Loading...
HomeMy WebLinkAboutFIRST FREE WILL BAPTIST CHURCH PDP - Filed CS-COMMENT SHEETS - 2003-10-30PROJECT COMMENT SHEET City of Fort Collins BUILDING PERMIT REVIEW DATE: February 21, 2003 DEPT: i��1►� K PROJECT: First Free Will Baptist Church — A plat for this site was submitted previously and is due on a different date. The separate submittal is because they are reviewed under two different processes. Note this (utility plan review) will not be in DMS. All comments must be received by Sheri Wamhoff no later than: March 19, 2003 ❑ No Problems _,04roblems or Concerns (see below or attached) Comments: 1. Insert the legal description under the title. Lot 1 First Free Will Baptist Church. 2. Remove notes 1 and 12 from the cover sheet. Note 1 is already covered by note 3 and note 5 on the general notes on the next page. Note 12, the Ridgewood Hills design is not valid for this site. The street classification and width has changed since that design was done. 3. Add indemnification statement to the cover sheet. 4. Per PFA a minimum 6 inch fire line is required unless hydraulics will support a 4 inch. 5. Instead of labeling the plans as interim and ultimate please call them Phase 1 and Phase 2 as that is how they will be referenced by us when utility/ grading permits are issued. Sheet 7, which shows phase 2, states it is for reference only. If phase 2 plans are for reference only, phase 2 will not be approved with this submittal and would need to be submitted for review and approval at the time Phase 2 is desired. It would then be subject to the code and criteria at the time of submittal. 6. Identify the driveway width. 7. Master improvement plan (phase 2) —The curb and gutter shown on the south side of the road is not correctly shown, based on the Ridgewood Hill plans and the Good Samaritan plans. In accordance with those plans the curb and gutter is located 35 feet from the section line. The row seems to be shown incorrectly as well. 8. The Ridgewood Hill design for Trilby Road that was referenced is no longer a correct design for this Roadway (the design was for a 4 lane arterial roadway the designation at that time — the current designation is a 2 lane arterial). In lieu of havin is project provide the design for Trilby Road at this time, � Date: `l !/l 3 Signatures PLEASE SEND COPIES OF MARKED REVISIONS Plat (Site Utility l7Landscape ❑Drainage Report 0 NO COMMENTS -SUBMIT MYLARS PAGE 4 April 21, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado frontage of this property. To do a design now, the design of the intersection of College and Trilby would need to be done in order to determine the transition lengths and location to be able to determine where the location of the curb and gutter would be on this site. " R The improvements for Trilby Road that were previously shown on the Phase 2 plans have been removed per meeting with Sheri Wamhoff. The exact location of curb, gutter and walk are undetermined at this time in lieu of the intersection design at College Avenue and Trilby Road. 9. "If Ili e sidewalk along Trilby is to be put in with this project, in lieu of putting up funds for its future construction it will need to placed at the back of the row. " R Per the tnceting with Sheri Wamhoff, it was decided to not build the sidewalk with this project so that the walk could be placed properly with respect to the location of the curb and butter. In addition, the proposed landscaping in this area will not be shown on these plans and will be determined when design of Trilby Road has been finalized. 10. The emergency access driveway -A 6 inch gravel section will probably not work. This needs to support 40 tons and thus probably needs to be a compacted road base. PFA wants a masinuum 6% grade used on the access drive. Is the cross pan to be installed with the gravel drive? It is shown in the profile, but not shown on the phase I sheets. The emergency driveway needs to be crowned or drain to one side. Draining to the center is not an acceptable section. " R The emergency access drive will not be used as a fire access. A separate fire access has been provided in the existing parking area. The access driveway will be temporary until Phase 2 is implemented and at that time will be paved. A 3' valley pan has been added in the drive to assist in drainage and will flow to the 3' cross pan. The 3' cross pan is now included in Phase I improvements. 11. "Need more elevations provide at the access drive to determine what the drainage flows do. Drainage is not allowed to flow out the driveway. " R Additional spot elevations have been provided at the driveway. 12. "Is the parkin', area to have cnrh and gutter? At the driveway entrance if the row line is the high point and the parking area has curb and gutter, need to show how the curb will transition down: to "0" height at the row line. If the row line is not the high point of the drive then there cannot he curb and gutter from the high point out to the street (no concentrated flow is allowed). It would need to be a concrete or asphalt edge only. The driveway connection to the street should be shown as asphalt. It will be rebuilt in concrete when the Trilby Road iniprovenuents are done, but as we do not know what the elevations of those improvements are to he it doesn't stake sense to pour it in concrete now. " PAGE 5 April 21, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado R The parking area cru-rcntly has curb and gutter. The row is the high point and the curb at this point already transitions to "0". The existing drive is concrete to the existing edge of asphalt; however, the radius transitions will be asphalt until Trilby Road improvements are done. 13. `Zabel the Trilby Road section as "Possible Ultimate Trilby Road Section "Do to transitions that will be required within this section of roadway it is verypossible that the width will vary caul be wider than this along portions or all of the property. " R The Trilby Road section has been removed from the plan set since its final design is undetermined at this time. 14. "Use current detail 2201. " R Detail 2201 has been added to the detail sheet. 15. `If the sidewalk is to be installed with this project provide ramp truncated dome details for the ADA ramps, ramp details and high volume driveway detail. R The sidewalk is not going to be installed with this project. 16. "See plans for additional comments. " R All redlines have been addressed. STORMWATER UTILITY 1. 'Please revise scale on sheet 12. " R Acknowledged: Scale has been revised. 2. "The new 2002 Fossil Creek Drainage Master Plan requires detention for the 100 year storm and to release at the 2-year historic rate. This site is releasing at the 10-year historic flow rate. Please revise to release at the 2-year historic rate. " R AcknoMe4ed: Done. 3. `Please correct basin boundaries to include separate basins for off -site flows, see drainage plan. It is not required to detain off -site flows, however they, have to be included in the design to pass these flows through the site and detention pond spillway. The detention pond should be sized to hold only the runoff from the site with the hydrology calculations (TOC/intensities, areas, C factors) reflecting developed site conditions. " R Offsite basins have been delineated, and the flows have been determined in accordance with each. The detention pond is now sired for onsite detention only with a 2-yr historic release rate. PAGE 6 April 21, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado 4. "Please revise the time of concentration calculations. In house calculations showed the maxinuan overland travel time to be about 300ft and the travel time length for channelized flow about 350ft. " R Acknowledged: The time of concentration for "Design Point a" has been revised. 5. "Using equation Tc = L/180+10 from the Urban Drainage and Flood Control District yields lower values for time of concentration. Please revise runoff calculations if needed. " R Acknowledged: The note in the runoficalcnlations has been revised accordingly. 6. 'Please indicate whether or not existing utilities are being removed or abandoned. " R On sheet 4, the existing utilities will remain in place, since the road improvement design for Trilby Road has not been achieved yet. 7. "Please add Finished Floor elevation to building on grading plan." R Acknowledged: Done. S. 'Please state class of RCP pipe to be used for storm sewer, type III is required for pipe in the right-of-way. " R Acknowledged: Done. 9. 'Please add a basin summary table and a detention pond summary table to the Drainage Plan." R A design point runoff summary table has been added to the Drainage Plan. 10. 'Please add a spillway to the detention pond and provide a cross-section of this on the Drainage Plan. " 1� A spillway to the detention pond Will not be required, since the outf ll pipe in the 4'x4' outlet box for the detention pond is capable of conveying an additional 100-yr storm for onsite and offsite flows. 11. 'Please revise the water quality orifice plate calculations. " R Acknowledged: Done. Please note that row 2 of the water quality orifices has only one column. 12. 'Please add drainage easements for detention pond and 100-year conveyance elements. See plat. " PAGE 7 April 21, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado R Acknowledged: Done. 13. "Please see water quality outlet structure detail comments on sheet 13. Please call Wes Lamarque at 416-2418 for any questions. R The water quality and orifice plate detail for the detention pond has been revised in accordance with the changes from previous comments and the 4'x4' box detail has been provided for adequate inforniation. 14. `Please revise the water quality volume calculation to include the factor of 1.2. See drainage report. " R Acknowledged: Done. 15. "Please revise rating curve table in the water quality section to match the other table in the detention section. See drainage report. " R Acknowledged: Done. 16. "Afield visit discovered that the side road ditch in which the detention pond will temporarily drain to flows into the irrigation ditch to the east. The outfall for the pond can not drain into an irrigation ditch directly or indirectly. The flows may have to be piped across the irrigation ditch to the Tvman property, where a drainage easement already exists. R A swale has been implemented into the plan set to convey the 100-yr onsite and offsite flow across the Louden Ditch. NATURAL RESOURCES 1. "The landscape plan needs to provide a plant schedule listing the Fort Collins native grass species including the radio and rate in which the seed will be applied. " R Acknowledged: Done. 2. "New landscaping added to the project needs to be Fort Collins native plat species. (see attached pkntt list). R Acknowledged: Done. 3. "Additional landscaping east of the proposed building, drive lane, and parking is needed to provide screening from the activities associated with these issues. " IZ Acknowledged: Done. PAGE 8 April 21, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado 4. "Construction activity needs to be limited during Ferruginous Hawk winter night roosting season (October 15`1through March 15`h) and during the Redtailed Hawk nesting season (March 15`h through July 15`h). " R Acknowledged: Done. 5. "The project needs to show a 50-wildlife movement corridor along the ditch on and adjacent to the eastern side of the property and fencing and vegetation is needed to compliment this activity. " R Acknowledged: Done. 6. "Trash dumpster areas should be designed to accommodate recycling services and includes necessary vegetative screening." R Acknowledged: Done. 7. "Drought tolerant species of turf such as Fescue or Bn ffalograss should be considered for new areas of turf and for replacement of existing turf. " R Acknowledged: Done, PLANNING 1. "Street canopy trees will need to be planted along Trilby Road, within the "tree lawn" created by the detached sidewalk (between the curb and sidewalk). " R Street canopy trees are along Trilby Road for concept only as the design for Trilby Road is undetermined at this time. 2. "Existing vegetation will need to be labeled as such on the site plan." R Acknowledged: Done. 3. 'Parking information will need to be provided with the site plan. This use has a minimum manber of required spaces, which is based on 1 space per 4 seats in the auditorium or principle place of worship, 2 spaces for every 3 employees, or I space for 1,000 sq. ft. of floor area, whichever tlyields the greatest number. " R Acknowledged: Done. 4. "The landscape plan will need to demonstrate screening of the parking lot from Trilby Road. " R Acknowledged: Done. PAGE 9 April 21, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado 5. "A sidewalk connection will need to be included, from the sidewalk on Trilby Road to the building entrance. " R Acknowledged: Done. We trust that this response has addressed all of your specific comments and concerns. If you have any questions or further comments during your next detailed project review, please call at (970) 226-5334. Sincerely, Carole Prieskom Shear Engineering Corporation cc:Roger Raper; First Free Will Baptist Church. cc: Mikal Torgerson City of Fort Collins PROJECT COMMENT SHEET BUILDING PERMIT REVIEW DATE: APRII. 24, 2003 DEPT: ComCast (AT&T Cable) PROJECT: First Free Will Baptist Church — A plat for this site was submitted separately and is due on the same date. The separate submittal is because they are reviewed under two different processes. Note this (utility plan revle%�),v�ill not be in DtiIS. _411 comments must be received by Sheri Tfamhol -no later than: Ma% 7.2003 IgNo Prooiems C Proclems or Conc.rns s.. hello« or attached) Y „ A frF fVil n�`' Date: �L7 Z�3 Signature: ���'�i70D�2[I_it1� PLEASE SEND COPIES OF MARKED REVISIONS IN -Plat 5�Site ❑ Utilin N -Landscape ❑ Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS PROJECT COMMENT SHEET City of Fort Collins BUILDING PERMIT REVIEW DATE: APRIL 24, 2003 DEPT: Engineering PROJECT: First Free Will Baptist Church — A plat for this site was submitted separately and is due on the same date. The separate submittal is because they are reviewed under two different processes. Note this (utility plan review) will not be in DMS. All comments must be received by Sheri Wamhoff no later than: May 7, 2003 ❑ No Problems ❑ Problems or Concems (see below or attached) 1. Repeat - Need more elevations provide at the access drive to determine what the drainage flows do. Drainage is not allowed to flow out the driveway. Spot elevations shown do not provide enough information to show that the high point is at the row line. 2. Repeat - At the driveway entrance if the row line is the high point and the parking area has curb and gutter, need to show how the curb will transition down to 0" height at the row line. If the row line is not the high point of the drive then there can not be curb and gutter from the high point out to the street (no concentrated flow is allowed). Also will need to show where a curb cut exists for the parking lot drainage to get to the pond along the edge of the access drive. 3. See plans for additional comments. 4. Need confirmation from PFA that they do not need to access around the building. If they do the gravel drive will need to be compacted road base with a maximum grade of 6% as previously indicated. 5. See separate plat submittal for comments on the plat. 6. Add patching note to sheets 4 and 6. 7. Per Peter Barnes comments the sidewalk connection needs to be put in with Phase 1, show correctly on the utility plans. 8. How does the drainage get out of the south side of the parking lot? Per the grade lines it gets trapped in the parking lot by the curb and gutter. (continued on next page) Date: � ( Signature PLEASE SEND COPIES OF MARKED REVISIONS 0 Plat Site Utility Kandscape ❑ Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS 9. Add the following note to sheet 10 (or something similar): Future Trilby Road drainage to be brought into this maintenance hole when street improvements are done and an inlet installed in Trilby Road. 10. Need to put the trash enclosure detail on the site or landscape plans not the utility plans. 11 The cost estimate submitted has not yet been reviewed as an estimate that includes the street design has not been submitted. 12. Site plan - Need to show and label the curb stops to be installed on the parking stalls abutting the narrow walkway. If the site plans are to be the same sheets as the master improvements plans in the utility plan set we will need two mylar copies of this sheet as the site and landscape plans are fled separately from the utility plans. 13. A draft development agreement will be provided once language has been received from the various departments. Development Review Comments — Page 2 First Free Will Baptist Church April 24, 2003 Please note that the Engineering Department has asked this project not to design and construct Trilby Road at this time. In lieu of designing and constructing it at this time we will be requiring them to put up money for the design and construction cost of Trilby Road adjacent to the site. We felt this was the best thing to do until we have a design for the College Trilby intersection, as we do not know exactly where the curb and gutter will need to go until we have more design provided for the area. Please let me know if you have any questions. Sheri Wamhoff City of Fort Collins 221-6605 the development will include the design costs within the amount to be contributed to cover the design and construction cost for Trilby Road for the frontage of the property. To do a design now the design of the intersection of College and Trilby would need to be done in order to determine the transition lengths and location to be able to determine where the location of the curb and gutter would be on this site. 9. If the sidewalk along Trilby is to be put in with this project, in lieu of putting up funds for its future construction it will need to be placed at the back of the row. 10. The emergency access driveway — A 6 inch gravel section will probably not work. This needs to support 40 tons and thus probably needs to be a compacted road base. PFA wants a maximum 6% grade used on the access drive. Is the cross pan to be installed with the gravel drive? It is shown on the profile, but not shown on phase 1 sheets. The emergency driveway needs to be crowned or drain to one side. Draining to the center is not an acceptable section. 11. Need more elevations provide at the access drive to determine what the drainage flows do. Drainage is not allowed to flow out the driveway. 12. Is the parking area to have curb and gutter? At the driveway entrance if the row line is the high point and the parking area has curb and gutter, need to show how the curb will transition down to 0" height at the row line. If the row line is not the high point of the drive then there can not be curb and gutter from the high point out to the street (no concentrated flow is allowed). It would need to be a concrete or asphalt edge only. The driveway connection to the street should be shown as asphalt. It will be rebuilt in concrete when the Tribly Road improvements are done, but as we do not know what the elevations of those improvements are to be it doesn't make sense to pour it in concrete now. 13. Label the Trilby Road section as "Possible Ultimate Trilby Road Section' Do to transitions that will be required within this section of roadway it is very possible that the width will vary and be wider than this along portions or all of the property. 14. Use Current detail 2201. 15. If the sidewalk is to be installed with this project provide ramp truncated dome details for the ADA ramps, ramp details and the high volume driveway detail. 16. See plans for additional comments. Development Review Comments — Page 2 FOR F COLLINS-LOWIAND WATFR DISTRICT G April 28, 2003 Ms. Sheri Wamhoff City of Fort Collins P.O. Box 580 Fort Collins, CO 80525 RE: First Free Will Baptist Church Dear Ms. Wamhoff, j0 SOUTH PORT COLLNS SANHWHON DISTRICC The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned project and submit the following comments. The District approval block needs to be corrected to indicate Terry W. Farrill, P.E., District Engineer. The District requires a minimum and maximum cover over the water line of 5 and 6 feet, respectively. All contrary references need to be corrected as necessary. All water line and sanitary sewer line construction shall conform to the District's most current construction specifications and requirements. All contrary references need to be corrected as necessary. The existing meter pit is to be relocated at least 3 feet from the proposed sidewalk. The standard concrete thrust block typical is to be corrected to indicate a minimum test pressure of 150 psi. The previous version of the typical should be discarded. The District requires meter pits for non-residential projects. The curb stop typical is to be removed. Trees and significant landscaping arc not to be located within 10 feet of District facilities. Please do not hesitate to contact me at 226-3104, ext. 14, if you have any questions or require additional information. Respectfully, GCi Mr. T W. Farnll, P.E. District Engineer xc: Mr. Michael D. DiTullio, District Manager Shear Engineering 5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186 First Free Will Baptist Church Comments (5-7-03 The walk in front of the handicap parking stalls needs to be widened to a minimum of 6 feet or wheel stops need to be installed that prevent cars from overhanging into the walk. The current walk width which appears to be 3' to 3'6" is barely ADA compliant and would not be able to accommodate a wheel chair if the cars overhung into the walk. Signature: ; yam!" / Date: �- - i May 20, 2003 Project No. 1785-01-00 City of Fort Collins, Engineering P.O. Box 580 281 N. College Ave. Ft. Collins, Colorado 80522-0590 Attn: Sheri Wamhoff, P.E. Re: First Free Will Baptist Church; Fort Collins, Colorado Response to Comments Dear Sheri, SHEAR This is a response to the most recent City of Fort Collins review comments concerning First Free Will Baptist Church noted in your correspondence dated May 7, 2003. We are providing pictures of the existing drive and parking area to help clarify our responses to certain comments. The Site and Landscape Plans are now being provided as separate documents. ENGINEERING: I_ Repeat - Need more elevations provided at the access drive to determine what the drainage flows do. Drainage is not allowed to flow out the driveway. Spot elevations shown do not provide enough information to show that the high point is at the row line. R Additional elevations have been added at the access drive to represent actual grading and drainage conditions. Runoff does not flow out the driveway- The actual high point of the drive is located at the future back of walk 8' south of the right-of-way. That design was based on the assumption that West Trilby Road would be a minor arterial according to current minor arterial street standards (42.00' half right-of-way). 2. Repeat - At the driveway entrance, tf the row line is the high point and the parking area has curb and gutter, need to show how the curb will transition down to 0" height at the row line. if the row line is not the high point of the drive then there can not be curb and guiler from the high point out to the street (no concentrated flow is allowed). Also will need to show where a curb cut exists fir the parking lot drainage to get to the pond along the edge ofthe access drive. R The parking area does have curb and gutter. The transition from full height curb to 0" curb height is now shown. A curb cut exists for the parking lot drainage to get to the pond along the edge of the access drive. The curb cut is now clearly represented and labeled. See pictures. 3. See plans. for additional comments. R Acknowledged: Plan comments have been addressed. 4836 S. College, Suitc 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineeringxom PAGE 2 May 20, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado Response to Comments 4. Need confirmation from PFA that they do not need to access around the building. 1f they do the gravel drive will need to be compacted road base with a maximum grade of 6% as previously indicated. R Acknowledged: We have been unsuccessful at getting a return call from Ron. We hope you have heard from him. But you may not have. We have drafted a statement and faxed that to Ron to see if he concurs. We have asked Ron to fax a signed copy of that statement back. A copy of that faxed document is attached for your immediate reference. If Ron provides us with a signed copy, we will provide that to you immediately for your files and documentation. 5. See separate plat submittal for comments on the plat. R Acknowledged: Plat comment responses are provided with this correspondence. 6. Add patching note to sheets 4 and 6. R Patching notes have been added to both sheets. The note reads as follows: "Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering inspector. All repairs to be in accordance with City Street Repair Standards". 7. Per Peter Barnes comments the sidewalk connection needs to he put in with Phase 1, show correctly on the utility plans. R The sidewalk has not been added to the phase 1. It is our understanding that the sidewalk may be installed with Phase 2 according to a decision in a recent meeting between you, Peter and Roger. S. How does the drainage get out of the south side of the parking lot? Per the grade lines it gets trapped in the parking lot by the curb andguller. R Curb openings exist to allow stormwater to exit. All curb openings are now clearly represented and labeled on the plans. See pictures. 9. Add the following note to sheet 10 (or something similar): Pulure Trilby Road drainage to be brought into this manhole when street improvements are done and an inlet installed in Trilby Road. R A note similar to the one above has been added as directed. PAGE 3 May 20, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado Response to Comments 10. Need to put the trash enclosure detail on the site or landscape plans not the utility plans. R The trash enclosure detail has been removed from the utility plans. It has been added to the Site Plan. 11. The cost estimate submitted has not yet been reviewed as an estimate that includes the street design has not been submitted R The cost estimate provided has been revised since the last one provided. Our base course unit cost was inaccurate. The cost estimate is based on developer responsibility of a local section including 13' of pavement, curb and gutter and 4.5' wide detached sidewalk. The pavement section depths were as recommended by Earth Engineering Consultants Inc. in the subsurface exploration report for First Free Will Baptist Church titled "Subsurface Exploration Report First Free Will Baptist Church Improvements", E.E.C. Project No. 1032009; report dated February 3, 2003. The type R inlet that would be required, based on Wes Lamarque's comments, is also included. R We have not included an engineering fee in the estimate. We would request that you reconsider the engineering fee associated with a new arterial design. The church has already paid for West Trilby Road designs in our fee for the current project. The project had been designed based on the West Trilby Road profiles provided by RBD Inc. Engineering Consultants in the Final Utility Plans for Ridgewood Hills P.U.D. First Filing titled "Final Utility Plans for Ridgewood Hills P.U.D. First Filing, RBD Inc. Project No: 014-047' City of Ft. Collins Director of Engineering approval date 05/10/95. The cross sections provided with the RBD plans were modified to meet the street width for today's minor arterial standard. Our design was completed based on a West Trilby Road buildoutto current minor arterial standards. We were asked to remove the West Trilby Road ultimate condition representation from our plans. The site will now accommodate a standard minor arterial width. It will also accommodate a wider section should accel or decal lanes be implemented in the ultimate West Trilby Road design. 12. Site plan - Need to show and label the curb stops to be installed on the parking stalls abutting the narrow walkway. If the site plans are to be the same sheets as the master improvements plans in the utility plan sel we will need two mylar copies of this sheet as the site and landscape plans are filed separately from the utility plans. R We have created 2 entirely new Site Plan sheets incorporating the appropriate land use data, signature and approval blocks, etc. according to the requirements of the Land Use Code. The curb stops to be installed on the parking stalls abutting the narrow walkway are shown and labeled on both the Site Plans and the Master Improvements Plans. PAGE 4 May 20, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado Response to Comments 13. A draft development agreement will be provided once language has been received from the various departments. R Acknowledged: Please e-mail your initial draft as soon as it is available. E-mail to bshea_r_sheareneineering.com. FINAL PLAT: 1. Information within the utility plans seems to indicate that this property was previously planed as .Yhyview Subdivision 3rd Filing. If it was, the legals need to indicate that. le. being a replal of... l was told the subdivision was vacated If it was, was the r.o.w. vacated also Please provide documentation to show that the SO foot 112 r.o.w. is all currently dedicated. R A copy of the "Findings and Resolution concerning Vacation of Skyview South, Third Filing Subdivision" is attached for your immediate reference and file documentation. This document is recorded in Larimer County Records. Please note on Page 0290, that the right- of-way for West Trilby Road adjacent to the site was not vacated. A copy of the Skyview South, Third Filing Subdivision final plat is also attached for your immediate reference and file documentation. Note that the West Trilby Road half right-of-way is 50'. 2. Add the lines round the notice or otherwise make the statement more prominent. R A heavy line now borders the notice note to make the statement more prominent. 3. It appears that the development agreement required 3 signatures, so 1 will assume that the plat will as well. R Thank you for providing the specific names for signature on the development agreement. The signature blocks on the plat have been updated so it is consistent with the development agreement. TRANSPORTATION PLANNING: 1 the walk in front of the hatidicap parking.stalls needs to be widened to a minimum of 6 feet or wheel slops need to he installed that prevent cars from overhanging into the walk. The current walk width which appears to be 3' is barely ADA compliant and would not he ahle to accommodate a wheel chair if the cars overhung into the walk. R Wheel stops are now shown on the Utility Plans and the Site and Landscape Plans. PAGE 5 May 20, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado Response to Comments STORMWATER: R Stormwater comments were addressed directly with Mr. Wes Lamarque. WATER AND SANITATION DISTRICT: R Water and Sanitation District comments were addressed directly with Mr. Terry W. Farrill. A copy of the response letter to Terry Farrill is attached. We trust that this response has addressed all of your specific comments and concerns. If you have any questions, please call at (970) 226-5334. Our goal of course, is to achieve complete approvals without another round of review. We would appreciate the opportunity to meet with You and go over each comment to assure that each comment has been satisfactorily addressed. Sincerely, Brian W. Shear, Shear Engineerit attachments cc: Roger Raper; First Free Will Baptist Church Mikal Torgerson, MTA Architects Bryan Short; Frederick Land Surveying Bob Barkeep; City of Fort Collins Planning May 20, 2003 Project No. 1785-01-00 Fort Collins - Loveland Water District South Fort Collins Sanitation District 5150 Snead Drive Ft. Collins, Colorado 80525 Attn: Terry W. Farrill, P.E. Re: First Free Will Baptist Church; Fort Collins, Colorado Response to Comments Dear Terry, This is a response to your most recent comments concerning First Free Will Baptist Church noted in your correspondence dated April 28, 2003. • The District approval block needs to be corrected to indicate Terry W. Farrill, P.E., District Engineer. R The approval block has been revised accordingly. You can be assured that this same revision will apply to all future projects requiring District approvals. • The District requires a minimum and maximum cover over the water line of 5 and 6 feet, respectively. All contrary references need to be corrected as necessary. R The reference to water line cover in the Master Utility Plan General Notes on the Master Utility Plan, has been revised. • All water line and sanitary sewer line construction shall conform to the District's most currcrrl cons7rucliorl specifications and requirements. All contrary references need to be corrected as necessary. R The reference to most current District construction specifications and requirements have been revised on the supplemental general notes on the Cover Sheet and on the Master Utility Plan General Notes on the Master Utility Plan. The notes have been revised as follows: "All sanitary sewer construction shall conform to the most current South Fort Collins Sanitation District Construction Specifications and requirements". "All water distribution system construction shall conform to the most current Fort Collins - Loveland Water District Construction Specifications and requirements". 4836 S. College, Suite 12 Fe Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com PAGE 2 May 20, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado Response to Comments The existing meter pit is to be relocated at least 3 feel from the proposed sidewalk R Sheri Wamhoff has requested that we remove all reference to the ultimate West Trilby Road improvements. West Trilby Road is designated as a minor arterial according to the City of Fort Collins Master Street Plan. However, Sheri has noted that there may be accel and decal lanes in this area. We have added a note concerning the separation requirement at the time West Trilby Road is constructed to ultimate improvements. The note is incorporated into Construction Note 10 on the Master Utility Plan and is provided as follows: NOTE: Existing water meter to be relocated at time of West Trilby Road construction of ultimate improvements. Meter pit must be relocated 3' from proposed sidewalk. The standard concrete thrust block typical is to be corrected to indicate a minimum test pressure of 150 psi. The previous version of the typical should be discarded R The concrete thrust block typical has been corrected to indicate a minimum test pressure of 150 psi. • The District requires meter pits for non-residential projects. the curb stop typical is the be removed. R The curb stop typical detail has been removed. • T seen and significant landscaping are not to he located within 10 feet of District facilities. R All trees are 10 feet or greater away from District facilities. The Master Utility Plan General Note regarding a 10 foot separation has been revised from: No trees shall be located closer than 10 feet from any water service or sewer service or mains. to: No trees or significant landscaping shall be located closer than 10 feet from any water service or sewer service or mains. PAGE 3 May 20, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado Response to Comments We trust that this response has addressed all of your specific comments and concerns. If you have any questions, please call at (970) 226-5334. Brian W. Shear, P.E. Shear Engineering C BWS/cp cc: Roger Raper; First Free Will Baptist Church Mikal Torgerson; MTA Architects Bryan Short; Frederick Land Surveying Sheri Wamhoff, P.E.; City of Fort Collins Engineering Bob Barkeen; City of Fort Collins Planning City of Fort Collins PROJECT COMMENT SHEET BUILDING PERMIT REVIEW DATE: February 21, 2003 DEPT: AT&T BROADBAND PROJECT: First Free Will Baptist Church — A plat for this site was submitted previously and is due on a different date. The separate submittal is because they are Eo reviewed under two different processes. Note this (utility plan review) will not be in DMS. R NNG PP�NT Q�p,N All comments must be received by Sheri PVamhoff no ler than: March 19, 2003 ld No Problems ❑ Problems or Concerns (see below or attached) Comments: Date: Signature:/eBi9ty4 PLEASE SEND COPIES OF MARKED REVISIONS 5� Plat Site 11 Utility K Landscape ❑ Drainage Report 0 NO COMMENTS -SUBMIT MYLARS City of Fort Collins PROJECT COMMENT SHEET BUILDING PERMIT REVIEW DATE: MAY 21, 2003 DEPT: Engineering PROJECT: First Free Will Baptist Church — Note this (utility plan review) will not be in DMS. All comments must be received by Sheri Wamhoff no later than: June 3, 2003 ❑ No Problems .0'Problems or Concerns (see below or attached) 1. Repeat — At the Driveway on the east side one elevation reads top of concrete. What does that mean? Is it top of curb? It makes a difference. Otherwise adequate elevations have been provided. Need more elevations provide at the access drive to determine what the drainage flows do. Drainage is not allowed to flow out the driveway. Spot elevations shown do not provide enough information to show that the high point is at the row line. 2. See separate plat submittal for comments on the plat. 3. A draft development agreement will be provided once language has been received from the various departments. 4. The emergency access easement going into the site needs to be 20 feet wide, please show as such on the utility, site and landscape plans. 5. Identify the land use data on the site plans as to which Phase it applies to. 6. Note on sheet 7 regarding the sidewalk from the building out to Trilby road needs to be deleted. Per the site plan this walk is to be installed with Phase 2 not when the Trilby Road sidewalk goes in. /I 1Z Date: �Z ; le-3Signatur : � — PLEASE END'COPIES OF MARKED REVISIONS 0 Plat 0 Site 0 Utility 0 Landscape 0 Drainage Report 0 COMMENTS -SUBMIT MYLARS PROJECT COMMENT SHEET) BUILDING PERMIT REVIEW DATE: February 21, 2003 DEPT: EXCEL ENERGY PROJECT: First Free Will Baptist Church — A plat for this site was submitted previously and is due on a different date. The separate submittal is because they are reviewed under two different processes. Note this (utility plan review) will not be in DMS. All comments must be received by Sheri Wamhoff no later than: March 19, 2003 ❑ No Problems ❑ Problems or Concerns (see below or attached) Comments: A)dRESJf 3Z0 W TRItG� RLJ • F_'/.ISTIN6 GA: _%F li E LIES 424' E. OF F.=6M'T£1LN17-I01V GR AND WAS INSTAHF0 /AL A STRAIGHT I -ME TC) TftF MFTI,'R DAI THE WF.ST WALL, EVSTINC, SEiWirE 11 314' MA✓. 6EVElJOR6 Obl EXLST1M6 d- FUTURE G-Ai LOA6S — THIS L",v`,'r_C /9A/ &EjFf� TO r iF RE.I�It'I'u='FT', 71 A Lht7tL'n> V9 SVC, WE WILL N(fFb TD PtI01./ ?DTAL FLITVRF LOAI3. 77HV )QEIALFDRCEMFL`FT WGLILA V E HT OLUAJF.RS-XYWNISE. Date: 2-2 ?-Q_? Signature: �,lEN d/LD��R Pr3�1/� a� �i8-CIS PLEASE SEND COPIES OF MARKED REVISIONS ❑ Plat 0 Site ❑ Utility 11 Landscape 11 Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS FORT COLLINS-LOVELAND WATER DISTRICT v March 17, 2003 Ms. Sheri Wamhofl� Planner City of Fort Collins P.O. Box 580 Fort Collins, CO 80525 RE: First Free Will Baptist Church Dear Ms. Wamhoff, SOUTH FORT COLLINS SANITATION DISTRICT MAR 1 8 2003 The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned project and submit the following comments. The District approval block is to be corrected to indicate Mr. Terry W. Farrill, P.E., District Engineer. The supplemental general notes #2 and #3 are contrary to the general notes 45 and # 13 on sheet 2 of 17. The District requires a Back -Flow -Prevention -Device, with flow detection, on the fire line. Locating the sanitary sewer service under the detention pond is not recommended. The service line depth appears to be less than the manufacturer's recommendations. Sheet 6 of 17 shows the installation of a manhole for the service line connection contrary to sheet 5 of 17. The connection is to be made by tapping the existing sanitary sewer line. The standard concrete thrust block typical on sheet 16 of 17is to be corrected to indicate a minimum test pressure of 150 psi. Please be advised that the fire line is tested to minimum pressure of 200 psi. Please do not hesitate to contact me at 226-3104, ext. 14, if you have any questions or require additional information. Respectfully, Mr. TerryW. Farrill, P.E. District Engineer xc: Mr. Michael D. DiTullio, District Manager 5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186 First Free Will Baptist Church Comments (3-19-03) Please provide street improvement plans with the next submittal. Make sure to include sidewalk details, parkway with landscaping plans, curb & gutter, and a roadway signage & striping plan. 2. Building entrance needs to be connected to the sidewalk along Trilby without crossing a drive way or drive aisle. Please provide a walkway connection in the next submittal. 3. At locations where cars overhang onto the walk the width of the walk is required to be 6 feet in width, or wheel stops located in the parking stalls that prevent cars from overhanging into the walk. 4. Please locate a bike rack near the building's entrance in a visible secure location with an access ramp from the parking lot to the rack. Signature: April 21, 2003 Project No. 1785-01-00 City of Fort Collins, Engineering P.O. Box 580 281 N. College Ave. Fort Collins, Colorado 80524 Attn: Sheri Wamhoff Re: First Free Will Baptist Church Phase 1; Fort Collins, Colorado Response to Comments Dear Sheri, This is a response to the most recent City of Fort Collins review comments concerning First Free Will Baptist Church Phase 1 noted in your correspondence dated March 12, 2003. POWER Power Conditions (Additional Information Requirements for Complete Application — Resubmittal Required) 1. "Light and Power will need a Commercial Service Form from the electrician showing the current electrical load and the proposed electrical load. " R Acknowledged 2. "Need a site plan and utility plans showing transformer location and proposed electric service to the transformer. Power will tonne from Trilby Road and will be underground. " R Acknowledged: The existing transformer and the new underground service are now shown on the plans. 3. "Electric Development Policies and Charges will apply. " R Acknowledged 4. "Show existing transformer location on utility plans. And proposed location if trans former is to be relocated. Show the proposed route for the electric service (to be provided by the City of Fart Collins) front w. Trilby Road to the transformer location. This service must maintain 10' clearance fi-om water and sewer lines. R Acknowledged: See response #2 above. POUDRE FIRE AUTHORITY 1. "If a fire lane is required it shall be required to be platted as an "Emergency Access Easement " on the final plat.. " 4836 S. Collcgc, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com PAGE 2 April 21, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado R Acknowledged: A fire emergency access is being provided on the plat. 2. "The temporary gravel road shall be compacted road base and able to support 80 tons. " R The building is now serviced with a 6" fire line and the temporary gravel road is no longer a Fire access. A fire access casement is now being provided in the existing parking area. 3. "Is it possible to obtain a 6% grade as opposed to an 8% grade along the north section of the temporary gravel road?. " R See response above. TRAFFIC OPERATIONS 1. "Master and Interim Improvement Plans should include master and interim dimensioning. Please dimension existing and improved future roadway widths, access drive widths, etc. " R Acknowledgcd. Dimensioning has been added to both Phase 1 access drive improvements and Phase 2 access drive improvements. Improvements to W. Trilby Road have been removed per Sheri Wamhoff. The timing of improvements to W. Trilby Road is undetermined at this time, as well as the exact determination of the location of these improvements. EXCEL ENERGY 1. "Gvisting gas service lies 424' east of E. Constellation Dr. and was installed in a straight line to the meter on the west wall. Existing service is % "mw. Depending on existing & fiture gas loads, this service may need to be reinforced to a linger 1-114" service. YVe will need to know total future load. This reinforcement would be at the owners expense. " R The total future load for this addition is not anticipated to be greater than what currently exists; however, the owner is investigating total future loads. AT & T BROADBAND 1. "AT & 7' Broadband would like to see a utility easement granted on all sides of the property. " R A 10, utility easement is being shown on the east side of the property and a 15' utility easement is being shown on the south side of the property. There are currently 20' foot utility easements on both the north side and the west side that were dedicated with Skyview South First Filing. PAGE 3 April 21, 2003 Project No. 1785-01-00 Re: First Free Will Baptist Church; Fort Collins, Colorado ENGINEERING Insert the legal description tinder the title, Lot I First Free Will Baptist Church" R Acknowledged: Legal description has been added. 2. "Remove notes land 12 from the cover sheet. Note 1 is already covered by note 3 and note 5 on the general notes on the next page. Note 12, the Ridgewood Hills design is not valid for this site. The street classification and width has changed since that design was done. " R Notes 1 and 12 have been removed from the cover sheet. 3. "Add indemnification statement to the cover sheet. " R The indemnification statement is now on the cover sheet. 4. "Per PFA a min imunn 6 inch fire line is required unless hydraulics will support a 4 inch. " R The lire line has been changed to a 6-inch line. 5. "Instead of labeling the plans as interim and ultimate please call them Phase I and Phase 2 as that is how they, will be referenced by us when utility/grading permits are issued. Sheet 7, which shows phase 2, states that it is for reference only. If phase 2 plans are for reference only, phase 2 will not be approved with this submittal and would need to be submitted for review and approval at the time Phase 2 is desired. It would then be subject to the code and criteria at the time of submittal. " R The interim and ultimate plans have been relabeled as Phase 1 and Phase 2. 6. "Ident fv the driveway width. " R The driveway width has been dimcnsioned. 7. "Master improvement plan (phase 2)-The curb and gutter shown on the south side of the marl is not correctly shown based on the Ridgewood Hill plans and the Good Samaritan plans. In accordance with those plans the curb and gutter is located 35 feet from the section line. The row seems to be shown incorrectly as well. " R The curb and gutter and row on the south side of the road have been corrected to reflect the appropriate distance from the section line. 8. "The Ridgewood Hill design for Trilby Road that was referenced is no longer a correct design for this Roaahvar (the design was fora 4 lane arterial roadway the designation at that time -the current designation is a 2 lane arterial). In lieu of having this project provide the design for Trilby Road at this time, the development will include the design costs within the amount to be contributed to cover the design and construction cost for Trilby Road for the