RE: Detention Pond in Cunningham Corner Five Oaks Village P.U.D.
Dear Eldon:
The administrative change request for modifying the detention pond
in Five Oaks Village at Cunningham Corner for Desyn Homes has been
Approved with conditions. These conditions are as follows:
1. The City's Stormwater Utility is willing to take ownership and
maintenance of the pond if the vegetation is a dryland grass
mixture. The plan does not indicate what this grass mix will
be. Please provide a mixture on the plan.
2. City ownership is also contingent upon removing the berm
between the subject pond and the Sundisk pond.
3. The trees and shrubs presently shown on the berm should be
relocated to a more advantageous location.
4. The concrete pans shown on the original plan will need to be
built and maybe modified if the berm is removed.
5. Any modifications to the grading of the pond or the
swale/concrete pan location must be revised on the approved
utility, grading and drainage plans.
Please note that the City Stormwater Utility typically requires
plant material to reach a certain maturity prior to taking over
ownership and maintenance of a detention pond. For further
information, please contact Glen Schlueter or Rodney Albers at 221-
6589.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
PLANNING OBJECTIVES
FIVE OAKS
at
CUNNINGHAM
The townhomes of Five Oaks Village are
P.U.D. located at South Shields Street
site is Parcel A of the Master Plan and
sity of 8.1 DU/AC.
VILLAGE
CORNER
the third phase of Cunningham Corner
and Cunningham Drive. The 9.65 acre
contains 78 units for a gross den -
The Site Plan of Five Oaks Village consists of five residential clusters
containing 14 to 16 units each. Vehicular access is generally provided
from internal private drives allowing for a major landscape buffers between
building clusters and between townhomes and the single family neighborhood
to the north. Unique to Five Oaks Village is the introduction of a series
of small wet and dry ponds and footpath system which effectively links
townhome clusters and larger landscape areas to a picnic and recreation
amenity within Tract H retention area.
The existing retention area will be reshaped with the construction of this
project to incorporate more open area within Five Oaks Village and thereby
form a uniform site plan. The drainage swale serving the retention area
is proposed to meander in a more natural configuration to allow an even
distribution of landscaping along the existing neighborhood property line.
The townhomes consist of three unit types: two bedroom flat, two bedroom
two story unit, and three bedroom two story unit. Each townhome will con-
tain a one or two car attached garage and an enclosed patio. The architec-
tural treatment will be similar to the first two phases of Cunningham
Corner which used hardboard siding, high pitched roofs, and brick feature
walls.
The proposal is in compliance with the Fort Collins adopted policies on
growth management. Specific policies includinge Land use, Site Planning,
and Urban Design Criteria shall be developed to promote pleasant, func-
tional and understandable interrelationships through and between land uses.
Residential areas should provide for a mix of housing densities.
Higher density residential uses should locate:
Within close proximity to Community or Neighborhood park facilities
Where water and sewer facilities can be adequately provided
Within easy access to major employment centers
With access to public transportation
In areas with provisions for alternative modes of transportation.
Construction of the first building cluster is scheduled to begin Fall of
1985.
TO: Tom Gathman, City of Fort Collins
t'i /N
FROM: Brian Miller, E.I.T., Taranto, Stanton & Tagge Consulting
Fingineers
DATE: November 14, 1985
SUBJFX_T: Meeting on the Detention Pond, Cunningham Corner (11/13/85).
Participants: Suzanne Bassinger, Brian Miller, Taranto, Stanton & Tagge,
and Tom Gathman, City of Fort Collins
The following was addressed during the meeting:
1. The detention pond
volume calculated by HYDRA was less than the
volume (4.6 ac-ft)
calculated
by SMI with a
run Tom developed.
Ton used the areas
and slopes
presented in the
HYDRA output.
HYDRA determined a 2.2 ac-ft pond, greater in volume than the 0.8
ac-ft pond recommended in the Master Plan, Table 6 Foothills
Basin (Basin 6) Drainage Master Plan.
2. HYDRA calculations determined that 42% of the rainfall reached
the pond. Tan felt the loss of 58% of the volume of rainfall was
too high and that HYDRA must not be. accounting for all the
volume.
Conservation of mass calculations provided that only 3.1% of the
rainfall was not accounted for in HYDRA on this run of the
program.
3. The previously existing retention pond had come close to
over -topping in the past with less than 100-year storms. Tan
also mentioned that people he had questioned, said that the pond
had no water in it to start with and the antecedent moisture
condition may have been dry.
Suzanne indicated that people in the area had said that the pond
normally had a swampy bottom and frequently had standing water in
it. Also, a retention pond is sized on intercepting 100% of the
runoff volume whereas a detention pond is sized on routed volumes
and would inherently be a lesser volume.
4. Percent impervious values from several Master Plans were
considerably higher than the values used in the HYDRA nun.
The p.=ent impervious values for HYDRA were calculated as
recommended in the manual.
TARANTO, STANTON & TAGGE
Consulting Engineers
748 Whalers Way • Building D • Fort Collins, CC 80525
(303) 226-0557 • Metro Denver Number (303) 595 9103
Page Two
Mr. Tom Gathman
City of Fort Collins
November 14, 1985
5. The initial infiltration rate used in HYDRA was for average
moisture conditions.
One hundred year floods for the HYDRA run assumed average
antecedent moisture conditions. The assumption of saturated
antecedent moisture conditions prior to the 100-year storm would
produce a lesser frequency flood, possibly a 125-year flood.
6. Tom rioted the HYDRA program was very sensitive to some
parameters, and mentioned the possibilit�r that some of the input
values could be interpreted differently.
HYDRA input parameters were measured where possible. In areas
where site plans were not available, shorter overland flaw
distances and gutter lengths to the known street locations were
used to be conservative.
The meeting concluded that further standardization of models is needed and
that TST and the City will work closely on standardization.
BDM:sre
CITY OF FORT COLLINS
STORM WATER UTILITY
Ms. Suzanne Bassinger
Taranto, Stanton & Tagge
748 Whalers Way
Building D
Fort Collins, CO 80525
November 18, 1985
RE: HYDRA program and Five Oaks Village P.U.D.
Dear Suzanne,
I would like to thank both Brian and you for spending time with me
discussing the I4YDRA program last week. As you know, we ended the discussion
still somewhat differing in opinion as to the reasonableness of the results of
the program. I would like to reiterate the conclusions and actions that were
agreed upon.
1. Roger Peterson, as the professional engineer responsible for the work,
will write the City a letter clearly stating that he fully stands behind the
results of the Revised Final Drainage Report for Five Oaks Village P.U.D.
dated September 9, 1985.
2. The HYDRA program is not acceptable for future drainage reports for
the City until the program is calibrated, preferrably with actual stream gage
data representative of conditions in Fort Collins. It was mentioned that the
Denver Urban Drainage and Flood Control District has stream gage information.
As I stated several times during our meeting, the City is not opposed to
the use of new models, infact we want to remain at the forefront of
methodology. However, any new model must prove itself before it can be
accepted without question. Because the detention volume storage requirements
produced by the HYDRA model significantly differ from those determined by
SWMM, CUHP and the Rational Method, the burden of proof must rest with you. I
an anxious to see some comparisons between the stream gage data and the HYDRA
model, and for that matter, between the actual data and SWMM and CUHP as well.
Si erely
oG hmann
Civil n�ineer II
rains Division
Bob Lee
Director of Transportation Services
v
CITY OF FORT COLLIN8
STORM WATER UTILITY
January 6, 1986
Metcalf, Ltd.
3565 Windmill Drive 9N4
Fort Collins, Colorado 80525
Re: Storm Drainage Basin Fees for Cunningham Corner P.U.D.
Gentlemen:
This correspondence is to bring to your attention a change in the total
basin fees expected to be paid for the Cunningham Corner P.U.D. because
of a revision to the size of the site's detention pond as recommended
by Taranto, Stanton and Tagge, your engineering consultant.
The detention pond for the 39 acre site was originally designed to have
a capacity of 5.81 acre feet per the April, 1979 TS&T drainage report.
A pond of this size reduced the amount of the basin fees to be paid
by 60%, since the City's policy is to recognize a developer's efforts
to reduce his site's total runoff rate by crediting against his basin fees.
The September, 1985 Five Oaks Village P.U.D. drainage report by TS&T
recommended that the pond be downsized to 2.6 acre feet, using a
different computer model than was used previously. Since basin fees
are determined to a very large degree upon the amount of detention
to be provided - - and this amount is apparently going to be reduced
significantly - - the fees for the remaining phases of this site will
be approximately $55,000 greater because of the reduced detention capacity.
Knowing this, you may wish to have your consulting engineer evaluate the
costs of the various alternatives to insure that the final design is truly
the most economical for you.
Please feel free to contact us if you should have questions.
Tincerely,
Michael H. Mercer
Operation & Maintenance
Administrator
Tom Ga£hmann
evil ngtn el- II
STORM WATER UTILITY
i'-
<`���/� ✓' MINI
1 �Y�
300 LaPorte Ave.. P.O. Box 580 . Fort Collins, Colorado 30522 . (303) 221-66P�
CITY OF- FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
January 10, 1986
Mr, and Mrs. Steven Schroeder
3296 Gunnison Drive
Fort Collins, CO 80526
Dear Mr, and Mrs. Schroeder:
This letter is to inform you that I have been requested by the Developer of
Cunningham Corner, Mr. Tom Sibbald, to process the vacation of Windmill
Drive adjacent to the Fisher's and your property. To vacate the right-of-
way of a street means that the City would give up its right to use the
property for a street. According to state law, the street when vacated,
reverts to the adjacent property owners. In this case the ground would be
divided along the center line of the street and the east one-half would
then be yours and the west one-half would revert to the Fishers.
Also, in this case, the City would retain an easement for an existing water
line in the street, and another easement for a pedrestrian-bike path that
will link Gunnison Drive and Richmond Drive.
I understand' that you have decided that you are not interested in retaining
the vacated property that would be yours as a result of this vacation and
that you are willing to deed this property to the Fishers provided that all
paper work is handled by Mr. Sibbald, per his September 23, 1985 letter to
Joe Frank of my office. If you agree to the contents of this paragraph
would you please sign below and return it to me as soon as possible in the
attached stamped envelope. I have included and additional copy of this
letter for your files. I intend to take the vacation of Windmill Drive to
City Council for their consideration on February 18, 1986. If you have any
additional questions regarding this matter, I am available at 221-6750.
Sin erely,�''��
Bonnie Tripoli
Development Coordinator
ura
Joe Frank, Acting Planning Director
Mr. T(W Sibbald
Mr. Steven Schroeder
Mrs. Schroeder
55 � Pli y�:1'li�
OFFICF OI COMMUNITY 300 LaPorte Ave • P O Box 580 • Fort Collins, Colorado 80522 • (303)221-6750
DEVELOPMENT. PLANNING DIVISION
FEB 01 P.M.
CITY OF-- FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
January 28, 1986
Mr, Tom Sibbald
3565 Windmill Drive N-4
Fort Collins, CO 80526
Dear Mr. Sibbald:
This is the letter I promised to confirm what was discussed at our meeting
with Joe Frank and the Fishers on January 21, 1986. Basically what was
agreed was;
1). Mr. Sibbald would be responsible for all paper work involved in
transfering the property from the Schroeders to the Fishers.
2). All existing improvements will be removed by Mr. Sibbald and the
ground graded according to the approved plans on file in the City
Engineer's Office. Mr. Sibbald would also install the curb, gutter and
sidewalk adjacent to Gunnison Drive.
3). The Fishers are to present to Mr. Sibbald estimates to relocate and
enlarge their fence to enclose the newly acquired area. He agreed to
participate in 50% of those costs up to approximately $300.
4). Mr. Sibbald would then hydroseed the area.
5). Mr. Sibbald would also install the bikepath and the adjacent
landscaping and perpetually maintain the bikepath and the adjacent
landscaping between the fences.
Joe Frank is to meet with the City Arborist to determine suitable
landscaping for the area to be maintained by Cunningham Corners. We will
let you know what the results are. I need from you now an updated map
(8.5"xll") and legal description showing the waterline easement, the
bikepath easement, and the utility easement adjacent to Gunnison Drive. I
will call Mike Carver at TS&T with this request.
Yours truly,
Bonnie Tripoli
Development Coordinator
Gt ,
OFFICE Of COMMUNITY
300 LaPorte Ave. • P.O. Box 580 • Fort Collins,
6750
79 icVill »k'a at
Yy Y�• II
February 24, 19B6
Michael Mercer
Operations & Maintenance Administrator
City of Ft. Collins
P.O. Box 580
Ft. Collins, CO 80522
Re: Stormwater Utility
Dear Mr. Mercer:
In response to your letter of January 6 and our subsequent phone
discussion, you should know that we find the City's reason for increasing
Cunningham Corner's storm drainage fees by $55,000 suspect.
As we are informed by our consulting engineer, your department
is questioning the reliability of the computer model TST presently
is using to calculate detention and release flows. If that be the
case, it should be between your department and TST to clarify or
come to an understanding, relative to the computer model.
Further, according to TST, the Drainage Study used to evaluate
Cunningham Corner's downstream flow allows us to release 17 c.f.s.
The 1983 drainage report still. maintained the 17 c.f.s. release rate.
The most recent drainage report still has Cunningham Corner releasing
17 c.f.s The point being that the release rate has not changed and
if in fact "the City's policy is to recognize a developer's efforts
to reduce our site's total runoff rate", why are our fee's increased?
Finally, we question the timing of the City's revelation. It
seems to us that information relative to City fee cost should be
injected much earlier in the lengthy City planning process. Especially
increases in fee costs that may effect the developer's evaluation
of his project.
We look forward to your response.
Very truly yours,
Z i l"' "
Thomas R. Sibbald
cc: Suzanne Bassinger, Taranto, Stanton & Tagge
Joe Frank, Ft. Collins Planning Department
TRS/kf
1 1s. r� r
MEMORANDUM
DATE: May Z11, 1986
TO: Mick Mercer FROM: Tom 6athmann
/
l #(I
RE: Drainage Basin Fee Credit for Five Oaks at Cunningham Corner
C41VA, pw/rts SwAu 0WNRx/dLV4IOPtr it ,NK Sa►, L �R%So.-% .
As we have briefly discussed, Five Oaks at Cunningham Corner is entitled to
a reduction in their basin fees per section 93-11 of the City Code. The
Development Agreement included an estimated cost of eligible improvements
of $7,961.ZS for which we have already been billed $S,737.50. It seems
prudent to withhold a percentage of the estimated cost as a contingency to
insure we do not inadvertently provide more credit than is actually due,
and then be unable to recover that amount. Based on the somewhat course
nature of the estimates, I think it best if that contingency is set at 20%.
Therefore, please provide this development with $6,369.00 of basin fee
credit. We will provide at most one other adjustment to that amount (if
the costs are, substantiated) before the improvements are completed,
inspected and accepted, and the final reimbursement or credit is made.
56Z •ay 16� Guw^.�1�.a.•.-. bv.Q�
tz4If*I low y-Q�
W w.dw.k U Tr S ` pq
5`10. 3sbs S S- qw-4,
D 04k--t A-OOL oWZ-- P/zz &
w
June 17, 1986
Mr. Thomas Sibbald ,1
3565 Windmill Drive N-4
Fort Collins, CO 80526
i
Dear Mr. Sibbaldr
The following isin response to your petition for the reduction in the
storm drainage fees for the Cunningham Corners PUT. As we discussed, I was
designated by the Public Works Administrator to hear this petition on her
behalf. This correspondence will address my determination on the petition.
Background
As identified in the City code, the storm drainage basin fees for new
development are based on that site's area, runoff coefficient, basin fee
base rate, and the detention reduction factor. The detention reduction
factor is based on the area of the site, the runoff coefficients, and the
detention storage provided by that site. When the drainage basin fees were
established, the detention reduction factor was used to provide a credit
for the amount of storage a development is providing before its storm
runoff is discharged into the drainage system.
In 1979, the Cunningham Corner PUD master plan proposed a detention pond
some 5.81 acre feet in capacity. The design of this pond was performed by
the rational method with a release rate of 9 cfs. Approximately ----
building permits .for the Cunningham Corner PUDShave been issued based on
this detention volume, and its -------- basin fee calculation
Please resubmit three prints indicating the revisions. It is not
necessary to pay any additional fees. If you have any questions,
please call the Planning Department at 221-6750.
Sincerely:
Ted Shepard
Senior Planner
xc: Rodney Albers, Stormwater Systems Supervisor
and +uL rjan4iri� 1ayn (�Crru*f
In 1980, the Foothi is Basin Drainage Master plan was adopted with the same C'
w 5 v oc�1h
pond �g a capacity of 3.61 acre feet as t'e1Y p
data-in-wate�ican the plannPri unit dekce ^^Q ^i �Jhe release rate fcem-44i-s of
detention—aEility was 16 cfs. These computations were performed by the
Storm Water Management r�iiodel, or SWMM computer model. This model is more
sophisticated than the rational method, because of its rating capabilities
detailed input parameters.
In 1985, the final development plans for the Five Oaks PUD was submitted
and approved. The Hydra runoff model was utilized to calculate the
detention volumes, and it was found a detention pond of 2.6 acre feet in
1-7
size was adequate to serve the site with a release rate of-15"cfs. Again,
this computer model is similar to the SWMM as it is more sophisticated than
the rational method. The final design drawings for the development show a
total capacity of the pond with the pond's freeboard included as being 3.9
ac. ft.
In November of 1985, staff informed you the revised drainage fees for the
entire site, 39 acres, would be increased over the originally calculated
drainage fees because the detention storage was being reduced from 5.81
acre feet to 2.15 acre feet. A total difference for the entire 39 acres of
some $55,000 in drainage fees. No building permits have been issued based
on this new fee computation. Even though the detention storage has been
reduced by the detailed analysis and the increased release rates, the
surface area has basically remained the same. The detention pond layout
has been incorporated into the site's open space.
Conclusion
Given all the information I have gathered, it is my recommendation the
drainage basin 1`ees for the Cunningham Corner PUD be based on a detention
volume of 4 acre feet. This would represent a 54% increase in the
detention volume that would be used for the computations to calculate the
all
detention's reduction factor. This would also show the $55,000 amount be
reduced by ---- percent. If this is acceptable, the total drainage basin
T,
fees increase for the Cunningham Corners PUd would be reduced from the
previously mentioned $55,000 to
�QCNV4C �e, W65 6 G^
Again, given: rt. —Mc , +),0- VIA �Ee 13 1FIti�cj 17C,-�
1tk. ) ;c) mtr2 4ay) jm6+PW Cu�c,(Jy
kUS c hanF
1. The release rate for the detention pond has been increased;
2. Your consultant submitted and the City accepted the revised detention
volume of .Tc6 acre feet;
3. The detention pond surface area has remained the same and incorporated
in this site;
��5
.-4. The state of the art for computing drainage cal ulates has evolved; and
�Q5. l',/Y-a 3 SWnnnn 664h aia,� AA th :e74/ 4413o`t wertn'4 W?6
5. The 4 acre feet detention volume allows a \percent reduction in the
drainage fees.
I feel this is an equitable solution to the matter at hand. If you have
any questions on the above, please don't hesitate to contact me.
Sincerely,
Bob Smith
Acting Director of Transportation
BS:sq
July 9, 1986
Mr. Gary Diede
Acting Director of Community Services
City of Ft. Collins
P.O. Box 580
Fort Collins, Colorado 80522 HAND DELIVERED
Re: Five Oaks Village Phase I Irrigation Revision
Dear Mr. Diede:
The original irrigation tap and meter for Five Oaks Village Phase I
was proposed' to be one inch (1") in size. After consultation with our
landscape contractor, it was determined that a 1" tap was not sufficient
to service the proposed area.
We authorized our contractor to install, to City specifications, a
one and one-half inch (1}") tap and vault sufficient to accomodate said
tap.
To facilitate said change, please consider this letter our request
to your department to approve administratively this change.
Thank you for your consideration and expeditious handling of this
matter.
Very truly yours,
Thoma's bald
President, Sibbald/Lustig Co, Inc.
General Partner of Metcalf, Ltd.
TS/nr
cc: Bonnie Tripoli, City Planning Dept.
3565 Windmill Dr., N-4
Fort Collins, CO 80526
223-3233
CITY OF FORT COLLINS
OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT
June 4, 1987
Tan Sibbald
3531 Windmill Drive M-3
Fort Collins, CO 80526
Dear Tom:
This letter is a summary of the final landscaping details for the pedes-
trian/bike path in the vacated right-of-way of Windmill Drive. As I dis-
cussed with you on the phone earlier today, all four parties (the City, Tom
Sibbal.d, the Fishers, and the Schroeders) have agreed to the following
obligations as listed below.
Tan Sibbald's obligations are:
1) Reimburse Mr.. Fisher $300.00 for his portion of relocating
and enlarging the fence as agreed to in the letter. to Mr.
Fisher dated January 28, 1986
2) Provide and deliver to the Fishers, the eight, 5 gallon
Potenti'11a shrubs, and the four shade trees (honeylocust,
green ash, hackberry, or bur oak) 2 3/4" caliper, as shown
on the landscaping plan attached to the amended development
agreement.
3) Perpetually maintain the entire bikepath, from Gunnison to
the south property line of Mr. Fisher, and the adjacent
landscaping between the fences, as stated in the January
28, 1986 letter.
The Fishers obligations are:
1) Provide a drawing of
plan to the City,
landscaping.
OFFICE OF DFV[ I (
SERVICES, PLANNING
the proposed change to the landscaping
for approval, prior to planting any
300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6750
2) Plant trees and shrubs provided by Mr. Si.bbald according to
the approved plan, and sod all area between bikepath and
the existing lawn to the west. It will be the sole respon-
sibility of the Fishers to maintain the sod and all lands-
caping west of the bikepath.
3) Tnstall a fence no less then one foot from the west side of
the bikepath. The fence shall run from the south edge of
the bikepath to the north, no further then the existing
fence on the Schroeder's property running parallel to
Gunnison Drive. This shall be shown on the revised lands-
caping plan.
4) Install plastic ground cover and landscaping gravel along
both sides of the bikepath adjacent to the fence.
5) The Fishers are to work with the Schroeders to provide an
aesthetically pleasing entrance to the bikepath, and to
maintain the landscaping along the frontage of Gunnison
Road.
The Schroeder'=; obligation:
1) Maintain the landscaping adjacent to the east side of the
bikepath along the frontage of Gunnison Road.
The City's obligations:
1) The City will release the footing and foundation permits to
+,.,�t 'Perm-S-rgbatd, currently being held by the City, after the
t.+., Fishers have received the check for $300.00.
2) The City will release the building permits for Five Oaks at
Cunningham Corners (provided all other obligations of
previous agreements have been meet) after Tom-S449 ld- has
delivered all landscaping to the Fishers as described T
above.
T hereby agree to all conditions of this letter, and agree to fulfill my
obligations as stated in this letter:
Signature Date
Devel ment Services
Engineering Department
May 3, 1989
Shields Street Corporation
c/o 3531 Windmill Drive $M-3
Fort Colli s-, Coiotado 80526
Re: Willow Grave Development Agreement
Gentlemen:
In May 1984, Metcalf, Ltd. entered into a Development Agreement with the
City of Fort Collins for the development of Willow Grove Village. Part of
that Development Agreement called for irprovements to be made to "Phase H
of the Cunnirx;ham Corner Master Plan".
In September 1985, Metcalf, Ltd. entered into another Development Agreement
for Five Oaks Village covering Phase H of the Cunningham Corner Master Plan
or "Tract D of chestnut Village", as it was then legally known. This new
development reconfigured and platted this parcel of land and contained it
within this new development for Five Oaks Village, Tracts A, B & C.
The City's Storm Drainage Department states that the completion of the
storm drainage improvements is a function of the building construction.
Therefore, bosh the Five Oaks Village and Willow Grove Village Development
Agreements are still in effect. The responsibility for completion of the
drainage improvements will be triggered by whomever constructs the number
of units as outlined in each agreement.
Sincerely,
Mike Herzig
Development Coordinator
300 LiPortc :Avenue • P.O. Boy • Fort Collins. CO 30�"-W;80 • (,03) �Ll-tioU�
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
April 12, 1985
Frank Vaught
ZVFK Architects/Planners
Eleven Old Town Square, Suite 200
Fort Collins, CO 80524
Dear Frank,
The application for amended Master Plan of Cunningham Corners will be
considered at the April 29, 1985 meeting of the Planning and Zoning Board.
On Friday, April 19th, 8 1/2" x 11" PMT reductions, ten (10) full size
copies and colored renderings of the Master Plan should be submitted.
Consideration of the preliminary PUD application of Five Oaks Village at
Cunningham Corners has been continued to the May 20, 1985 meeting. In order
to allow staff sufficient time to review any revised plans or new
information, it must be submitted no later than Wednesday, May 1st. Also,
on Friday, May loth, 8 1/2" x 11" PMT reductions of all plans and colored
elevations of the site and architectural drawings should be delivered to
this office. On Monday, May 13th, ten (10) full size copies of the site,
landscape and building elevations should be submitted.
It is important that the above deadlines be followed if the item is to be
considered at the desired public hearing of the Planning and Zoning Board.
If you should have any further questions, please feel free to call me.
Sincerely,
i
� oe rank
r City Planner
CC: Sam Mutch, Planning Director
Bonnie Tripoli, Development Coordinator
-• �____ _ '"-gym..-.�.,
µ i
t
OFFICE OF COMMUNITY 300 LaPorte Ave. • P-O. Box 580 • Fort Collins, Colorado 80522 (303)221-6750
DEVELOPMENT, PLANNING DIVISION
f
ql/
Sif
April 15, 1985
Re: Cunningham Corner
and Downstream Drainage
Job No.: 10-280-069
City of Fort Collins
Engineering Services - Storm Drainage
P.O. Box 580
Fort Collins, Colorado 80522
Attn: Mr. Bob Smith and Mr. Tom Gathman
Suzanne Bassinger and I appreciated the time you took to meet with us last
Wednesday (April 10, 1985) to discuss the present and future storm drainage
concerns of Cunningham Corner and some adjacent properties. Belay is a
summarization of our discussions and decisions.
1. Tract "H" must became a Detention Facility before the future
Tracts "A" "C" "D" and "G" are constructed. The construction
of a Detention Facility will necessitate an outfall channel and
downstream improvements. The swale/channel improvements through
Sun Disk Village and Foothills Park will be "temporary" except
that the culvert under Colony Drive will be constructed to final
size per the Foothills Basin Master Plan. If agreements can not
be reached with downstream entities the development of Tract "A"
can utilize a retention facility until agreements can be reached.
2. The release rate from the detention pond will be limited to the 2
year historic rate for each phase as it develops with a final
release rate of 17 cfs.
3. Shields Street to the centerline and adjacent is a part of
Cunningham Corner and this runoff must pass through the Detention
Facility.
4. The construction costs for improvements associated with the
development are borne by the developer.
5. Construction costs for improvements on site that are required for
Foothills Drainage Basin may qualify for credit against the
drainage basin fees due when building permits are issued.
6. The construction costs for improvements in the Sun Disk and
Foothills Park P.U.D.'s borne by the Cunningham Corner developer
will be a direct cash pay back, upon completion, from the City of
Fort Collins. These reimbursable costs include preliminary (sane
costs incurred to date) engineering, final design engineering,
construction, and construction loan interest.
TARANTO, STANTON & TAGGE
Consulting Engineers
748 Whalers Way • Building D • Fort Collins, CO 80525
(303) 226 0557 . Metro Denver Number (303) 595-9103
Page Two
Mr. Bob Smith and N'r. Tom Gatlnan
City of Fort Collins
Engineering Services - Storm Drainage
April 15, 1985
7. The City will work closely with Taranto, Stanton & Tagge to
provide a practical and effective solution.
Your cooperation in this matter has been greatly appreciated.
Sincerely,
A-,4,\\AIL P—Ae-V tv'_
T. Michael Carver, P.E.
TARANPO, STANTON & TAGGE
CONSULTING ENGINEERS
cc: Metcalf, Ltd.
TMC : laic
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT. PLANNING DIVISION
May 23, 1985
Frank Vaught
ZVFK Architects/Planners
Eleven Old Town Square, Suite 200
Fort Collins, CO 80524
Dear Frank,
As I am sure you are aware, the revised Master Plan of Cunningham Corners
PUD has been appealed to the City Council. Until this item is resolved,
consideration of the preliminary PUD plan of Five Oaks Village by the
Planning and Zoning Board will be continued. It appears that the earliest
possible meeting that the item could be considered would be in July.
Please let me know as soon as possible your plans for processing the Five
Oaks Village PUD project. We will need to establish a timetable for
submitting revisions and other required information.
Thank you for your prompt attention to this matter.
Sincerely,
Job Frank
S t'
_5V City Planner
CC: Sam Mutch, Planning Director
Bonnie Tripoli, Development Coordinator
t.
OFFICE OF COMMUNI7Y
300 LaPorte Ave. • P O. Box 580 • Fort Collins. Colorado 80522 • (303)221-6750
r.nnevin�
September 5, 1985
Mr. & Mrs. Stephen G. Shroeder
3296 Gunnison Drive
Ft. Collins, CO 80526
Dear Mr. & Mrs. Shroeder:
As you may be aware, the developers of Cunningham Corner are nego—
tiating with the City to vacate the Windmill Drive stub adjacent to your
property.
We, as the developers of Cunningham Corner, are given the responsi—
bility of contracting you to explore your desires with regard to the property
under the stub.
We are responsible for removing the old street, curb, gutter and
sidewalk. Upon construction of Phase II of Five Oaks Village, we shall
be required to install a pedestrian/bike path. We may (depending upon
ownership) provide some landscaping.
These matters need to be explored in some depth with you. If you
could contact me at my office, phone #223-3027, any weekday, we can ar—
range a time to discuss your wishes.
Sincerely,
Thomas R. Sibbald
TS/nr '
Enclosure
cc: Frank Vaught, ZVFK
Joe Frank, City of Ft. Collins•/
3565 Windmill Dr., N-4
Fort Collins, CO 80526
0
WINDMILL DRIVE; WOODWEST SEVENTH FILING,_
CITY OF FORT COLLINS,
LARIMER COUNTY; COLORADO
.a FaU
pj� il q�
� J^
SFP '41°
d
GUNNISON DRIVE
1 (60' R.O.WJ PROLONGATION OF_:THE NORTHERLY
LINES OF LOT 27; BLOCK•27'
AND LOT 1; BLOCK 20
N B9-46'20-E 90.0
CI 35.00 110.00
N�
NW
W/NpMIL4 DRIVE
c ' R.O. J
I I
SCALE 1'- 20'
o a
I MITA 07 KI
STATEMENT OF PLANNING OBJECTIVES
FOR
THE CUNNINGHAM CORNER MASTER PLAN
The amendment to the Master Plan of Cunningham Corner, like the currently
approved plan, is comprised of a variety of housing types with a central
shared recreation amenity, complimented by a convenience commercial site
and an office park employing approximately 350 persons. This plan is in
compliance with the following criteria of the Fort Collins Land Use
Policies Plan:
Close proximity to employment, recreation and shopping facilities.
Greater than three units to the acre.
Does provide for a mix of housing densities.
As a higher density residential use, is located near a regional shopping
center and neighborhood park facilities and has access to public
transportation.
The purpose of amending the Master Plan is to omit the connection of
Windmill Drive to Woodwest subdivision, thereby addressing two major con-
cerns. First, the residents of Woodwest have raised strong objections to
the street connection. Second, Tract A planned for townhomes, and Tract H,
an open space and detention area, could then be integrated into a unified
site plan and not function as two parcels separated by a drive. The elimi-
nation of the proposed connector street will not adversely affect traffic
flow or compromise emergency services to Woodwest subdivision.
Location and densities of residential parcels will remain similar to the
current Master Plan. The proposed housing types are combined with the
existing neighborhoods to form a logical progression of densities from
single family to townhomes to medium density condominiums adjacent to the
office and commercial center at the intersection of Shields and Horsetooth.
The Master Plan will accommodate 230 units and 87,000 square feet of office
and commercial building. Chestnut Village is under construction and is
therefore not included within the proposed Master Plan.
The various uses are connected by landscaped buffers providing pedestrian
access without crossing streets or parking lots. Units are oriented
towards landscaped areas to optimize privacy to balconies and patios.
Emphasis on streetscapes along the arterial streets and drives within this
development will be reinforced by creative site design and landscape treat-
ment.