DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 00-13 Issuance Date: "es, " D6 —t�Q
Project Name: Fairbrooke Heights PUD 3"' filing
Project AXA: N/A
Project Location: West of Summerville Drive and South of Prospect and East of Overland
'frail
Permittee: Eric Booton
City and developer contacts: See attached Exhibit A for names and phone numbers of all
contact persons for this project.
Fees: Permit Appliication Fee (paid at the time of application) PD $300.00
Inspection .flee $1651.20
Total $1651.20
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
Form of security deposited with the City: None Required
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide as -constructed plans prepared by an Engineer prior to
the Citys acceptance of the constructed public improvements. (All references above to the terms
Project Engineer and Engineer shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions; Normal work hours
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code
or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is
applicable, are met. If the Development Agreement does not specify times for completion of
public improvements, or if there is no Development Agreement, then the improvement
requirements specified in Section 24-95 of the City Code shall apply, which provides that
construction of all improvements shall be required prior to the time of issuance of the first
building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and the
as -constructed plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMPs) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit
is issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: Notify the City Engineering construction Department a minimum of 48
hours prior to beginning construction at 221-6609.
Permittees acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter
upon such property to perform work required of the applicant if the applicant were to fail to perform the
required work. I also acknowledge that I have read this permit document with all its requirements and
conditions. and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Managers Signature: �C`;`,1,._ Date: 5 - Z-
Approval For Issuance:
City Engineer Approval: C� 1 Date: LZ�'��
EXHIBIT A
Project Name: Fairbrooke Heights
Project AKA:
City Staff contacts:
Development Engineer: Dave Stringer
281 N. College Ave. Fort Collins, Co. 80524
970 221- 6765
Construction Inspector: Lance Newlin
281 N. College
970 221-6605
970 222- 0854
Water utilities Engineer: Roger Buffington
700 Wood Street
970 221- 6854
Erosion Control Inspector: Bob Zakley
700 Wood Street
970 221- 6063
Traffic Operations:
Street Closures:
Transportation Planner:
Forestry:
Light & Power:
Ward Stanford
625 Ninth Street
970 221 - 6615
Sly Mireles
625 Ninth Street
970 221- 6815
Kathleen Reavis
210 E. Olive
970 221- 6140
Tim Buchanan
281 N. College
970 221- 6361
700 Wood Street
970 224 — 6700
US West: Tim Weaver - 970 377- 6401
CC AvA'tl�� �:�T2C�4CTC:2
�
Name: /, N E LL )�U
Address: .Sv 5� . _ z �M�r T-Co
Phone number(s):
Office: Z2- - 3 �
Cellphone:
Fax member:
Email:
Concrete contractor for flat work
Name:
Address:
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Concrete contractor for structures:
CON Dl �Tr
Name: 13: AT T1+IS II IME-
Address:
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Paving contractor: &c) -P�, T3i-i c rA -(1-I TICS
Name: _ ; rF(- AT j N1s T11l E
Address:
Phone number(s):
Office::
Cellphone:
Fax number:
Email:
Landscape contractor: AAD �U BU C F#qC ( i-f 7-f FS
Name: Cil\)OF(1D6t> ("T- Z-C Br'- AT TfffS_'TlN�_
Address:
Phone number(s):
Office:
Cellphone:
Fax number: '
Email:
Other contractors and parties involved in the project: