HomeMy WebLinkAboutFOOTHILLS VILLAGE - Filed GC-GENERAL CORRESPONDENCE - 2003-10-30February 2, 1971
TO: Don Reynolds, City Planning Director
FROM: Roy A. ilingman, City Engineer
RE: Foothills Phase III A Subdivision
After reviewing the Foothills III A Subdivision plat, I have
the following comments:
1. There should be uo parking allowed in any area other than
the regular parking lots, and signs should be provided to allow
for this.
2. All streets should be provided with sidewalks for proper
pedestrian safety.
3. Stuart Str at should be paved for the full width from
Shields since this street is the only access to this area. There
is a need for sidewalk at least on the south side of the street.
4. All dedicated streets must have curb and gutter, instead
of the curb only as shown on the plan.
5. A storm drainage plan must be presented with the Utility
Plan.
RAB/lms
Respectfully submitted,
Roy A. Biagman
City Engineer
4
P. O. Bo,: 580
300 West LaPorte Avenue
Fort Collins, Colorado
80521
J Mh \
A t t
1 7
December 30, 1971
Federal Housing Administration
Denver
Colorado
Gentlemen:
Telephone 303 484-4220
The utilities for Foothills Village First Filing ,
within the City of Fort Collins, which includes water lines,
sewer lines, curb, gutter and sidewalk, paved streets, and
storm drainage facilities, are inspected during construction
and upon completion are accepted by the City for continuous
maintenance.
Sincerely,
Ray �A ingman
City E�ineer
RAB/lms
cc: Veterans Administration
Mr. Kurtz, Kurtz Construction
TIME CENTER OF THE WORLD