Loading...
HomeMy WebLinkAboutFOSSIL CREEK COMMUNITY PARK 5821 SOUTH LEMAY AVENUE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2003-11-03Citv of Fort Collins ortation Services Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 01-45 Issuance Date: ! z /( Project Name: Fossil Creek Community Park Project A.K.A.: Project Location: 5821 South Lemay Avenue Permittee: Craig L. Foreman. City of Fort Collins Park Planning and Development City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ N/A Construction Inspection Fee (paid prior to issuance of this permit) $ '411A Total $ w/ / Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ N/A Form of security deposited with the City: N/A PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Lngineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. �PAiJ l-iA Ci>A,eGE /�Cccr�,� �7�=rw��c�. miry f��✓�i<5 r- tn/G.�t�EL'i2�ti�' 281 AoI III ( olh°r(' Av rnuo • N). Bok 580 • Fort Collins, CO 80522-0580 • (970) 221-0605 • FAX (970) 22I-6;78 wNN mci.(ort-collins.co.us People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Title ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet tilled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: $ 3o- w, (1-7C Z. Private infrastructure, estimated cost: $ S` .700o,V IN) I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if accessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. Applicant Signature:_ Date: S- 1 �; / o\\\)}!\Jj,/()§\()) »%°\; e� 2 . m 6.2 m U {ry O - E 3 yry ] j 3 tN 2 h U Er 0 L �a 3 � �5 2 4 O V � fr s 3J° j IE b n b c o J FG,IY _ (eve".) F- W Schematic Design - Opinion of Probable Cost Phase la ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE ITEM TOTAL GENERAL REQUIREMENTS 1 Bid Bond 1 Lump Sum $11,000.00 $11,000 2 Mobilization 1 Lump Sum $30,000.00 $30,000 3 Construction Staking 1 Lump Sum $20,000.00 $20,000 4 Testing 1 Lump Sum $15,000.00 $15,000 5 Traffic Control 1 Lump Sum $5,000.00 $5,000 Subtotal $81,000.00 DEMOLITION 6 Site Clearing 1,300,000 sf $0.03 $39,000 7 Remove existing curb 123 If $6.00 $738 8 Remove existing asphalt sidewalk 1,923 If $2.00 $3,846 9 Top soil Stockpiling 14,572 cy $1.75 $25,501 Subtotal $69,085.00 EARTHWORK 10 Excavation (including rock) 1 Lump Sum $500,000.00 $500,000 11 Dust Control 1 Lump Sum $22,000.00 $22,000 Subtotal $522,000.00 STORM SEWER 12 15" RCP 240 If $40.00 $9,600 13 18" RCP 200 If $50.00 $10,000 14 24" RCP 2,315 If $70.00 $162,050 15 Inlets 6 ea $2,500.00 $15,000 16 Manhole 7 ea $2,000.00 $14,000 17 Water Quality Pond 1 ea $5,000.00 $5,000 18 Underdrain 3,050 ea $25.00 $76,250 Subtotal $291,900.00 WATER AND SANITARY SEWER 19 Sanitary Sewer Main (8") 0 20 Sanitary Sewer Main (6") 3,600 21 Sanitary Manholes 3 22 Water Main (8") 900 23 WaterService Line 3,000 24 2 25 4 26 0 - 27 28 rtr w _ 29 30 31 Fire Hydrant Valve and Box Meter Pit (1") Meter Pit (2") Fitting Water Main Connection Water Quality Outlet Structure Lake 1 Overflow Headwall Structure If $30.00 $0 If $15.00 $54,000 ea $2,000.00 $6,000 If $25.00 $22,500 If $5.00 $15,000 ea $2,000.00 $4,000 ea $1,000.00 $4,000 ea $750.00 $0 ea $3,000.00 $3,000 ea $750.00 $9,000 ea $2,000.00 $4,000 ea $4,500.00 $4,500 ea $5,500.00 $5,500 Subtotal $131,500.00 EROSION CONTROL 32 Erosion Control (Fences, netting, bales) 1 Lump Sum $10,000.00 $10,000 Subtotal $10,000.00 ACCESS DRIVE AND PARKING LOT 3-3 Aggregate Road Base 5,730 ton $12.00 $68,760 34 Curb and Gutter (Interior) 1,855 If $8.00 $14,840 Subtotal $83,600.00 SLEEVING 35 Electrical 1,110 If $5.00 $5,550 36 Irrigation 1,180 If $10.00 $11,800 Fossil Creek Park Page 1 of,T Record Drawings/Drainage Certification Subtotal $17,350.00 37 Record Drawings/Drainage Certification 1 lump sum $7,000.00 $7,000 Subtotal $7,000.00 TOTAL 11,213,435 CONTINGENCY 38 Contingency (6.5%) 1 lump sum $78,g79 $78,875 Phase 1b ITEM DESCRIPTION GENERAL REQUIREMENTS 1 &d Bond 2 Mobilization 3 Construction Staking 4 Traffic Control EARTHWORK 5 Dust Control ACCESS DRIVE AND PARKING LOT 6 Pavement 7 Ramps 8 Rail Fence 9 Painted Curb TOTAL 1 292 310 QUANTITY UNIT UNIT PRICE ITEM TOTAL 1 Lump Sum $489, 000.00 $489,000 1 Lump Sum $60,000.00 $60,000 1 Lump Sum $25,000.00 $25,000 1 Lump Sum $5,000.00 $5,000 Subtotal $579,000.00 1 Lump Sum $22,000.00 $22,000 Subtotal $22,000.00 32,700 -Sy $12.00 $392,400 480 sf $8.00 $3,840 2,600 I.f. $8.00 $20,800 if S bttl LEMAY AVENUE MODIFICATIONS u o a $417,040.00 t0 Lemay Trail Underpass 1 Lump Sum $150,000.00 $150,000 FOSSIL CREEK PARKWAY Subtotal $150,000.00 11 Street Improvements 1 Lump Sum $200,000.00 $200,000 MISC SITE LIGHTING Subtotal $200,000.00 12 Parking Lot Lighting 13 Trail Lighting 1 Lump Sum $120, 000.00 $120,000 18 Misc Special Effects 1 Lump Sum $120,000.00 $120,000 15 Secondary Electncal Service, etc. 1 1 Lump Sum $7,000.00 $7,000 13 Smart Controls Lump Sum $15,000.00 $15,000 1 Lump Sum $15,000.00 $15,000 PATHS Subtotal $277,000.00 18 8 Concrete Sidewalk and Paving 77,254 sf 17 12 W Soil Crete Oval trail - 24,366 sf $2.50 $193,135 $2.50 $60,915 DOG PARK Subtotal. $254,050.00 18 Entry Gates 1 lump sum 19 Service Gates 1 lump sum 20 3-Rail Fence with mesh 760 If 21 Relect Crusher -fines 13,300 s.f. 22 23 Lighting Trash receptacles 1 lump sum 24 -' Picnic Tables 1 2 ea. ea. $10,000 $7,000 $11,400 $9,975 $5,000 $600 $1,600 BALLFIELDS Subtotal 528,575.00 25 20 Backstop 2 ea $25,000.00 $50,000 Fossil Creek Park Page 2 of7i. DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET Contact name John C Company Name _Z- E N� <k-z.-� Address Phone Number lglfxc- Vlxelrx CiTl �F F�% �D4 wS Gr2G•ivc c.C/2G p� �i� O'er fyF\ CO[-L71`IS IYA7 12a�U,�C.S 410 2z! (o/oC�S— c ry oro,zl� /%LAN vwG .; /cye"T G„� c G //•� S 221-6616 20 Gx �t�• zyk a 72©-Ziq- caC41r T� ✓ &%.yA�L 22-,unv Lek(//.Y0r6L/�l[,7117(L G�On/Gt7t�/.r �.v� E..Ct C kr✓ c.ol1t,✓3 lv q' -6r,71 z2-2-6o2-Y (?1�1N1 MCIIA(2— 2Z(—(,60 22�-75777 Development Construction Permit, Page 2/5 3. Construction time restrictions: No construction shall be allowed on any Fort Collins — Loveland Water District / South Fort Collins Sanitation District ("District') related facilities until Such time as the District has siened off on the approval of the final development plan documents 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the Aas-constructed@ plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature's r, 1 . P Date: Approval for issuance: 11 1 t `1 City Engineer Approval: C f YI- O Q�L Date: (Permit Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Project A.K.A.: City Staff Contact Persons: Development Engineer: Construction Inspector: Current Planner: Name, address and numbers Fossil Creek Community Park Marc Virata 281 North College (970)221-6605 Lance Newlin 281 North College (970)221-6605 Steve Olt 281 North College (970)221-6750 Water Utilities Engineer: N/A (District) Erosion Control Inspector: Natural Resources: Doug Moore 281 North College (970)221-6750 Traffic Operations: Eric Bracke 625 Ninth Street (970)224-6062 Street closures: Syl Mireles 625 Ninth Street (970)221-6815 Transportation Planning: Kathleen Reavis 215 N. Mason (970)224-6140 Forestry: Tim Buchanan Development Construction Permit, Page 515 281 North College (970)221-6641 Light and Power: Doug Martine 700 Wood Street (970)221-6700 Developer' Contact Persons: Project Manager: Craig Foreman Developer: City of Fort Collins Owner: 215 N. Mason (970)221-6618 (970) 221-6586 (fax) Architect/Planner: Roger Sherman bha Design 4803 Innovation Drive (970)223-7577 (970) 223-1827 (fax) Project Engineer: John Tufte JR Engineering 2620 East Prospect Road Suite 190 (970) 491-9888 General Contractor: Ted Johnson Environmental Concerns PO Box 2135 Loveland, CO 80539 (970)669-6291 (970) 567-2484 (cell) (970) 669-6411 (fax) DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/16/99) For City use only: Application Number: k i 1 _ O/ Application Date: //" / S' --' =1 Permit application fee: $ 300.00 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer at 221-6750 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 No. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): Project A.K.A. (Marketing name if different from Project Name): Project Location: S 6;-1 5UkeD4 LLWAy A✓F Ca1�i. Property Owner(At the time of this permit issuance): Individual Name: c iT> aT fi c itis PAa/c �� o�.n ids : Gam. g.doiNc�7 Company Name: C R.9 L Fitt - Address: 715 /✓ Phone number(s): Office: 6' C i 4' Cellphone: ^�A Fax number: 7- 6 5 Email: e-fu a - -a >'<je� <�-, Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: c Ri4lL I Fo2 n^n,✓ Company Name : ri Address: Z i 5' w //Q` "✓ Phone number(s): Office: 2 21 - 6 6 i g Cellphone: — Fax number: all - 657t36 Email: Permittee (Person who is to sign the Development Construction Permit): Individual Name: <-/2/J/ e 4- Company Name : ' ` " T Address: Z / 5- N 42.o<c Phone number(s): Office: Z z 1- G [. C Cellphone: Fax number: 22-+ - 6 h'L Email c fo ". z 14 �W. ( Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: C f-Z/Ji G F Company Name: <i7r 43F ri Cc oi�1 Address: 7/5 n.u2�N /✓/✓` Phone number(s): Office: 22 1 6 e�i Cellphone: — Fax number: 3 /"t / Email e� c, yc )y-' C. Professional License Number: _� zy 1738 Architect/Planner (The person responsible for the site design of this project) Individual Name: Ig06 C� `/ z� /ZA*14.-J Company Name: Lk, Address: 4-/-eO3 FNNn•�iPT�cev f!%l/�'6 Fig Cc(/i.,r Phone number(s): Office: 72 3- '25 27 Cellphone: Fax number. a-;Z-3 - / F;�2 Email: Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement -add additional names below): Individual Name: C P/7i C e ,"? Company Name : C/7> 0"-' Address: Z/ 5 /t /?14<0 Phone number(s): Office: 2- ! - E-6r N Cellphone: Fax number: Email C f-•...._ v FcI"c'-, General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name: Company Name : Address: Phone number(s): Office: 7o 14 Cellphone: 5-67 Fax number: F 9 - 6 rl / Email: y --, P ve- { c If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Company Name Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Utility contractor: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for flat work: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for structures: Individual Name: Company Name Address: Phone number(s): Office: Cellphone: Fax number: Email: Paving contractor: Individual Name: _ Company Name: — Address: Phone number(s): Office: Cellphone: Fax number: Email: Landscape contractor: Individual Name: _ Company Name: — Address: Phone number(s): Office: Cellphone: Fax number: Email: Other contractors and parties involved in the project: SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"x I I " copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planncr and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project)