
PLANNER:.Rke L&)8
All comments must be received by: FPIt�A� l SK�MBEe 1) 1996
❑ No Problems
Problems or Concerns (see below or attached)
SITE PLAN
• A NINE FOOT LANDSCAPE STRIP IS SHOWN. I AM NOT SURE IF THIS IS ENTIRELY
ACCURATE. THE BACK OF WALK SHOULD BE AT THE EDGE OF THE ROW AND THIS
WOULD PROVIDE FOR AT LEAST A NINE FOOT LANDSCAPE STRIP, BUT THE CURB IS
PROBABLY NOT ATTHE ULTIMATE CROSS SECTION LOCATION WHICH WOULD MEAN THAT
THERE SHOULD BE MORE THAN A NINE FOOT LANDSCAPE STRIP.
• THE PROPERTY LINE SHOULD BE SHOWN AT THE BACK OF THE ROW
• THE WALK AT THE SOUTHERN PORTION OF THE PROPERTY SHOULD START TO TRANSITION
BACK OVER TOWARD THE CURB.
PLAT
• NEED DITCH COMPANY SIGNATURE
(CONTINUED ON NEXT PAGE)
Date: Sianat
2�IZ% �� b/��
��i o
CHECK IF YOU WISH TO RECEIVE PLAT �✓
COPIES OF REVISIONS SITE
LANDSCAPE
Q UTILITY
FOSSIL CREEK NURSERY - FINAL REVIEW COMMENTS DECEMBER 1 2, 1995
(PAGE 2 OF 3)
• NEED A DEFINITION BETWEEN PUBLIC ACCESS AND UTILITY EASEMENT AND FIRE ACCESS
EASEMENT. I
• IT IS NOT CLEAR WHAT SOME OF THE EASEMENT BOUNDARIES ARE
• A PEDESTRIAN AND BICYCLE EASEMENT IS NEEDED FOR THE WALK.
• U.S. WEST WILL NEED TO SIGN THE PLAT SINCE THIS IS AN EXCLUSIVE EASEMENT
• THE PROPERTY BOUNDARY LINE SHOULD BE LOCATED AT THE EDGE OF THE ROW (BEING
DEDICATED)
• IT IS NOT CLEAR HOW MUCH ROW IS BEING DEDICATED, AT THE SOUTH END IT SCALES
OUT TO BE ABOUT 67 FEET, BUT BASED ON THE TEXT IT SEEM THAT IT SHOULD BE 70
FEET.
UTILITY PLANS - COVER
• ADD THE FOLLOWING NOTE: THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE
INITIAL INS71LLATICN OF TRAFFIC SIGNING AND STRIPING FOR THIS DEVELOPMENT
RELATED TO DEVELOPMENT LCCAL STREET OPERATIONS. IN ADDITION THE DEVELOPER
IS RESPCNSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED TO
DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT (E.G. ALL SIGNING AND
STRIPING FOR A RIGHT TURN LANE INTO THE DEVELOPMENT SITE).
OVERALL UTILITY PLAN - SHEET 2
• NEED A CENTERLINE DRIVEWAY PROFILE, IT MUST SLOPE 2% AWAY FROM THE STREET
OR SHOW THAT NO ADDITIONAL FLOW BUT HISTORIC IS GOING INTO THE STREET.
J NEED A DIMENSION TO LOCATE THE ENTRANCE
• LABEL THE ROW LINE, ON THE PLAN VIEW AND THE STRIPING PLAN
V-' LABEL THE ACCESS RADIUS AS 40 FEET.
• NEED DIMENSIONS TO LOCATE THE WALK, WHERE IS IT RELATIVE TO THE FLOWLINE
• PROVIDE CONCRETE TO THE PROPERTY LINE AT THE ACCESS
• THE SIDEWALK SHOULD HAVE A MINIMUM RADIUS OF 60 FEET, AND SHOULD BE
LOCATED SO THAT IT CAN BE VERIFIED THAT IT STAYS WITH IN THE EASEMENT PROVIDED
FOR T.
• WHERE DOES THE CURB AND GUTTER END OR DOES THE ENTIRE DRIVE AND PARKING
AREA HAVE CURB AND GUTTER.
• PER THE STATE REQUIREMENT A 12 FOOT TURN LANE IS REQUIRED EXCLUSIVE OF THE
CURB AND GUTTER. I CAN NOT TELL FROM THIS PLAN IF THAT IS BEING MET. ( WITH A
1 3 FOOT TURN LANE I AM ASSUMING IT IS) PROVIDE A CROSS SECTION VIEW OR
CLARIFY ON THE PLAN.
• DITCH COMPANY SIGNATURE 15 NEEDED
• INDICATE THE LOCATION OF 'RIGHT LANE MUST TURN RIGHT' SIGNS PER ERIC B.
COMMENTS
FINAL DRAINAGE PLAN - SHEET 5
• THE SIDEWALK AT THE SOUTH END SHOULD START TO TRANSITION OVER TOWARD THE
CURB
DRAINAGE DETAILS - SHEET 8
• TYPICAL PAN X-SECTION REFERENCES THE THICKNESS TO USE ON RESIDENTIAL AND
COLLECTOR STREETS, THERE ARE NO STREETS IN THIS DEVELOPMENT
(CONTINUED ON NEXT PAGE)
I
FOSSIL CREEK NURSERY - FINAL REVIEW COMMENTS DECEMBER 1 2, 1995
(PAGE 3 OF 3)
• THERE IS A DETAIL LABELED TYPICAL SIDEWALK X-SECTION, THIS NOT FOR SIDEWALK
ADJACENT TO COLLEGE AVENUE, PLEASE MAKE SURE THAT IS CLEAR ON THE PLAN
GENERAL DETAILS - SHEET 9
• DRIVEWAY DETAIL - THIS NEEDS TO BE MODIFIED TO REPRESENT WHAT IS TO Be BUILT:
CONCRETE TO PROPERTY LINE, WALKS AS THEY ARE SHOWN ON THE PLANS, PROVIDE A
RAMP DETAIL OR PROVIDE ENOUGH INFORMATION ON THIS ONE TO SHOW HOW THE
RAMPS ARE TO BE BUILT.
• YOU ARE SHOWING AN ACCESS RAMP DETAIL, I DID NOT SEE ANY OF THESE BEING
SHOWN.
• DETAIL FOR VERTICAL INFLOW CURB AND GUTTER, NEED THE STANDARD CITY DETAIL FOR
THE CURB AND GUTTER LOCATED IN THE ROW. THE ONE SHOWN IS OK TO BE USED ON
THE SITE.
12
r
STATE OF COLORADO
DEPARTMENT OF TRANSPORTATION
Region 4 �T
1420 2nd street
P.O. Box 850
Greeley, Colorado 80632-0850
(970) 353-1232
November 30, 1995
Mr. Mike Ludwig
City of Fort Collins Planning Department
P.O. Box 580
Fort Collins, CO 80522-0580
Dear Mike:
Latimer County, SH 287
Fossil Creek Nursery
1/2 Mile S. of Trilby Road
West Side
S. of Fort Collins
We have reviewed the Fossil Creek Nursery Final Plat. It does not appear that our concerns have
been addressed. If the property is experiencing a change of use as a result of this development, then
the City will need to re-evaluate the overall access picture.
Our other comments concerning landscaping and utilities continue to remain valid.
Our comments are based upon the submittal as received November 22, 1995.
Thank you for the opportunity to review the Fossil Creek Nursery PUD. Please contact me at (970)
350-2148 if you have any questions.
Sincerely,
Gloria T. Hice-Idler
Access Coordinator
xc: Springer
File (2)
Commui Planning and Environmental ; vices
Current Planning
City of Fort Collins
December 15, 1995
Jack & Christine Fetig
c/o Jim Sell
Jim Sell Design, Inc.
117 E. Mountain Avenue
Fort Collins, CO 80524
Dear Jim,
Staff has reviewed your documents for the Fossil Creek Nursery P.U.D., Final, that were submitted
on November 20, 1995, and would like to offer the following comments:
The Poudre Fire Authority states that if the proposed greenhouse is accessible to the public,
it must be fire sprinklered with a (6") six inch supply.
2. U S WEST states that the 30' access easement at the southeast corner of the property should
be described as a "30' utility easement."
3. Public Service of Colorado states:
a. The 20' access and utility easement that snakes across the property from east to west
needs to be widened to 30' on the Final Plat to allow adequate easement width for the
natural gas line.
b. The 16' fire access lane should be described as a "16' fire access and utility easement"
on the Final Plat.
C. The existing natural gas services to the existing buildings on Tract B will have to be
modified due to the division of this property into four tracts by this P.U.D.
4. The Zoning Department offers the following comments:
a. This property is located in the Neighborhood Sign District. Therefore, the Planning
and Zoning Board will be reviewing the location of all wall signage.
Please show all wall sign locations on the elevation drawings. Please revise Project
Note #3 on the Site Plan to state: "Subject property is located in the Residential
Neighborhood Sign District. All signage must comply with Chapter 29, Article
IV of the City Code (the Sign Code)."
2�1 'Surth ( 011L' r iAv'cnIt' • 1'.0[ion i80 Pert Collin, ( 0 807;22_0;80 • (07Oi 221-h; �U
I'A\ (970) 221-o378 I DD (970) 224-holy
b. Please add a note to the Site Plan which states: "Gravel drives are limited to staff
vehicle use only. No public vehicle use is allowed. Signs to be posted."
C. Please add a note to the Landscape Plan which states: "Landscaping of common
open space areas shall be installed or secured with an irrevocable letter of credit,
escrow, or performance bond for 125% of the valuation of materials and
installation prior to the issuance of the first Certificate of Occupancy."
d. Please show the distances from the property line to all new building envelopes.
The Building Inspections Department offers the following comments:
a. Please add a note to the Site Plan which states: "All buildings greater than 5,000
square feet in area shall be equipped with an automatic fire suppression system or
compartmentalized by fire -resistive construction in sections of less than 5,000 square
feet as required in accordance with Sections 3802, UBC as amended by the City of
Fort Collins."
b. The site shall be accessible to persons with disabilities in accordance with Uniform
Building Code Section 3103 and UBC Appendix Section 3106. Provide a designated
and marked "accessible route of travel" between all of the buildings on site and
building exits and entrances and the public way (public sidewalk). Accessible routes
shall comply with ANSI A117.1-1992 with running slopes no greater than 1:20 and
cross slopes no steeper than 1:48. Where routes cross lanes for vehicle traffic they
shall be designated and marked as a cross walk. Provide parking and signs per
Appendix Section 3107. Parking and access aisles shall comply with ANSI A117.1-
1992 with slopes no greater than 1:48 in any direction. Curb ramps shall be provided
where the accessible routes traverse curbs. Ensure that bike racks are located to leave
accessible routes unobstructed. Where passenger drop-off and loading zones are
provided they must comply with UBC Appendix Section 3108 and be located on an
accessible route.
C. Existing buildings which undergo a change of use must be made to comply with all
the requirements of the current building code for the new use and must obtain a new
Certificate of Occupancy.
d. All structures, new or which undergo a change of use, must comply with the
provisions of the energy code in place at the time of building permit.
6. As per discussions with the planning consultant prior to the Planning and Zoning Board's
consideration of the Fossil Creek Nursery PUD, Preliminary, and during the review of the
Final PUD application, the Natural Resources Department requests the following:
a. Please delete all statements which reference "(pruned and thinned out as needed)".
These notes should only read "Existing trees to remain."
b. The proposed disposition of existing trees south of the entrance drive and east of the
retention/detention pond ("to be removed") must be discussed with Rob Wilkinson
of the Natural Resources Department (221-6288).
C. Please provide notes on the Site Plan about the intended characteristics of the pond
habitats of the retention/detention and retention ponds. Please discuss these
characteristics with Rob Wilkinson of the Natural Resources Department (221-6288).
d. Please use native species of trees in the "natural' areas in place of Scotch pines and
Russian golden willows.
The Planning Department offers the following comments:
a. Please revise all of the signature blocks on the Site Plan (and Plat?) to state ".......
1996..."
b. Please revise Project Note #1 to state: "See Final Plat and ......." (not Preliminary
Plat).
C. Please label the Site Plan as "Sheet 1 of 4", Landscape Plan (sheet 1 of 2) as "Sheet
2 of 4", Landscape Plan (sheet 2 of 2) as "Sheet 3 of 4", and the Building Elevations
as "Sheet 4 of 4".
d. Please revise the "detail note" on the Landscape plan (sheet 1 of 2) to reference
"Sheet 3 of 4".
8. Comments from the Stormwater Utility Department are attached.
9. Comments from the Engineering Department are attached.
10. The Mapping Department offers the following comments:
a. Does this plat dedicate additional College Avenue R.O.W.? If so, Tracts should bo
to that line. The R.O.W. should be a solid line.
b. There appears to be too many dimensions along the east line of the Plat.
C. How was the south line of the Plat, being the south line of the NE 1/4 determined?
There needs to be another control monument.
The title location is wrong. It should be the NE 1/4 Section 14-6-69. The legal starts
at the NW corner of Section 14 - should be the NE corner.
e. The legal has a call missing, the first call after the point of beginning.
f. Why are there topographical features such as manholes, walks, and wetlands shown
on the Plat?
g. There are easement lines without bearing and distance. Please add this information.
h. The legal says 47.678' and the map shows 47.62' to the Point of Beginning. Which
is correct?
I. There are curve numbers shown in the easements near the southeast comer of the site.
Why are they there?
Make sure all of the easements are "locatable" (ties to boundary).
This completes the review comments at this time. Additional comments may be forthcoming as the
various departments and reviewing agencies continue to review this request. Please be aware of the
following dates and deadlines to assure your ability to stay on schedule for the January 22, 1996
Planning and Zoning
Board hearing:
*******************************************************************************
Plan revisions are due by 5:00 p.m. on January 3, 1996. Please contact me for the number of
folded revisions required for each document.
PMTs, renderings, and 8 folded copies of final revisions are due by 3:00 p.m. on January 16,
1996.
*******************************************************************************
Please contact me at 221-6206 if you have any questions or concerns related to these comments. I
would like to schedule a meeting with you as soon as possible, if necessary, to discuss these
comments.
Sincerely,
Michael Ludwig
Project Planner
xc: Sheri Wamhoff
Stormwater Utility
file/Project Planner
JRN-02-1996 13:03
MPTTHEW DELICH PE 3036695034 P.02
0
g
w
O
W
a
S
U
w
0
W
x
ti
eC
�e
TO:
P
FROM:
DATE
SUBJECT
MEMORANDUM
Jim Sell, Jim Sell Design
Mike Ludwig, Fort Collins Planning Department
Sheri Wamhoff, Fort Collins Engineering Department
Matt Delich
January 2, 1996
Fossil Creek Nursery - Response to City staff
comments (File: 9568MEM3)
This memorandum provides a response to the comment
requesting additional information pertaining to Section
3.6.3.C. of the state Highway Access Code (SHAC). I believe
that this request is made related to a comment by CDOT staff.
Clearly, the proposed use will cause a greater than 20 percent
increase in site generated traffic and, as such, comes under
the purview of the SHAC. The traffic study (August 14, 1995)
addressed the short and long range traffic generation and
operation at the proposed access. In my judgment, it is
important that access to the proposed use be considered
separately with two different development scenarios for
adjacent land.
The land of particular interest is the commercial portion
of the Ridgewood Hills ODP or the area known as "Shenandoah."
As of this writing, approval of Shenandoah is not certain.
However, the previously approved Ridgewood Hills ODP showed
a street across from Victoria Drive, as well as, another
z street access approximately 1900.feet north of Victoria Drive,
One or both of these accesses is subject to development by
z other parties.
5
z
As stated in the cited traffic study, Fossil Creek
Nursery will likely be developed prior to the adjacent land
to the west and south. Therefore, in the short range future,
the Fossil Creek Nursery access should be considered as their
S' sole point of access to the street system. With a single
point of access (short range analysis in the traffic study),
o the left -turn exits from the site operate at levels of service
zD and F in the respective peak hours. These are the same
levels of service that occur at all stop sign controlled
.- accesses along this section of US 287. Auxiliary lanes are
' recommended in the traffic study. The SHAC (Section 4.7)
states: "Speed change lanes, also called auxiliary lanes, are
avery helpful in maintaining the safety, flow, and operation
of the highway and access." Prohibition of left turns in or
out of this access in the short range future would require
either U-turns on US 267 or long circuitous routes, which will
degrade the operation of other area intersections. Based upon
-96 TIIJ; IPM _���J6�'6 �J: D.
K
�---I'I�
Z--�s,�__
zzf- 9s2�
Z __1-��l1TiN� LIGHT V- _owl Z2 4-6/ �
- 1+7—_I' D_ �TISS 1VOZnFEe� - NC -e—
t
7S
TAN-02-1996 13:04 NATTHEW UELICH PE 3036695034 P.03
the above, it is recommended that the proposed access to the
Fossil Creek Nursery be a full -turning movement intersection
with the recommended auxiliary lanes in the short range
future.
When the property(s) to the west and south develop,
alternative access should be made to the Victoria Drive
intersection, which is likely to be signalized. This
recommendation is made in the Fossil Creek Nursery traffic
study and is shown on various site plans. When this
connection is physically made, then the Fossil Creek Nursery
access should be changed to a limited turn access. At a
minimum, the access should be right-in/right-out. However,
as recommended in the traffic study, consideration should also
be given to providing left -in access. The proposed access is
located 1600 feet north of Victoria Drive, which is more than
adequate to provide left -turn deceleration and storage for
both of these intersections.
The site plan for the subject property shows one access
to US 287. with no other access to the street system, this
access is recommended to have full -turning movements until
alternative access can be provided. This recommendation is
made in consideration of Section 3.6.3.C. of the SHAC.
TOTAL P.03
77 4 PMI
r.'IC(IS, WIC.
January 3, 1996
Mr. Mike Ludwig
Community Planning and Environmental Services
City of Fort Collins
PO Box 580
281 North College Ad.onue
Fort Collins, Colorado 80522-0580
RE: Fossil Creek Nursery Fino:
Response to City Comments
Dear Mike,
This letter is in response to the comments regarding engineering issues Northern Engineering
Services Inc. (NFS) received regarding thz Final Utility plans for Fossil Creek Nursery, as
detailed in a letter to Jim Sell Design from Mike Ludwig dated December 15, 1995.
Item I - Will change line size to 6"
Item 2 - Will notify L indstar t i make the change on the Final Plat.
Item 3a & b - Will notify Lancstar to rnAc these changes on the Final plat
Item 3e - Owner has beer notified. Oas services me not shown on our Final Utility plans.
Item 7a & b - Will modily Final plat end Utility plans to reflect 1996 and Final.
Item 8 - Attached is a copy of Stormwater U'ilities Comment sheet, with Northern
Engineering's response. This report is currently being modificc' and will be submitted to the
Stormwater Utility as soon as possible.
Stormwater did discuss in their comments of the aced for a downstream easement to drain
into Robert Bensoa I .ewe. There 'tas I een , tentative agreement reached with the City for a
license to drain in tYs :ake.
Stormwater also had a comme.- regarding the use or m mitoring of pesticides. TThe ovrmjer
will provide a geamlijy-d list I a'.i types and amounts of pesticides he currently used for the
past year on his site. Copios of mast State inspection forms for Fossil Creek Nursery can be
I ( !L., 1, 11 . i ,L, I . I)/i 1. 7.v,(`rye):?314159
supplied to the City, whist: slu,w that the owner did comply with the State regulations for
pesticide control.
Item 9 - Jim Sell Design will address comments regarding the Site Plan. Landstar Surveying
will has also been provided with a copy of comments regarding the plat. In regard to
comments on the Utility Plans
The note will he added.
The drainage study does address the lact that there is less than historic flows out onto
College. There is not it sump condition in the driveway.
Dimensions and additional labels will be added to clarify the Utility plans.
A detail sidewalk ltcation control plan has been added. The utility easements will also
be designated as pedestrian ascss and hicycic casements.
A detail of the limits and types of curb and gutter has been added to the utility plans.
Plans will be clarified regarding the turn lane into the site.
Ditch Company signature will he obtained. A signature block is being provided on the
cover sheet. An agreement retarding maintenance is currently being drafted by the
legal represew.,live for Mr. Fetig, and the Ditch Company attorney.
Striping plan atteady indicates the location of this sign.
Sidewalk will be modified.
Details will be modified to represent what is being built.
Matt Deficit is working with : hcri regarding the State recess and on the question of
whether this should be Right in and (tight out only. The State Highway access permit
is currently being pursued.
Item 10 - This plat does dedicate an additional 10' of Right -of -Way. All other comments will
be addressed on the Final Plat by Landstar. The ;inal plat will not show topographical
features, this is only a requirement of the preliminary plat.
In addition, Northern Tinginecring received copies of comments from the District regarding
domestic water and sanitary sewer service to the site. All onsite issues have been addressed,
and copies of the revis:d plans v-ill be sent to the District for further review. The District
has requested an otfsite sanitary sewer casement, and the owner does possess a letter of
intent from the owner of the Shenandoah property for this eastment. The owner will also
require an agreement to tic into the c.-:isting Sanitary sewer main, north of his property (this
stain has not yet officiilly been taken over by the District). This agreement has tentatively
been agreed to, and a legal agreement is currently being drafted.
Jim Sell Design will address all other issues not addressed by this letter. Northern
Engineering will make a submittal of the revised Utility —plans as well as the revised
Dr unac_an rosum .ontm tud_u uxm_�s they are finalized. 1 hope this letter will help
to satisfy Stall", concerns.
Thank you for your time and consideration of this project.
Sincerely,
Roger A. Curtiss P.E.
cc: Jack Fetig, Fossil Creek Nursery
Tom Kehler, Jim Sell Design
Greg D. Fisher, Greg D. Fisher Architec,
Sheri Wamhofl, City of Fort Collins
Basil Harridan, City of Fort Collins Stormwater Utility
Terry Ferrill, Ft. Collins/Loveland Water District
PROJECT
COMMENT SHEET
City of Fort Collins
Current PlanninP
DATE: �-/i ,'/97
PROJECT: FuE,,I,_ cri5rK
PLANNER: f�p`E 57"&Q-L
DEPT: Engineering
Nu016i_y
ENGINEER: G. �, _ Flo J1457)e.� =rv�iro nr& sou«s
®No Problems
Problems or Concerns (see below or attached)
— Ti4e FRsT , lJk.E gef�_RED To (SW7N Gv2n1NZ of T2RGT p� IS
'bi FFefza'Tr" Vq-1� OOrz Pt-Ar
Yovn- vw-c cr; = S4't 'Cq "o-7"W I T9 YAW6 • 5 4q'01j os'u/
Foe `y I H � Fly,, a
TEE F_M6T IASTAtsLe VkG-A3TIot)
Y002 VA-Q1&= 40.74 '
l
l Al Ytx-t 2 V,4, = 77 otil DE�2t pnJ
61/k lxel-� : ` Cggl
FLIP ovdt
Date: ISignature:
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT
❑
SITE
❑
UTILITY
❑
LANDSCAPE
prT -pt- 6ouTgk)r6T cor2-N� oP 7-p(E Wtfxr-7o,J ) TIE Viwu& Fc2
7KE 5M U• C XVr g_IZG f+LSC JDl 7 -p124:)rn out- ?ufiT.
'-e0tj2 v*t ues
/L = 5, cc A T.00
�teMf►ala+�k�d� lb0'M'X" A = /01�59p6v
— I'C WcIJuD w A 67noG Z!De�q TC, STi IS zrfe-
Uw�J�2 a C 71c
Y�� ,vc-� To'� O E AfY S6 1i5Do5bv l/gi�-T W rS /✓�c�ss Y
YIOu NCW TO RU, OUT Al IWIII Wre)u L;D -fe- P/, jpia'n)W. aG4/4a
0? 615%Mrljr Umclp�(lf j,
c v i-r /+ pc-m JLFxz J Vala /5 sJ 5 �� /� 1316 ✓�nr/7�
To v� wK��� u� !!,�✓E T� L��.
Commi, `v P!annin2 and Environment.:' '-riices
Current i_aania
Citv of Fort Collins
September 15, 1995
Jack & Christine Fetig
c/o Jim Sell
Jim Sell Design, Inc.
117 E. Mountain Avenue
Fort Collins, CO 80524
Dear Jim,
Staff has reviewed your documents for the Fossil Creek Nursery P.U.D., Preliminary, that were
submitted on August 21, 1995, and would like to offer the following comments:
The Light and Power Utility states: "Development charges for this site will be quite
substantial. The developer needs to contact the Light and Power Utility Engineering
Department at 221-6700 regarding power requirements and location."
2. U S WEST states: "Review of these plans should not be construed as a commitment that
telephone facilities sufficient to serve this project are presently available. U S WEST will
provide telephone service in accordance with the rates and tariffs on file with the Colorado
Public Utilities Commission.
The owner is responsible for provision of all conduit, ditch crossings, and street crossings for
telephone facilities within the project. The owner also provides terminal room space (usually
8' x 4') and power for the main terminal at on building on each property, generally in a utility
room. The owner's vendor provides all facilities beyond the main terminal. Contact the U
S WEST engineer for conduit specifications for the main telephone entrance cable."
In addition, U S West offers the following comments:
a. If Tract B will be a separate parcel for tax purposes, then a utility easement from the
east property line will be required to provide telephone service to this tract.
b. The proposed entry to this property conflicts with an existing telephone pedestal.
Any relocation of existing telephone facilities required by these plans, including vault
lid adjustments, will be paid for by the developer.
C. No wetlands dredging may take place within the 16'/z' telephone easement along the
east property Gne.
281 :North College Avenue • P.O. Box S80 Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (Ir/M =1-6378 MD (Q70) 224-6002
The Fort Collins -Loveland Water District and the South Fort Collins Sanitation District have
no objections to the proposed project provided all District requirements are satisfied. The
preliminary construction drawings are to reflect the District's minimum design criteria
requirements.
4. The Zoning Department offers the following comments:
a. Bikes racks should be provided. Please show their location on the landscape plan.
b. The building envelopes should not be shown on the plat.
C. The "overflow" parking area must be asphalt and the 23 parking spaces must be
included in the total parking figures (65 spaces). If 65 standard parking spaces are
provided, a total of three handicap parking spaces are required. The parking and
drives land use data should be revised accordingly.
d. Please add a dimension of the distance from the building envelope to the lot line on
the Site Plan.
e. This property is located in the Neighborhood Sign District. Therefore, the Planning
and Zoning Board will be reviewing the location of all wall signage. Please show all
wall sign locations on the elevation drawings.
5. The Building Inspections Department offers the following comments:
a. The Sales Center/Greenhouse building exceeds 5,000 square feet in area. An
automatic fire suppression system or compartmentalization by fire -resistive
construction is required in accordance with Sections 3802, UBC as amended by the
City of Fort Collins.
b. The site shall be accessible to persons with disabilities in accordance with Uniform
Building Code Section 3103 and UBC Appendix Section 3106. A designated and
marked accessible route of travel between the buildings and the public way must
be provided. The accessible route shall comply with ANSI Al17.1-1992 with
running slopes no greater than 1:20 and cross slopes no steeper than 1:48. Where
routes cross lanes for vehicle traffic they shall be designated and marked as a cross
walk. Provide parking and signs per Appendix Section 3107. Parking and access
aisles shall comply with ANSI Al 17.1-1992 with slopes no greater than 1:48 in any
direction.
C. Storage or use of hazardous materials must be in compliance with the Fire Code and
Chapter 9 of the 1991 Uniform Building Code as adopted by the City of Fort Collins.
The Poudre Fire Authority is reviewing the Hazardous Materials Impact Analysis
which was submitted. Comments will be forthcoming.
d. Exterior walls, openings in exterior walls and projections from exterior walls
(cornices, eave overhangs, etc.) shall be of fire resistive construction if located less
than 10 feet from a property line or assumed property line between buildings on the
same lot. It appears that the proposed sales center and the existing building to the
north are closer than 20 feet apart.
e. Use of all or a portion of the existing residence for a design office is a change of use
and requires that a new certificate of occupancy be issued prior to occupancy. All
current building code provisions for the new use must be met.
6. The following notes should be added to the FINAL Landscape Plan:
a. "All existing trees to be pruned to the City Forestry Medium Prune Standards."
b. "Prior to construction all protected trees shall have orange protection barrier fencing
erected which as a minimum are supported by 1" x 1" or similar sturdy stock, for
shielding of protected trees, no closer than six (6) feet from the trunk or one-half (1/2)
of the drip line which ever is greater. Within this protection zone, there shall be no
movement of equipment or storage of equipment, materials, debris, fill, or cut unless
approved by the City Forester."
C. During the construction stage of development prevent cleaning of equipment or
material or the storage or disposal of waste materials such as paints, oils, solvents,
asphalt, concrete, mortar, or any other material harmful to the life of a tree within the
drip line of any protected tree or group of trees.
7. The Planning Department offers the following comments:
a. Project Note 5 should read as follows: "Existing house to be used as caretakers
residence. Proposed expansion to be used as a design office."
b. The Land Use data indicates 9,970.4 square feet of residential use. It does not appear
that the existing house (proposed caretakers residence) is 9,970.4 square feet. How
was this figure calculated?
C. The Planning Objectives letter indicates that the existing residence and a design office
for the nursery are proposed. However a note on the elevation drawing indicates that
the "existing caretaker residence is to remain as is until that time when it is expanded
to incorporate the future studio office." What will happen to it then? Will the
residence be deleted and the entire building be commercial? This is of particular
concern, as points are being claimed Point Chart D for providing mixed use on the
property.
d. Point Chart D states that "each of the following applicable criteria must be answered
"yes" and implemented within the development plan." The applicant has answered
"no" to Criteria 1, "Does the project gain its primary vehicular access from a street
other than South College Avenue?" A variance to this requirement must be requested
and justified by the applicant.
8. The Stormwater Utility Department stated that the applicant must obtain an easement through
Benson Reservoir for the additional volume which is proposed to be added by this
development. The applicant must obtain the easement or a letter of intent to provide an
easement from Alan Krcmarik, City of Fort Collins Finance Director by the October 4, 1995
revision deadline. Further comments from the Stormwater Utility are forthcoming.
The Engineering Department offers the following comments:
a. The traffic report indicates that a 450 foot long right turn lane and 270 foot taper are
required for this development. The applicant must provide additional on -site right of
way and must obtain additional off -site right of way from the property owner(s) north
of this property. It appears that and additional 10 foot width of right of way is
needed.
b. The 7 foot wide detached walk must be located at this time and within a public access
easement.
C. The ditch company will be required to sign the Plat and Utility Plans. Please provide
the appropriate signature blanks.
d. The fire access lane must be defined as a public access easement on the plat.
e. A State Highway Access Permit is required. Please contact Kerrie Ashbeck to obtain
necessary application forms.
This completes the review comments at this time. Additional comments may be forthcoming as the
various departments and reviewing agencies continue to review this request. Please be aware of the
following dates and deadlines to assure your ability to stay on schedule for the October 23, 1995
Planning and Zoning
Board hearing:
*******************************************************************************
Plan revisions are due by 5:00 p.m. on October 4, 1995. Please contact me for the number of
folded revisions required for each document.
PNMs, renderings, and 8 folded copies of final revisions are due by 3:00 p.m. on October 16,
1995.
R**************R*********************RRRR***************RRRRR****RRRR*R***RRR*R
Please contact me at 221-6206 if you have any questions or concerns related to these comments. I
would like to schedule a meeting with you as soon as possible, if necessary, to discuss these
comments.
Sincerely,
Michael Ludwig
Project Planner
xc: Kerrie Ashbeck
Stormwater Utility
file/Project Planner
SEP-20-1995 13:3e MATTHEW DELICH PE 7036695034 P.02
m
0
r
O
oa
e
O
v
0
a
m
a
TO:
A
W
a
x
v
J
W
FROM
MEMORANDUM
Jim Sell, Jim Sell Design
Mike Ludwig, Fort Collins Planning Department
Eric Bracke, Fort Collins Traffic Engineer
Sheri Hamhoff, Fort Collins Engineering Department
Matt De 1 ich
DATE: September 20, 1995
SUBJECT: Co� Creek Nursery - Response to City staff
cc i e: 9568MEM2)
This memorandum is to clarify the comment that a 450 foot
right -turn lane, plus a 270 foot taper, are required at the
proposed access to the Fossil Creek Nursery. This right -turn
lane should be striped in the existing shoulder area, as is
the case with numerous other accesses along this segment of
U.S. 207. This is the recommendation for the right -turn lane.
Additional off -site right-of-way to the north is not required
for this right -turn lane. CDOT may request additional right-
of-way from the Fossil Creek property for future widening, but
it is doubtful that they would request additional right-of-
way if all of the improvements can be accomplished within the
existing curb and gutter.
TOTAL P.02
')cF-H-95 WED I Phi H36395034 7
Northern Engineering Services, Inc.
October 2, 1995
Mr. Michael Ludwig, Project Planner
Community Planning and Environmental Services
City of Fort Collins
P.O. Box 580
281 North College Avenue
Fort Collins, CO 80522-0580
RE: Preliminary Review Comments for Fossil Creek Nursery P.U.D.
Project No. 9539.00
Dear Mr. Ludwig,
Northern Engineering has received and reviewed the comments
by the City of Fort Collins regarding the Fossil Creek Nursery
P.U.D. project in south Fort Collins. This letter addresses the
comments related to the plan set or to utility/drainage issues
raised in your September 15, 1995 letter to the developers Jack
and Christine Fetig.
• An easement under the entrance drive has been added to the
plans to provide telephone service to Tract B (Comment 2a).
• The telephone pedestal will be relocated at the developer's
expense (Comment 2b).
• No wetlands will be dredged within the telephone easement
( Comment 2c) .
• The preliminary construction drawings have been revised to
reflect the Fort Collins -Loveland Water and South Fort
Collins Sanitation Districts' minimum design criteria
( Comment 3).
• The applicant has decided to retain onsite the additional
volume created by this development. This will eliminate the
need for an offsite easement to Benson Reservoir (Comment 8
and Stormwater comment 9). Drainage easements have been
provided for the onsite retention ponds (Stormwater comment
1). In addition, the applicant has chosen to keep the
developed site flows separate from flows from Ridgewood
Hills by providing a separate swale and retention ponds. No
developed flows from this site should impact the wetlands
(Stormwater comment 3).
• The plans have been revised to show an approximate location
for the 7-foot sidewalk and access easement (Comment 9b).