HomeMy WebLinkAboutFORT COLLINS WHOLESALE FLORIST SITE - Filed CS-COMMENT SHEETS - 2003-11-03PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: August 15,1997
DEPT: ENGINEERING
QF'1i
PROJECT: Fort Collins Wholesale Florists
PLANNER: Steve Olt
ENGINEER: Dave Stringer
Engineering:
LPlat Sheets - Remove word Final from description title
* Provide easement for driveway access that encroaches onto lot 1 of Collindale Business Park
4th filing
* Access easement for Collindale Business Park 5th filing must come from this site.
2. Sheet 5 of 4 - Show detail of how drainage pans tie into curb and gutter at
driveways,underwalk drains?
* Show limits of asphalt replacement on Caribou Road
* Concrete drive approach to property line
* need access easement for drive approach on east side
* Show retaining; wall elevations, limits and location
* need to provide access to Collindale Business Park 5th filing
* Show City standard details for street repairs, access ramps
Sheet 5 of 5 Acid note " Ultimate limits of asphalt street repairs will be determined by the City
of Fort Collins Engineering Inspector prior to construction of asphalt repair and after service
connects have been made."
Show limits of patching for estimating purposes
PLEASE SEND COPIES OF THE MARKED REVISIONS:
11 PLAT SITE UTILITY ❑ LANDSCAPE
n
REVISION
COMMENT S HEM'
DATE: September 23, 1997 DEPT: Engineering
PROJECT: #18-97 Fort Collins Wholesale Florist - Type I
PDP%FC
PLANNER: Steve Olt
All comments must be recieved no later than the staff review meeting:
Wednesday, October 15, 1997
z.S�Sh°
�r J�K4-0
�
�P
Date: �/o - ! 3 - `3 -7 Signatlue��e _ h
CHECK HERE IF YOU HIT TO RECEIVE COPIES OF REVISIONS
Pig Sid — R — Otba
Ufik _ Redae Uhli _ LmdseVe City of Fort Collins
Commu y Planning and Environmental rvices
Current Planning
City of Fort Collins
October 23. 1997
Roger Thorp
Thorp Associates, PC
P.O. Box 129
Estes Park, CO. 80517
Dear Roger,
Staff has reviewed your revisions for the Fort Collins Wholesale Florist - Project
Development and Final Compliance Plans [combined, under the Land Use Code]
that were submitted to the City on September 22, 1997, and would like to offer the
following comments:
1. Jim Slagle of Public Service Company has offered the following comments:
a. Natural gas main/service may not be installed as shown on Landscape
Plan L-1.
b. Easements appear to be adequate.
2. The Mapping Department offered the following comments:
a. Even though this is only one lot, it must have a lot number.
b. The recording information for the off -site shared access easement must
be shown on this subdivision plat.
C. There is not enough bearing & distance information on the subdivision plat
to locate the on -site and off -site shared access easements.
d. The outer boundary monument on the southeast corner of the property is
not :shown on the subdivision plat.
3. Gary Lopez of the Zoning Department has offered the following comments:
a. It appears that there is an excessive amount of asphalt parking/drives to
support this size of building and land uses.
281 North College Avenue • P0. Box 580 • Fort Collins, CO 80522-0580 • (11711) „1
FAX (970) 221-6378 • TDD (970) 224-t,01C
b. A 5' wide landscaping strip is required along the east property line. The
way the site is designed, the agreed upon shared access easement from
Caribou Road penetrates this property for only about 45' to 50'. This puts
the landscape buffer requirement on the property to the east, when it
develops.
C. At least one more evergreen tree should be added at the front loading
zone drive entrance to screen visibility to the loading area on -site. The
loading and service docks will need to be adequately screened from
adjacent properties.
Please contact Gary, at 221-6760, if you have questions about these comments.
4. Doug Martine of the Light & Power Department stated that street trees need to
maintain minimum clearance to the planned streetlight (as shown on the
enclosed road -lined Landscape Plan). Minimum clearance is 40' for shade trees
and 20' ornamental trees.
5. Kathleen Reavis of the Transportation Planning Department has stated that
off -site sidewalk connections are not required with this development request.
6. Roger Buffington of the Water/Wastewater Department has offered the
following comments:
a. Show fire lines and fire hydrants on the Landscape Plan and maintain the
required landscape/utility separation.
b. Draw the meter pit to scale.
C. Include lengths of DIP for fire lines and fire hydrants.
d. Include a standard general note to encase DIP with polywrap.
e. See enclosed red -lined Landscape Plan and overall utility plans for other
comments.
Please contact Roger, at 221-6681, if you have questions about these
comments.
7. A copy of the comments received from Dave Stringer of the Engineering
Department is attached to this letter. Additional comments are on enclosed red -
lined Site, Landscape, utility plans and easements.
8. A copy of the comments received from Matt Fater of the Stormwater Utility is
attached to this letter. Additional comments are on the enclosed red -lined
drainage report and drainage plan.
The following comments and concerns were expressed at the weekly Staff Review on
October 15, 199T
9. The grading plan shows off -site grading associated with this project. A drainage
easement from the owners of Lot 1 may be needed.
10. The handicapped ramp from Caribou Road connecting directly to the sidewalk
that goes along the east side of the building, as shown on the plans, is not
needed. The ramps at the northwest and northeast corners of the site are
sufficient.
11. The Attorney's Certification on the Site Plan is not needed. The plan includes
a Notary Public certification of the Owner's signature, which is sufficient for the
Site Plan. One or the other is required. An attorney's certification is required only
on a subdivision plat.
12. The Vicinity Map on the Site and Landscape Plans should show Lemay Avenue
as it continues south from Horsetooth Road, around the east side of Warren
Lake, and on south of Harmony Road.
13. Additional landscaping must be included at the northwest corner of the site,
south of the sidewalk, to provide adequate screening of the loading/service area
of the building.
14. Quantities of plant materials are not included in the plant list on the Landscape
Plan. They must be added prior to recording of the document.
15. Materials and colors for the mechanical screens, as shown on the Building
Elevations, must be included on the plan.
16. The body of the building, as shown on the Building Elevations, is labeled as "tilt -
up precast concrete panels". However, the graphic presentation would suggest
that there are at least two different materials and textures, which is preferable for
the City's standpoint. More information should be provided.
17. The galvanized metal downspouts and gutter system, as shown on the Building
Elevations, is to be primed and painted. Painted what color?
This completes the staff comments at this time. Additional comments will be
forthcoming as they are received from City departments and outside reviewing
agencies. The Administrative Public Hearing for this development request has been
scheduled for 6:30 p.m. on Monday, November 3, 1997 in the City Council chambers.
Please return all drawings red -lined by City staff with submission of your revisions
and/or mylars. You may contact me at 221-6750 if you have questions about these
comments or would like to schedule a meeting to discuss them.
Sincerely,
te�&
Project Planner
cc: Engineering/Dave Stringer
Stormwater
Water & Wastewater/Roger Buffington
Transportation Planning/Kathleen Reavis
TST Engineers
Spiro Palmer
File
Commt _ty Planning and Environmental 2rvices
Current Planning
City of Fort Collins
August 26, 1997
Roger Thorp
Thorp Associates, PC
P.O. Box 129
Estes Park, CO. 80517
Dear Roger,
Staff has reviewed your documentation for the Fort Collins Wholesale Florist -
Project Development and Final Compliance Plans [combined, under the Land Use
Code] that were submitted to the City on July 24, 1997, and would like to offer the
following comments:
1. A copy of the comments received from U.S. West is attached to this letter.
2. Jim Slagle of Public Service Company has offered the following comments:
a. The subdivision plat and Site Plan should provide for a 9' wide utility
easement from the back of the sidewalk to the rear line of the utility
easement.
b. No trees are to be planted within 4' of any gas lines.
3. The Mapping Department stated that the distance going south from the East
1/4 Corner, as shown on the subdivision plat, is different from that described in
the legal description on the subdivision plat.
4. Gary Lopez of the Zoning Department has offered the following comments:
a. The parking for the wholesale florist may be categorized as industrial
(employee) parking at 0.75 spaces per employee, unless it can somehow
be considered low intensity retail/workshop at 2 spaces per 1,000 square
feet of leasable floor area. The eventual flex space tenants will determine
whether this development can have as many as 46 parking spaces, but it
would appear that there is too much parking proposed.
81 \wth Colh ge Avenue • 1'0. Boy 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
b. Why is there so much asphalt and why does the sidewalk go down the
middle of the driveway on the west side of the building? Is the 4' wide strip
a concrete drainage channel? It is not labeled on the drawings.
C. Trees are required at 40' on -center in a 5' wide landscaped buffer strip
along the east, west, and southeast corner property lines.
d. Additional landscaped islands are needed in front of the building to break
up the lengths of parking. One tree should be centrally located in an
island/tree well in the tier of 15 parking spaces in front of the flex space,
one tree should be placed in the proposed island in front of the wholesale
florist, and one tree should be centrally located in an island/tree well in the
tier of 14 parking spaces across from the wholesale florist/greenhouse.
e. The loading and service docks will need to be adequately screened from
adjacent properties.
f. A note must be placed on the Landscape Plan regarding completion of
the landscaping or providing 125% of the value of the landscaping prior to
issuance of a building permit.
g. The driveway aisle needs to be 24' in width. The 22' as shown does not
comply with the City's Parking Code for 2-sided loading.
h. The handicapped ramps must be labeled on the plans. Where are the
ramps for the handicapped parking spaces in front of the wholesale
florist?
j. The spaces in the building for future tenants must be occupied by uses
allowed in the E - Employment Zoning District.
Please contact Gary, at 221-6760, if you have questions about these comments.
5. A copy of the comments received from Sharon Getz of the Building Inspection
Department is attached to this letter.
6. Roger Frasco of the Poudre Fire Authority has offered the following comments:
a. The Fort Collins Wholesale Florist project will require an additional fire
hydrant to be located along Caribou Road somewhere near the entrance
to the property, as shown.
b. The 2" fire protection line as shown on the utility plan will require an
engiineer's evaluation to insure that it will meet the fire flow requirements.
The normal size of a fire service line is 6".
C. A secure key box "KNOX BOX", to allow emergency entrance to the
building is required. Please contact Fire Prevention, at 221-6570, for
information and an order blank for this key box.
Please contact Roger, at 221-6570, if you have questions about these
comments.
7. Doug Martine of the Light & Power Department stated that the developer will
need to contact Light & Power Engineering to coordinate power requirements,
the transformer location, and Light & Power development charges.
8. Eric Brake of Traffic Operations stated that the project is okay from a traffic
standpoint; however, the level of service for pedestrians may not be set based
on the required worksheets not being completed. Additional comments are on
red -lined utility plans.
9. A copy of the comments received from Laurie D'Audney of the Water
Conservation Department is attached to this letter. Also, General Information
regarding Water Conservation Standards for Landscaping and Irrigation Systems
is attached.
10. Kathleen Reavis of the Transportation Planning Department has indicated that
it would be advantageous to require that this development construct a sidewalk
to East Horsetooth Road, with a repay agreement when adjacent properties
develop in the future.
11. Roger Buffington of the Water/Wastewater Department has offered the
following comments:
a. Include the standard general notes on the Landscape Plan (i.e., minimum
10' separation from trees and 4' separation from the sewer).
b. Include a note [on the utility plans] to core drill an opening into the existing
manhole for sanitary sewer service.
C. The 2" fire line is to be installed using an 8" x 4" tapping saddle, a 4" gate
valve, and a 4" x 2" reducer.
d. Will the location of the curb stop and meter pit create a conflict with other
utilities? Show the location of electric and gas on the overall utility plan.
e. Clean out covers that are located in traffic areas must be labeled "sewer".
f. It appears that an off -site easement is needed for sanitary sewer service.
g. Additional comments are on red -lined utility plans and a red -lined
Landscape Plan.
Please contact Roger, at 221-6681, if you have questions about these
comments.
12. A copy of the comments received from Dave Stringer of the Engineering
Department is attached to this letter. Additional comments are on red -lined utility
plans.
13. Matt Fater of the Stormwater Utility offered the following comments:
a. Please include a detailed drainage and erosion control report along with
drainage and erosion control plans.
b. Please include all necessary documentation from the Collindale Business
Park report.
C. In the next submittal, it is important to address all necessary criteria which
are listed in the City of Fort Collins drainage criteria. Please refer to the
final checklist for submittal requirements.
d. Further comments will be made when a complete set of plans and report
are submitted.
e. Please address redline comments which have been made on red -lined
drainage report and drainage/utility plans.
Please contact Matt, at 221-6589, if you have questions about these comments.
The following comments and concerns were expressed at the weekly Staff Review on
August 20, 1997:
14. Enhance the landscaping on the south elevation of the building.
15. Trees at 40' on -center are needed in the parkway strip along Caribou Road.
16. Does this proposal meet the minimum 6% interior landscaping for parking lots as
set forth in Article 3, Division 2 of the Land Use Code?
17. More landscaping is needed along the west property line, as per City Code.
18. This site consists of a lot of asphalt areas. More landscape mitigation is needed.
19. Bicycle racks should be added at the entries to the flex space in the building.
20. How is access to Collindale Business Park, Fifth Filing (to the southeast) going
to occur? An easement for this potential access may be needed.
21. An off -site access easement for the shared access with the property to the east
is required at this time.
22. Any rooftop mechanical equipment must be fully screened from view from all
sides, at ground level, and provisions for this must be clearly stated on the Site
Plan and Building Elevations.
23. Is the 4' wide strip of pavement in the driveway intended to be a drainage
channel? If so, it should be labeled as such and the material should be specified.
24. There is a Retaining Wall Section detail on the Site Plan. Where is this wall
located on the site?
25. Note 5 on the Site Plan refers to joint access agreements at the northwest and
northeast corners of the site, with adjacent properties. These access agreements
must be completed prior to final approval being given on this development
proposal.
26. A hazardous materials analysis may need to be done to address the use of
pesticides, etc. on this site. Please contact Ron Gonzales of the Poudre Fire
Authority to discuss the possible need for an analysis. Ron can be reached at
221-6570.
27. What is being done to provide some architectural articulation to the building? It
appears to be all precast concrete, of what color(s)? Some form of masonry as a
base/foundation element, up from the ground to about 3' on all sides of the
building, should be considered.
This completes the staff comments at this time. Additional comments will be
forthcoming as they are received from City departments and outside reviewing
agencies.
Under the new development review process and schedule there is no revision date
mandated by the City. The time spent on revisions is up to the applicant. Upon
receipt, the revisions will be routed to the appropriate City departments and outside
reviewing agencies, with their comments due no later than the third weekly staff review
meeting (Wednesday mornings) following receipt of the revisions. At this staff review
meeting it will be determined if the project is ready to go to the Administrative Hearing
Officer for a decision and, if so, will be scheduled for the nearest open date.
Please return all drawings red -lined by City staff with submission of revisions. You
may contact me at 221-6750 if you have questions about these comments or would like
to schedule a meeting to discuss them.
Sin erely,
S eve Olt
Project Planner
cc: Engineering/Dave Stringer
Stormwater
Water & Wastewater/Roger Buffington
Transportation Planning/Kathleen Reavis
TST Engineers
Spiro Palmer
File
SEP-03-1997 05:43 MATTHEW DELICH PE
co
r3
C
o
Lo
g 6
4 �
r
(.5 o)
o u_
z
w o
N
cc c)
co
o
a
2 0
w w
N d
n
N _
N -
W
dz
w
w
z
U
�. _
W
W g
0
N
W a2f
J
CQ ~
i
TO: Spiro Palmer
Roger Thorp, Thorp
Eric Bracke, Fort C
Steve Olt, Fort Col
FROM: Matt Delich —:tile)
DATE: September 3, 1997
SUBJECT: Fort Collins whole
Business Park, res
(File: 9748MEM2)
This memorandum documer
comments pertaining to the
proposal.
In my traffic study (me
described that there were
that should be filled in w
Business Park develop. I
worksheet" to this memoranc
location area termed "other
only one destination area i
ssociates
llins Traffic Engineer
ins Planning Department
le Florist in Collindale
to comments
my response to item 8 of staff
rt Collins Wholesale Florist
an interactive
areas that would
As noted on the
ve factors meet or
ch are not met are
because of the gap
Timberline Road.
However, when the property to the east develops and builds the
sidewalk along their frontage, both of these factors will
exceed the required level of service for pedestrians.
)randum dated July 15, 1997) I
�e gaps in the sidewalk system
in other parcels in Collindale
five attached a "Pedestrian LOS
n. This area falls into the
Based upon the proposed use,
within 1320 feet of the site.
This is the Sunstone residential area, east of Timberline
Road. It is approximately 1d00 feet from the site. There are
no commercial areas (restaurants, retail, etc.) within 1320
feet of the site. There is 4 sports facility (batting cages)
approximately 400 feet from the site. In my judgment, the
site and the sports facility will not have
affinity. There are no other destination
interact with the propose land use.
"Pedestrian LOS Worksheet," three of the fi
exceed the requirement. The!tiwo factors wh1
continuity and visual intere$t;& amenities,
in the sidewalk between �he site and
IN