HomeMy WebLinkAboutFAIRVIEW SHOPPING CENTER - Filed CS-COMMENT SHEETS - 2003-10-30DATE DEPARTMENT VVV wo�,2
ITEM :
COMMENTS ea core, Lrr �f
�o g IS t-A N D^ QA I� 11 O �jK I S TiAI /'•¢RK/�/t
Ag! 9U /�1 �.� F e.24cy VEH�e!€s
��RrAJA6.E - D T ��DYL�_SS TWE
/M PF—,2v) a u s 4&r=-4 - OAk) IE-)Lrs r/"4
CITY OF FORT COLLINS P.O. BOX 580, FORT COLLINS, COLORADO 80522 PH (303) 484-4220
PLANNING DIVISION EXT.655
June 22, 1982
Mr. Bill Brenner
Robb & Brenner, Inc.
P.O. Box 251
Fort Collins, CO 80522
Re: Amendment to Fairview PUD
Dear Mr. Brenner:
Staff has reviewed the amendment to the Fairview PUD and has the following
comments:
1. Since a change in use from that approved on the original PUD is being
proposed, the project must be processed under the Land Development Guid-
ance System. Thus, the All Development - Numbered Criteria Chart, Point
Chart D, and final elevations need to be submitted for review.
2. The water source for Wendy's is tapped into the 12-inch water main in
Elizabeth Street, not as indicated on the plan. The water service for
Taco Bell will also have to be tapped into the main in the street. The
sewer is only about 5-feet deep in this vicinity.
3. Additional landscaping treatment along the Elizabeth Street frontage should
be provided.
4. Verify the ability of emergency vehicles to negotiate the site.
5. Indicate 10-foot easement on site plan to cover the existing electrical
lines.
I would recommend we meet soon to discuss the above items. Revisions to the
plans should be delivered to this office no later than Wednesday, July 7, 1982.
Also, on Monday, July 19, 1982, 8-1/2"xll" reductions and colored renderings
of the site and landscape plans should be submitted. If you have any questions,
please feel free to call.
Sincerely yours,
Cathy Chi anese
Planner
CAC/fsr
cc: Mauri Rupel, Development Engineer
Ken Waido, Chief Planner
CCNCEPTLIAL REVIE I
STAFF COMMENTS
���:,Aa.::` ^ • ...r4,:i.�srewt<3�:'erg:W�a'.'xl..;»,..s:�ws,..,.w-a.ses.::we�•�=,w'rov+N.�..L>+...a,.� � s.e..n�a.,aHs;�Jri`t.:a;.x.:;,..wdc:4s..:b,.;.ima..:�s:"�,,: is.w.
MEETING DATE: January 3, 1984
ITEM : FAIRVIEW PUD
APPLICANT: C/O Bill Brenner, Robb & Brenner, PO Box 251, Fort Collins, CO
LAND USE DATA:
7,500 square feet health club
COMMENTS:
1. Maintain fire truck access around building and parking lot.
2. Verify adequacy of utilities in the area to service project.
3. Submit revised drainage report.
4. Update traffic report - address change in proposed use.
5. Submit architectural elevations.
6. Address bicycle traffic to site.
ITEM: 72-79C FAIRVIEW, PHASE II REVISED, (NAUTILUS) PRELIM & FINAL
COMA' .7 ,
b )
• �
- • �� JQ,,,,�:,w,�- fib,`' °.d°� ` � ��--�-
io
CITY OF FORT COLLINS
OFFICE OF PLANNING AND DEVELOPMENT
May 22, 1984
Mr. Bill Brenner
ROBB & BRENNER
Post Office Box 251
Fort Collins, Colorado 80522
Dear Mr. Brenner:
Staff has reviewed the Fairview PUD, Phase 4 and has the following comments:
1. The parking lot and circulation plan agreed to for Phase 3A does not
coincide with proposed design for Phase 4. Internal circulation has been
changed from that which was originally approved. New circulation plan
must be approved by City. Trip generation figures are to be provided for
proposed use.
2. Information regarding parking demand is to be submitted. C, B & P parking
lot is often completely full.
3. Driveway aisles should line up.
4. Parking stalls along eastern edge should be dimensioned.
5. Notes regarding new PVC sewer should state where the design for this site
is to be found.
6. Landscaping for interior and perimeter parking lot is not adequate.
Islands at ends of parking rows must be landscaped and should be at least
8 feet wide in order to accommodate plantings.
7. Provide motorcycle and bicycle parking.
8. All signs must comply with sign code.
9. Site plan does not show revised detention boundary and high water eleva-
tion.
10. Indicate existing light and power utility easements on site plan.
ui i ci ui i�i nNNir��r;
l
�❑ I aP, t.. T. f rl Pf F"'t f, n, r7f 1°IPP rlrni i9IJ=7Sn
Mr. Bill Brenner
From: Cathy Chianese
May 22, 1984
Page Two
Revised site and landscape plans addressing the above comments are to be
submitted Thursday, June 7, 1984. On June 18, 1984, 82'xll" reductions and
colored renderings, and 10 copies of all plans are to be submitted. The Plan-
ning and Zoning Board will consider this item at the June 25, 1984, meeting.
If you have any questions, please do not hesitate to contact me.
Sincerely,
C ' A'V' V
Cathy Chi anese
Senior City Planner
CC:ro
cc: Bonnie Tripoli, Development Coordinator
Mauri Rupel, Development Center Director