DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 99-31 Issuance Date: : 0 -7 — y J
Project Name: Fort Collins - Loveland Water District Headquaters
Project Location: Snead Drive
Permittee: Fort Collins - Loveland Water Dis
trict
City and developer contacts: See attached Exhibit "A"for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application)
Construction Inspection Fee (paid prior to issuance of this permit)
Excavation Permit fees
Erosion Control Fee ( see reciept attached)
$150.00
1$ 169.00
$ 700.00
Total $ 2019.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
Waived by City Engineer
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: Normal Hours as allowed by City Code
19.
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated
value of all public infrastructure improvements that will be constructed and accepted by the City to
own and maintain. In addition provide the value of all private infrastructure improvements that the City
will inspect and require certification for. The estimate shall be in the same format as the attached sheet
titled "Project Quantities and Cost Estimate Sheet."
Public infrastructure, estimated cost:
Private infrastructure, estimated cost:
I certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if
necessary, to enter upon such property to perform work required of the applicant if the applicant were to
fail to perform the required d+ork, a
may,,
Applicant Signature:_ / , . b� Date: 1
09/22/99 WED 13:24 FAX 970 491 9984 JR ENGINEERING
lj� 002
oNC
Z V
ioON
IpOO INoMOl
CM
Io�f�
J
U
O6606
R7
N'H
I
VWWLL
CL
N
Z
EA (R EA 69 (n
fA
i
fn Vf
N
4A fAlfH
fAj
�W
j
H
o 0 0 0 0
10 p0
OO O
O 7�
ch rn�Im�I
O 0.
16,ci o
1010
W W
N
!
LLZ W
I
I I
pl0lo0
O
IO O
'O
O
O
0
0 0
00
0
O
'O
N
W
OGjO
IOiN 0,..010
0
OI
N�
O0 0
O
0
a1IN0
O
NI
M
i-
O
U
0 r. O'O'
co N.m inW
M
I-
000
a
O
O
a)'cfl!N
9O
O
M
R
O
N
�
M
i
Z I
F
V
a:
Q
Q
OI
R
Z
-
O
F
�.��.
III
v
Z
I
d3 Y3 En
I
...
in
Irn
F H
Q
�I, �r
N fJ �i�''
o �,
a p
NV
W'
Z
F �
I
W
N OI
W
-
I
W
(lO
W
WI
a Ir
o
wN
LLIL
iL'r'aa
LLa'
ru
v�
h
M
Q
J _J 0 W W .,.
I J
W
U) J J
�W
U
Z W
III
¢
QF
7m
I
>
w,
w
m
�
n w
ola
Z
Q O
w
Z
IW
3U
J
z
wLu
U
Z
D
I
W
W.
W
J
Q
a
w.Z11I
a
Ila
I¢
>
OJ
UC7
p
��
Z
w
¢
�=
IQ
C7 wIZ
Cc O a
f11
k-.Z
�'dl
'wl
N.
Cl
F
(n'
J
'_ ¢ W
(.i.O'LL
?
J
W
wI
a. 'I
w IJI
�.
Z
3
W J
�_w
a J
w
J
u'�I�
O.Z
w
W
W
w ~ w Q
Q
Q
0
uiwau;I0
F..YI_.
WIJ'W'Q
J
J J
¢ia
F
WZ
�a5E
¢zzc
oo
�'_,�
CC
wzwH
w!vw:w~
Q
zow
¢>w
¢ JZ LLJIZ';m
�w�
m
OC
..z
pm
h
i- O
0
0I,p
H
u~iloj�iOU
ZI,�IIN
'..<
¢ �.N
fol
(-) U)l;a
ai,
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, Whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. Aii extension may be granted for up to six months.
7. Building permits and certificates of occupancies will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D)of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans and the
"as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
See Exhibit A ( attached ) for contact persons during construction
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter
upon such property to perform work required of the applicant if the applicant were to fail to perform
the required work. I also acknowledge that I have read this permit document with all its requirements
and conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature: �11-
iu•, Date: fC
Approval for issuance:
City Engineer A
l0/7
(Permit Is4aan6e Date)
��4 'ai T 14
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(1/7199)
For City use only. Application Number. Application
Permit application fee:
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary
documents and submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer
at 221-6750.
3. Submit the Application and pay the Application Fee at the fee at the Engineering
counter at 281 No. College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
L�- tHS - LO✓C
Project A.K.A. (Marketing name if different from Project Name):
Project Location:
Property Owner(At the
Name:
Address: 9(
Phone number(s):
Office: _
Cellphone: _
Fax number:
Email:
of this per;nit issuance):.
22&- 310
12TM
Applicant/Project Manager (The primary contact person for all matters regarding this project, and
the person responsible for all matters referencing "the Developer" in the Development Agreement for
this project): -7— I ,
Name: � � "/10� •) � . Lt � (1 o
Address :
Phone number(s): v
Office: 2-Z(,p 1511b
Cellphone: -$M
Fax number. 27,- 1
Email:
E.<11-ty,-1T 4
Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person
responsible for the design of this project, responsible for certification that improvements are
constructed in accordance with approved plans, responsible for making revisions to plans with City
approval and for providing as -constructed plans):
Name: eV-\C1✓1.PP.171n¢
Phone number(s): Office: �� I
` 0 U
Cellphone:
Fax number:
Email:
Professional License Number:
Developer (The party or parties referenced in the Development Agreement who are responsible for the
Developer's obligations contained in the Agreement -add additional names below):
Name:
Address:
Phone number(s):
Office:
Email:
General
Cellphone:
Fax number:
actor (�ca ontra for in overall ch �e of the public infrastructure construction):
Name: 'l Vl ✓1 ry C,� D ✓-\
Address: 'k52- LomW1e6CC Uri*
Phone number(s): q1
Office: 1S 7 J
Cellphone:
Fax number:
Email:
If you have no General Contractor, list all other contractors below.
Grading contractor:
Name:
Address:
Phone number(s):
Office: _
Cellphone:
Fax number:
Email:
Utility contractor:
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(1/7/99)
For City use only: Application Number: L- s JqApplication Date: )/ 9
Permit application fee:
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary
R
documents and submit to the Development Engineering Section of the City.
If you have any questions contact the Development Engineer
at 221-6750.
Submit the Application and pay the Application Fee at the fee at the Engineering
counter at 281 No. College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
L
✓L 1-AT-1
Project A.K.A. (Marketing name if different from Project Name):
Project Location:
Property Owner(At the time of this perput issuance):.
Name: �_ ob I L If45 - >1aA%
Address: `l'1UU 5. C tl le<fL a4? .
Phonenumber(s): n, ,—
Office: L- UJ
Cellphone: _
Fax number:
Email:
! i7 -v-T
Applicant/Project Manager (The primary contact person for all matters regarding this project, and
the person responsible for all matters referencing "the Developer" in the Development Agreement for
this project): �-
Name: l./ V617�'� -1A 1
Address: "Sy30 S. U0I1CUe Hye
Phone number(s):
Office: 2.Z.(10 " 5 Cb
Cellphone:
Fax number: LZ l
Email:
Z5
Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person
responsible for the design of this project, responsible for certification that improvements are
constructed in accordance with approved plans, responsible for making revisions to plans with City
approval and for providing as -constructed plans):
Name �• �_. �V C JI.PPJ) one
Phone number(s): ' I �O Q��j
Office: 1 'D D
Cellphone:
Fax number:
Email:
Professional License Number:
Developer (The party or parties referenced in the Development Agreement who are responsible for the
Developer's obligations contained in the Agreement —add additional names below):
Name:
Address:
Phone number(s):
Office: _
Cellphone: _
Fax number:
Email:
General Contractor contra for in overall ch
Name: V (-
Address: V5E Vhn'leJ(t= fir,
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
of the public infrastructure construction):
If you have no General Contractor, list all other contractors below.
Grading contractor:
Name:
Address:
Phone number(s):
Office: _
Cellphone:
Fax number:
Email:
Utility contractor:
2
Name:
Address:
Phone number(s):
Office: _
Cellphone: _
Fax number:
Email:
Concrete contractor for flat work:
Name:
Address:
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Concrete contractor for structures
Name:
Address: _
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Paving contractor:
Name:
Address:
Phone number(s):
Office: _
Cellphone: _
Fax number:
Email:
Landscape contractor:
Name:
Address:
Phone number(s):
Office: _
Cellphone: _
Fax number:
Email:
Other contractors and parties involved in the project:
3
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
• 81/2"xl 1" copy of the Site Plan
• Proposed Project Schedule
• Project quantities and cost estimate for all of the public improvements to be constructed.
In addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
❑ Traffic control plan(s) for the project
❑ Proposed haul routes shown on a City map
0
Shop drawings
Other
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to
discuss plans and special requirements for your project, is required for all development projects. The
people required to attend the meeting are the Project Manager, Project Engineer, Developer,
Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of
the contractors expected to work on this project)
People to Attend: List the peoples names and titles for those who will attend the pre -
construction meeting:
Name Title