Loading...
HomeMy WebLinkAboutFAIRVIEW SHOPPING CENTER THIRD - Filed CS-COMMENT SHEETS - 2003-10-20CONCEF w UAL REVIEW STAFF COMMENTS EETI NG DATE: _11arch T z,_ 19R4 JT E M : _ Fairview Sh000ina Center __Phase 3 •'-iPI'LIcANT; Bill E�renner, ROBB & BR NNFR AR .HTT CTS_ Post Office Box 251, Fort Collins, Colorado, 80522 LAND USE DATA,: 2500 square foot Taco Bell COMMENTS: 1• Entire 2 acre site should be processed as one PUD. 2. Extend water and sewer lines to site. 3. Accommodate any existing power lines. 4. Maintain fire access to both structures. 5. Locate existing fire hydrants. 6. Provide loading zone. 7. Designate handicapped and bicycle parking. 8. Provide storm drainage report. = 9. Provide sidewalk if not existing. 10. Replace any damaged curb and gutter. 11. 50 foot ROW on Elizabeth Street. 12. Curb return on Elizabeth Street. 13. Provide greater stacking space on -site to relieve congestion at Elizabeth Street curbcut. 14. Provide greater sE�tback for flow -through area to adjacent parcels. 15. Suggest traffic impact report. 16. Maintain landscaping areas. 17. Concern with landscaping setback along Elizabeth Street. Sill Brenner From: Cathy Chianese March 12, 1984 Page Two 18. Screening of headlights and parking lot from adjacent residential units is important. 19. Concern with use of any "left over" spaces created by moving the access drive to future apartments. 20. Provide pedestrian connections to adjacent parcels and future apartments. 21. Provide adequate stacking spaces for drive-thru. ATE 5 APRIL 84 3EPARTMEN ITEM: #72-791) PRELIMINARY & FINAL FAIRVIEW SHOPPING CENTER, PHASE III A 0 CITY OF FORT COLLNIS OFFICE OF PLANNING AND DEVELOPMENT April 19, 1984 Mr. Bill Brenner ROBB & BRENNER Post Office Box 251 Fort Collins, Colorado 80522 Dear Mr. Brenner: Staff has reviewed the Fairview Shopping Center, Phase 3, Final, and has the following comments: 1. Dimension ROW on Elizabeth Street (100 feet required). 2. Indicate limits of phase 1 construction. 3. Submit vacation request, including letter of request, 82"xll" reduction of original and proposed plat, and legal description. 4. Verify turning radii for emergency vehicles. 5. Indicate drainage easements on plat. 6. Additional stacking space should be provided behind order board. 7. A ZBA variance will be necessary if project wants a menu board freestanding on ground sign. 8. All signs must comply with the City's sign code. 9. Indicate building envelope. 10. Locate fire hydrants. 11. Indicate location of directional signs. 12. Additional landscaping is to be provided along West Elizabeth Street. 3 -71k 0 ti } OF (ICE Uf P( f �NIR1G 217E fA je. P 0 Enx 5E0 Fu-t, Collins, Color�3do 80522 (303) 221 -6750 AND DFVE_LOPMLNI Mr. Bill Brenner From: Cathy Chianese April 19, 1984 Page Two 13. Phase 2 building is located too close to West Elizabeth Street. Estab- lished setbacks along the street should be continued. 14. The 6 inch water line stubbed onto this property from Elizabeth will have to be extended in the proposed drive to the south property line. The service line for Taco Bell should come off this line. A sewer line has been stubbed onto this property from the Matador Apart- ments site. This line should be extended north with the service for the Taco Bell connected to it. Revised plans addressing the above comments are to be submitted to the planning office by Wednesday, May 9, 1984. On Monday, May 14, 1984, 81Z"xll" reductions of the plans are to be submitted. Due to the Memorial Day holiday, the Planning and Zoning Board meeting will be held Wednesday, May 30, 1984, at 6:30 p.m. Please do not hesitate to contact me if you have any questions. Sincerely, Cathy Chia se Senior City Planner CC:ro cc: Mauri Rupel, Development Center Director Bonnie Tripoli, Development Coordinator Al Hauser Architecture One 150 East 29th Street, Suite 200 Loveland, CO. 80538 Dear Al, City staff has reviewed your submittal for the Fairview Shopping Center PUD, :3rd Filing - Preliminary & Final, and offers the following comments: 1. This proposed parking lot is in the RP -Planned Residential zone, and the request is not a permitted "use by right" in this zone. A PUD review is necessary even though this additional parking is an extension of an existing use. Only the All Development criteria from the Land Development Guidance System will apply. 2. A handicapped access ramp should be shown and included west of the entry, if one does not already exist. 3. A Utility Plan with general notes, vicinity map, details, and all pertinent information, as outlined in the submittal requirements information packet available from the City, must be submitted. The Grading, Drainage, and Utility Plan can all be on one sheet. 4. The Site Plan should show surrounding use information within 150' (excluding street ROW) in all four directions. 5. The private street that provides access to the TACO BELL and Diamond Shamrock is planned to extent south, almost to the new south property line, with this request. What is planned for the adjacent property to the south, and how will this street impact that property? A "temporary" traffic barricade should be placed at the south end of this extension with subsequent approval, 6. The parking stalls are shown to be 19' in length (face of curb to end) for both the perpendicular and 60 degree parking spaces. Phis dimension is adequate for the 60 degree parking stalls along the north and west property lines and the perpendicular stalls along the south line. The 60 degree stalls along the sidewalk and building, on the east side of 81 Furth CoII�� c Av��nu� P.O.`�,�� � O ..�:Y CoiIill C-0 ,`(F22-0;80 • f "tI') '_'I-o-1 7Y the driveway, should be 21' because the 5' wide sidewalk does not provide the 2' overhang space and allow for reasonable pedestriELn circulation. 7. City Light & Power development charges will apply for the extended parking lot area only at the time of development. At the current rates, the amount will be $444.00 (plus or minus). 8. City Water & Wastewater comments have been forwarded to your engineer on red -lined copies of the Landscape Plan and Grading Plan. 9. An effort: must be made to prevent people from parking autos on the private street, as is often done now. The additional on - site parking and improved functional aspects of the TACO BELL site should make this possible. "No Parking" signs on the street are an option that may have to be implemented. 10. A Drainage Plan and Report is necessary due to the amount of additional impervious area created with this parking lot. 11. The overall landscaping looks good, however, the south portion of the property needs more material. Additional trees and shrubs should be included to provide the necessary screening of auto ,headlights from potential residential to the south. There are a mix of crabapples, plums, and r1issian olive along the west property line to break up the expanse of fence. Do you plan to continue that treatment on the new lot? This concludes staff comments at this time. In order to stay on schedule for the July 22, 1991 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due July 3, 1991. Please contact me for the required numbers to submit PMT's, colored renderings, and revisions are due July 15, 1991 Final documents are due July 18, 1991 I suggest we meet to discuss these comments at your earliest convenience. Please call me at 221-6750 to schedule a time. S,iptrelyfi Stephe Olt Project Planner xc: Kerrie Ashbeck