Loading...
HomeMy WebLinkAboutFIRST INTERSTATE BANK DRIVE THRU FACILITY PUD - Filed CS-COMMENT SHEETS - 2003-10-30PROJECT COMMENT SHEET City of Fort Collins DATE: 7 July 92 DEPARTMENT:��; ITEM: 92-84H First Interstate Bank Drive Through Facility (Fountainhead PUD) Please respond to this project by Friday, July 17, 1992 Planner: Steve Olt No Problems )— Problems or Concerns (see below) CA. �, r�w�►PS shown . `'1' Y1OJ ✓wry rn'�"i �i �� ��x� 340 Date: -1/1 ,� I , 2 Signature: Y'A IW-4� CHECK IF REVISIONS REQUIRED: ❑ PLAT ❑ SITE ❑ LANDSCAPE UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.ROX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT 46 PROJECT COMMENT SHEET City of Fort Collins DATE: 7 July 92 DEPARTMENT: Zl r l��f ITEM: 92-84H First Interstate Bank Drive Through Facility (Fountainhead PUD) Please respond to this project by Friday, July 17, 1992 Planner: Steve Olt z— No Problems Problems or Concerns (see below) Date: 7- F, IY Signature: CHECK IF REVISIONS REQUIRED: ❑ El PLAT SITE LANDSCAPE UTILITY DF.VELOPNIFNT SERVICES 2,.91 NORM COLLEGE P.O.ROS 580 FORT COLLINS, COLORADO 80522-0580(303)221fi750 PLANNING DEPART MENT PROJECT COMMENT SHEET Citv of Fort Collins DATE: 7 July 92 DEPARTMENT: 1wlq -T/o ITEM: 92-84H First Interstate Bank Drive Through Facility (Fountainhead PUD) Please respond to this project by Friday, July 17, 1992 Planner: Steve Olt No Problems Problems or Concerns (see below) 1126-44C -ScF PC-,¢r — . 6u7-E2 nJauNo,9ay I-46Ah)M6-A17-J — p • /1 T'N/J A 6i.16 G n ?w o GoT • THE OFF f,RtMC-nr- 0-a7-h`C /rTE21�.✓, 20 /S /-/[= TNcS �P N c' h O F 77N 1��i041U (rL 7D r-M �r A-1097- ) AC ,-1e7- 14L- GUAcL- AL/�-r0 72) ,�TL47- • LIF.SC/2IpT/el}-/ • % llE % /TC.E /S &)2aPI 7,4/1 /J 4 /oq. 7- Dr- rn0rl 7-Hi4A, LpTZ �T� %ir`AO, �f L4SN 7- 7 4E TTL L= /IJ T-/7L- Lou/c /(- i91s//T- PLAT SITE LANDSCAPE UTILITY Vez'`aS 7a PLANNING ENT SERVICES 2.41 ,0R111 COLLEGE P.O.11OX580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PL:ANNINO DF:YART>i F;N"f PROJECT City of Fort Collins COMMENT SHEET DATE: 7 July 92 DEPARTMENT: ITEM: 92-84H First Interstate Bank Drive Through Facility (Fountainhead PUD) Please respond to this project by Friday, July 17, 1992 Planner: Steve Olt No Problems 4 Problems or Concerns (see below) g;dwu,al kn �� A0 SU,ss w 1'�5�o✓I�ii� Date: �/ f 2 Signature: t—A / CHECK IF REVISIONS REQUIRED: ❑ PLAT ❑ SITE ❑ LANDSCAPE V UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO80522- 0580 (303)221fi750 PLANNING DEPARTMENT Commu-=ty Planning and Environmental Cervices Planning vepartment :ity of Fort Collins July 23, 1992 Stephen J. Steinbicker The Neenan Company 2290 East Prospect Road Fort Collins, CO. 80525 Dear Steve, Staff has reviewed your submittal for the First Interstate Bank Drive-thru Facility, Final (Fountainhead P.U.D., Phase 1 - Lot 2 Replat), and would like to offer the following comments: 1. The Site Plan shows 4 identification signs. Only 3 signs are allowed between the two lots, 2 on the north lot and 1 on the south lot. 2. Light & Power has indicated that minor adjustments may be necessary the to make the proposed electric transformer location more accessible to their line trucks. Please contact Doug Martine at 221-6700 to coordinate the transformer location. 3. The City Mapping/Surveying Department has numerous comments about the subdivision plat. A copy of the comment sheet is attached to this letter. The redlined plat and a copy of the comment sheet has been sent to your engineer. 4. The redlined utility plans with comments from Water/Wastewater have been sent to your engineer. 5. This request will be evaluated against either the Business Service Uses point chart or the Auto Related and Road Commercial point chart in the Land Development Guidance System. A point chart was not submitted at this time. Please provide a filled out chart as soon as possible. 6. The reference to the signage on the Site Plan should be expanded to specify existing signage in the Fountainhead P.U.D. and note, in some form, that signage will be restricted to the number, type, and location as shown on the P.U.D. plans. We can discuss the exact wording that should be included on the Site Plan. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80722-0580 • (303) 221-67 0 7. General Note 6 is incomplete. The notes referred to from the approved August, 1982 plan must be transferred to and become a part of this current plan. 8. What type of lighting, both freestanding and exterior building fixtures, is being proposed for this site? Detailed information, possibly in the form of manufacturers "cut sheets", must be submitted for review. The LDGS is very specific about potential glare and off -site light spillage. 9. A copy of the Stormwater Utility comments is attached to this letter. 10. A copy of Engineering's comments is attached to this letter. 11. The building materials do not appear to blend with the existing Fountainhead office building. More information is needed on the concrete panels and the metal canopy system is totally different from anything presently in the entire center. Additional information should be provided on the size, height, and scale of the building. The elevations should accurately reflect the proposed signage, as this is what will dictate the allowable signage. 12. The overall site appears too tight. The relationship of the drive-thru stacking lanes to the streets is much too close, without adequate buffering. Additional plant materials and berming should be provided to mitigate the visual impacts. 13. The City is recommended a fescue sod/seed mix for reduced water consumption. 14. Motorcycle and bicycle parking spaces should be shown on the Site Plan. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on the agenda for the August 24, 1992 Planning and Zoning Board hearing: Plan revisions are due August 5, 1992 by 12:00 noon. Please contact me for the number of revisions required for each document. PMTIs, renderings, and 8 copies of final revisions (for the Planning and Zoning Board packets) are due August 17, 1992. Final documents (including the signed development agreement, applicable mylars and utility plans) are due August 20, 1992 by 12:00 noon. Please contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. Aly, Project Planner xc: Kerrie Ashbeck Sherry Albertson -Clark Stormwater Utility Transportation file/Project Planner