HomeMy WebLinkAboutFORT COLLINS SECOND AND HARMONY PUD - Filed CS-COMMENT SHEETS - 2003-11-03City of Fort Collins
PROJECT
COMMENT SHEET
DATE: 3 Feb 92 DEPARTMENT: �inUrf r-'J�
ITEM: 3-90B VILLAGES @ HARIVIONT Y WEST --
LDS Church Preliminary & Final
Please respond to this project by Friday, February 14, 1992
Planner: Kirsten Whetstone
�Auf�'��x'm0ivi, �l�tn�'n art
No Problems y pP rI 0'�
LL' Problems or Concerns (see below)
Z,7
Signature:
CHECK IF REVISIONS REQL71RED:
,D-
s
PLAT
SITE
LANDSCAPE
UTILITY
PLANNING DEPART-IE.VT 2SI NORTH COLLEGE P.O.IIOX 580 FORT COLLINS, COLORADO 80521-0580 (303)221-6750
future parking area. These improvements can be rolled into
the value of the property (lot 2) if and when the property is
sold (see redlined landscape plan).
35. Exchange the Blue Spruce at the east entrance for an Austrian
Pine or other species which will not grow quite as large and
will not: create site distance problems for the eastern
driveway.
36. Staff would recommend the use of a drought tolerant sod/seed
mixture for your turf areas. Staff also suggests that you
look into adding areas of drought tolerant ground cover, such
as spreading junipers or sedun with wood chip mulches, to
reduce the amount of sod and thus reduce your water
requirements. Please indicate your seed mixtures on the
landscape plan.
37. Include a maximum height statement on the architectural
elevations sheet. Please label the elevations (east, west,
north, south). Will the east and west elevations be the same,
as depicted in the top drawing? What will the roof material
and color be? What is the general color scheme of the brick
area?
38. Will the enclosed storage building be brick or of a fencing
material'?
39. Provide additional information about the steeple, since it
extends above the maximum building and structure height limit
of 401. Include information on size, diameter, materials...
40. Include the names of the landscape and architectural firms
that prepared the landscape plan and architectural drawings.
This concludes staff comments at this time. In order to stay on
schedule for the March 23, 1992 Planning and Zoning Board hearing,
please note the following deadlines:
Plan revisions are due March 4, 1992 by 12:00 noon.
PMT's, colored renderings, and 10 prints are due March 13th.
Final mylars and other documents are due March 19th by 12:00.
If you have any questions about these comments or would like to
schedule a time to meet to discuss them, please contact me at 221-
6750.
Sincerely,
Kirsten Whetstone
Project Planner
G I_ A 1= P A S S C, I A 1= S
March 3, 1992
Kirsten Whetstone, Project Planner
City of Fort Collins
281 North College
PO Box 580
Fort Collins, Colorado 80522-0580
Re: The Villages at Harmony West Overall Development Plan Amendment,
and:
The Church of Jesus Christ of Latter -Day Saints
Fort Collins 2 and Future Wards, Fort Collins, Colorado Stake
Preliminary and Final PUD
Dear Kirsten:
The following is an itemized response to the City of Fort Collins review comments
dated February 21, 1992:
Item 1. The name changes have been made as per your request.
Items We have no intention of moving or disrupting the existing ditch that
2, 3, 4, would require an easement change, crossover agreement, or
& 6. improvements to the ditch bed and banks. Review and approval
rights by the ditch company's Board of Directors is understood.
Item 5. The Owner shall take responsibility of weed control in the proximity of
the landscaping shown along the bank. This will enable the Pleasant
Valley Ditch Company maintenance personnel to avoid spraying
4 FF C c7 n C CT _ rnnT I`I n nn r, r,
church landscaping with herbicides.
Item 7. The trail is now indicated on the ODP.
Item 8. The base plan for the ODP has been modified as per your
instructions.
Item 9. Certifications are included on the ODP.
Item 10. Harmony Road access points are now indicated. We do not have
information for the locations of intersections on Regency of
Wakerobin Lane.
Item 11. Cross -access points from the west extension of tract C to Tracts D1
and D2 have been shown. These would only be utilized for uses other
than single family residential or duplex residential units which would
00 have driveway access directly from Regency Drive. Any developed
=s of Tracts D 1 and/or D2 shall not be permitted to utilize the
parking area of Tract C to access Harmony Road. This could be
controlled through signage and/or speed bumps.
Item 12. The policies of the LDS Church specifically prohibit schools or day-
care centers from being conducted in their church facilities. I have
been told by Rick Ensdorf that it would be highly unlikely that a
median would be constructed at this location on Harmony Road. The
intent of the west extension of Tract C is to allow east -bound access
on Harmony Road via Regency Drive in the event that a median is
constructed.
Items The ODP notes have been modified to permit access from Harmony
13& 14 Road. The planning notes listed in item 14 have been included.
Item 15. Land uses for Tracts D 1 and D2 have been modified to match Land
Development Guidance System categories.
Item 16. The building has been reviewed for fire sprinkler requirements; the
building does not require a fire sprinkler system.
Item 17. The lot sizes have been included on the plat.
Item 18. Utility easements as requested have not been added at this time, but
they will be on the final drawings. 41Utt &R -klml
Item 19. The plat has been revised to show cross -access agreements.
- -ter
Item 20. Note: The cross access easement is provided only to be utilized for
uses other than single family residential or duplex residential units
which would have driveway access directly from Regency Drive.
Item 21. A signature block for the Pleasant Valley Ditch Company has been
provided.
Item 22. A street design to the extent necessary to determine that the grades
of our project will work has been prepared by The Engineering
Company.
Item 23. Harmony Road is an improved road with curb and gutter which
increases the value of the land and is reflected in the purchase price
paid by the Owners. We understand the concept and requirement of Flo
Street Oversizing Fees but we do not understand the purpose or
basis for requiring the Owner to also pay for Harmony Road
improvements. Please submit City statutes which clearly define what
is intended with these funds; would they offset the Street Oversizing
fees? Unless this is the case, we regard payment of both the Street
Oversizing fee and the improvement costs of Harmony Road as being
double -charged. 14O
Items Lots 2 & 3 shall be improved by the Owner with the culverting of the
24 & ditch which will greatly enhance the build ability of these two sites.
25. The Engineering Company is currently working with the City Storm
Water staff to develop a plan; information shall follow at a later date.
Therefore the requested improvements of street trees and sidewalks
are not included in our revisions.
Item 26. Revisions have been made on the Utility plans and Plat in response to
comments on those documents.
Item 27. The City may make a request to the LDS Church for shared parking
for trail users, however the liabilities involved would make approval of
the request doubtful without complete indemnification of the LDS
Church by the City of Fort Collins for those who would use the
parking in conjunction with the trail. The issue of Sunday use would
also have to be addressed.
Items Zoning and parking notes have been corrected. The standard
28 & landscape notes are included in the project specifications which are a
29. legal part of the contract documents. It is our objective to not list this
information twice and therefore the notes are not included on the
drawings.
Item 30. The handicapped parking has been relocated to align with the ramps.
Item 31. The City trail will be shown on the final site plans.
Item 32. A parking table shall be included on the final drawings.
Item 33. The sign is indicated on the south building elevation. There is no
monument sign.
Item 34. Lots 2 and 3 are off -lots intended for resale. Therefore improvements
of these lots, beyond the culverting of the drainage ditch should
rightfully be the responsibility of the future purchaser. Please
rernember the discussion of these two lots at the Conceptual Review
indicated it was optional to plat - or not plat - this property at this
time, and acceptance of the "full -platting option" would not require
development fees for the undeveloped property. Likewise, the
undeveloped property should not be required to be developed!
Item 35. The Blue Spruce at the east entrance balances the color, texture, and
density of the spruces planted at the west entrance and it is planted
60' away from the future alignment of Harmony Road. This should not
present a sight/distance problem.
Item 36. A three variety blend of Kentucky Bluegrass was chosen for the lawn
areas because of its visual appeal and its ability to withstand foot -
traffic. Our specifications call for grass seed containing: 70% Crested
Wheat, 15% Tall Fescue, 10% Rye, and 5% Bluegrass to be used for
the temporary lawn area at Harmony Road. There is a $50,000
landscape/irrigation budget for this project. Our estimates indicate we
are at the maximum, and the addition of planting beds would exceed
our budget and increase our maintenance.
Item 37. Additional elevations have been added to reflect all four elevations.
The heights of the building and steeple are shown by corresponding
"elevation heights" with 100' representing ground level. The building
will be roofed with an asphalt shingle in a gray -blue or black. The
brick shall be two tones of light gray. Stucco areas are intended to be
an off-white.
Item 38. The storage building and adjoining trash enclosure shall be brick to
match the building.
Item 39. The steeple is constructed of white fiberglass with a five foot square
base tapering in an elongated pyramid to a peak 38 feet above the
base at a total height of 68 feet above the ground. Due to its narrow
profile and its location on the site, no objectionable shadow shall be
cast by the steeple.
Item 40. The following is a project directory:
Glaser Associates Architects
215 Jefferson Street
Fort Collins, CO 80524
Contact: Kevin Mielbeck
(303) 493-3020
Flatirons Surveying, Inc.
5717 Arapahoe Road
Boulder, CO 80303
Contact: Steven Sellars
(303) 443-7001
Terracon Consultants SE, Inc.
1609 Oakridge Drive
Fort Collins, CO 80525
Contact: Lester Litton
(303) 226-5611
The Engineering Company
2310 East Prospect
Fort Collins, CO 80525
Contact: Rick Pickard
(303) 484-7477
MKF Landscape Design
2005 Evergreen Drive
Fort Collins, CO 80521
Contact: Mary Ferris
(303) 493-1255
Wernsman Engineering
710 11th Avenue
Suite L-60
Greeley, CO 80631
Contact: Steve Wernsman
Architect
Surveying
Soils/Testing
Civil
Landscape
Structural
(303) 353-4463
ACFC Engineering Associates Mechanical
2535 Sherman Hill Road
Laramie, WY 82070
Contact: Jere' Hamilton
(307) 766-2324
Electrical Systems Consultants Electrical
212 West Mulberry Street
Fort Collins, CO 80521
Contact: Mike Wellenc
(303) 224-9100
Spectrum Professional Services Sound Engineer
Suite 806
175 East 400 South
Salt Lake City, LIT 84111
Contact: David Drommond
(800) 678-7077
Very truly yours,
GLASER ASSOCIATES ARCHITECTS
Carl J. Glaser, AIA
cc: Steve Streeter, LDS Church
PROJECT
Citv of Fort Collins
COMMENT SHEET
DATE: ; Feb 92 DEPARTMENT: � _ -
ITEM:3-9oA VILLAGES Cq, AARN10NYtiv-EST--z-P
Please respond to this project by Friday, February 14, 1992
Planner: Sherry Albertson -Clark
No Problems
x
Problems or Concerns (see below)
(1) The Company has a 35 foot easement on the "down side"
rr, of the ditch and a 15 foot easement on the "up side" of the
ditch (measured from the centerline of the ditch) and if the
ditch is moved in any way the Company would require a written
easement to this effect.
(2) Any section of the Pleasant Valley and Lake Canal Company
ditch which is disrupted or moved should be lined and sealed
by the developer, so that the ditch bed and banks are waterproof.
(3) Any work to be done affecting the ditch shall be accomplished
only on those dates agreed upon by the Company.
i 7
(4) Landscaping along the ditch must be done away from the
ditch right--of-way. Weed spraying along the ditch banks could
affect plantings.
The Company reserves the right to provide further comments
and requirements and will require an agreement (continued on back)
Date: 2-14-032 Signature:
CHECK IF REVISIONS REQUIRED: ❑ PLAT
❑ SITE
❑ LANDSCAPE
❑ UTILITY
P I.ANSING DEPARTMENT 2ST NORTH COLLEGE P.O.BOS 580 FORT COLLINS. COLORADO 80522-0590 (30})^27-67S0
PROJECT
—� COMMENT SHEET
City of Fort Collins
DATE: 3 Feb 92 DEPARTMENT: Eryy nur'g
ITEM: 3-90A VILLAGES @ HARMONY WEST -ODP
Please respond to this project by Friday, February 14, 1992
Planner: Kirsten Whetstone
No Problems
Problems or Concerns (see below)
t P
ZV I Cfl&�cU L'�r
,ZAZ e a. g�cN sse s of J�
.� Z i
Date: Zll& /7z— Signature:
CHECK IF REVISIONS REQUIRED: ❑ PLAT D:i nc
❑ SITE
❑ LANDSCAPE
❑ UTILITY
PLANNING DEPARTMENT 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PROJECT
-s City of Fort Collins COMMENT SHEET
DATE: 3 Feb 92 DEPARTMENT: �i r)Urf r'�J
ITEM: 3-90B VILLAGES @ HARMONY WEST --
LDS Church Preliminary & Final
Please respond to this project by Friday, February 14, 1992
Planner: Kirsten Whetstone
No Problems
Problems or Concerns (see below)
Date: Signature:
/, �C
fie' L� �� �b�N %1 vL�t
CHECK IF REVISIONS REQUII2ED:
AL); A z,-dzu,,,4-
�. PLAT -eAyeY vr0
SITE
73 LANDSCAPE
)4 UTILITY
PLANNING DEPARTMENT 281 NORTH COLLEGE P.O.ROX 580 FORT COLLINS, COLOR ADO 80522-0580 (303)221-6750
PROJECT
COMMENT SHEET
Citv of Fort Collins
DATE: 3 Feb 92 DEPARTMENT:��,�,_
ITEM: 3-90B VILLAGES @ HARMOI Y WEST -
LDS Church Preliminary & Final
Please respond to this project by Friday, February 14, 1992
Planner: Kirsten Whetstone
No Problems
X Problems or Concerns (see below)
S'C�� ) Landscaping along the Pleasant Valley and Lake Canal
ditch should be held away from the ditch right-of-way (15 feet
measured from the centerline of the ditch). ;'Weed spraying
does take place on ditch banks which could affect plantings.
2) Are any of the proposed plant varieties fruiting? Water -
born seeds have lately become an issue in some areas.
3) If ditch is disrupted or moved in any way a,crossingj
agreement is required.y
Date: 2 / 14 / 9 2 Signature:
CHECK IF REVISIONS REQUIRED: ❑
PLAT
SITE
LANDSCAPE
UTILITY
PLANNING DEPARTMENT 291 NORTH COLLEGE P.O.BOX 580 FORT COLLIM, COLORADO 30522 0530 (}0})2216750
Developm ` Services
Planning Department
City of Fort Collins
February 21, 1992
Carl Glaser
Glaser Associates
215 Jefferson St.
Fort Collins, CO 80524
Dear Mr. Glaser,
City Staff has reviewed your submittal for The Villages at Harmony
West Overall Development Plan Amendment and the Church of Jesus
Christ of Latter -Day Saints Preliminary and Final PUD, and offers
the following written comments:
1. Please change the title of the Master Plan to "The Villages at
Harmony West- Amended Overall Development Plan". We recently
changed the name of master plans to overall development plans
or ODP's and this will keep our files consistent.
2. The Pleasant Valley Ditch Company has a 35 foot easement on
the "down side" of the ditch and a 15 foot easement on the "up
side" (measured from the centerline of the ditch). If the
ditch is moved in any way the Company would require a written
easement to this effect.
3. Any section of the Pleasant Valley and Lake Canal Company
ditch which is disrupted or moved should be lined and sealed
by the developer, so that the ditch bed and banks are
waterproof. A crossing agreement would be required if the
ditch is disrupted or moved in any way. Please make a note to
this effect on the site plan.
4. Any work to be done affecting the ditch shall be accomplished
on those dates agreed upon by the Company.
5. Landscaping along the ditch must be done away from the ditch
right of way. Weed Spraying along the ditch banks could
affect plantings.
6. The Company reserves the right to provide further comments and
requirements and will require a crossing agreement if the
ditch is altered or affected in any way. Any agreement and
work affecting the ditch itself is subject to review and
approval by the Company's Board of Directors. Please include
this note on the Overall Development Plan (ODP) and on the
site plan.
281 (North Co! Ie_e Avenue • I'.O. flog 250 - FoTC Coliinc. CO '0722-IhSO • 00',) 221-1,7;i
7. The City now has a master planned trail on the east side of
the Pleasant Valley and Lake Canal. Please show this proposed
trail on both the Overall Development Plan and the site plan.
If you have questions, please contact Leslie Bryson at 221-
6367.
8. The base plan that you used for the ODP is out of date (see
redlined ODP for revisions). Please update the uses of the
various tracts and put the names of the two schools and the
park on the ODP. Tract A is single family homes with
townhomes on the one corner. Tracts B, F, G, and H are now
approved for single family lots with the Westbrooke PUD.
Tracts I and E are the sites of 2 schools and a neighborhood
park (Johnson Elementary, Weber Jr. High, and Westfield Park).
(see attached 8 1/2" by 11" ODP plan of the previous amendment
to this toaster Plan for land use information.)
9. Please include an Owner Certification and a Planning and
Zoning Certification on the ODP.
10. Please show the existing or approved street intersections on
Regency Drive and Wakerobin Lane. Also show the proposed
Harmony Road access points on the ODP.
11. Please show the cross access points (for access to Tract D
from Tract C) on the ODP and on the overall site plan. It is
important to show how Tract D will get access when it is
developed. Show an access point for lot 3 (north half of
Tract D) off of Regency Drive and/or from the future parking
area. Transportation is concerned that lot 2 (south part of
Tract D) have access to Regency at a shared point with Tract
C because no access will be allowed off of Harmony Road.
Transportation also has concerns that future development of
Tract D not use the main church parking lot to access Harmony
Road.
12. The two access points on Harmony Road are acceptable as long
as the church remains just a church. Any added uses, such as
schools, day care centers, etc. would require further review
by the City. You should be aware, that in the future, there
may be a median in Harmony Road which may restrict turning
movements at your driveways. There are no plans for a median
at this time, but given the proximity of the site to the
interseczion of two major arterials, it is a future
possibility.
13. Review the existing notes on the ODP, it appears that note #Is
6 and 7 no longer apply.
14. Add the following notes to the ODP:
* Existing zoning is rlp, low density planned residential.
* Tracts A, B, E, and I are shown as previously approved and
are not controlled by the applicant for this amendment.
* Tracts C and D, as shown on the previously approved amended
Overall Development Plan, are being amended with this plan.
* The proposed land uses and densities shown on this plan are
estimates of development potential. Approval of this Overall
Development Plan by the City does not constitute final
approval of these land uses, design or densities. Rather, any
future land uses must be approved according to the procedures,
processes and criteria of the Planned Unit Development
Regulations and other relevant City policies and standards.
15. Land uses for Tract D should match the Land Development
Guidance System categories, ie. Business Service Uses, Auto
Related... and then specifically exclude certain uses. It
appears that your list of intended uses does match the
Business Service Uses category, therefore the words "Business
Service Uses" should be included in the definition of proposed
service uses. It is fine to list some uses, but use the
wording: uses such as or including the following uses:...
Please see the attached Business Service Uses definition, if
you want to specifically exclude any of those uses, please add
them in your list of exclusions.
16. The building size, construction type, occupancy use, and
amount of open area within the church may require a fire
sprinkler system. Please contact Warren Jones at 221-6570 for
a review of the construction drawings.
17. Include the lot sizes, in square feet, on the plat.
18. Include a 10' utility easement across the north property lines
of lots 2 and 3. Continue the 10' utility easement along the
west property line of lot 3 to the north property line.
19. The access, utility, and drainage easement shown on the plat
does not match the angled future parking lot on the site plan.
Perhaps you could move the easement line to the north (see
redlined plat) and indicate the entire area as an easement.
20. Provide •cross access easements for lots 2 and 3 so that they
can share access on Regency.
21. The ditch company will have to sign off on the plans for
grading that affects the ditch. Please provide a signature
block for them.
22. A street design for Harmony Road will be required to assure
that the driveways and ditch crossing work. Please submit
Harmony :Road profiles and cross sections with the design.
23. The Developer must escrow for the cost of any improvements
that will be delayed. Or, the developer may construct the
required improvements on Harmony Road, when the church is
constructed.
24. Staff questions the build ability of lot 2 given the 70'
drainage easement, the cost of piping the flows to increase
the buildable area, and the access situation. Staff is
requiring that improvements on Harmony include the frontage on
lot 2, including sidewalks and landscaping, as a guarantee
that there improvements are in and the landscaping is maturing
in the event that lot .2 is not developed, or is developed in
the distant future.
25. Staff is also requesting that the developer complete sidewalk
and landscaping improvements for lot 2 along Regency Drive.
The City will arrange for a payback agreement to be written so
the developer can be reimbursed by the future developer for
the cost of improvements on Lot 2. Or the owner may wish to
roll costs of improvements into the price of the property when
it is sold.
26. See additional comments on the Utility Plans and Plat.
27. Would the church allow "shared parking" with trail users
accessing the future Pleasant Valley and Lake Canal trail?
28. Correct the site plan note #3 to reflect that the zoning is
rlp, low density planned residential not commercial.
29. Note #6 should say no "on -street" parking. Attached to these
comments are samples of typical notes for site and landscape
plans. Please include these notes on your plans.
30. The Commission on Disabilities suggest that the handicapped
accessible ramps be relocated or the parking be restricted in
those areas to prevent conflict between parked cars and ramp
users. It works best if the ramps don't face directly onto
parking stalls.
31. Show the proposed City Trail on the east side of the Canal, on
both site plans.
32. How many parking spaces are being provided? Indicate which
ones are Handicapped spaces. What will the square footage and
the occupancy be for the assembly hall? This will help
determine whether you have provided sufficient parking.
Motorcycle and bicycle parking should be shown as per City
code. A table showing number of parking spaces and types
would be helpful.
33. Show, on the site plans, where the proposed sign will be.
Will there be a monument sign out front?
34. The landscape plan has a good mix of deciduous and evergreen
trees and shrubs. The variety and flowering elements should
result in a spectacular array of textures and colors.
Continue the turf grass and street trees along Harmony Road to
Regency Drive and along Regency Drive to the curb cut for the