HomeMy WebLinkAboutFAITH EVANGELICAL FREE CHURCH SECOND - Filed DCP-DEV. CONSTRUCTION PERMIT - 2003-10-17City of fort Collins
Transportation Services
I maineering Department Development Construction Permit, Page 1/4
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 02-05 Issuance Date: — :2 _- C
Project Name: Faith Evangelical Free Church 2nd Filing
Project Location: South of Horsetooth and East of Shields Street
Permittee: Andrew Lavaux
9195 West 6th Ave.
Lakewood Co. 80215
City and developer contacts: See attached Exhibit A for names and phone numbers
of all contact persons for this project.
Fees: Permit Application Fee (paid at this time) $300.00
Construction Inspection Fee (paid prior to issuance of this permit) $3,086.80
Erosion Control fee (paid prior to issuance of this permit) �„ ^
$3,386.80
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the
development. $258,246.59
Form of security deposited with the City: Cash will be escrowed with the City
until the bank letter of credit is obtained. When said letter of credit is submitted and
accepted by the City along with a written request to release said cash escrow the
monies held in escrow shall be released.
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into
all design drawings and specifications the certification of all materials testing by an
Engineer. The Permittee shall have an Engineer prepare revised design drawings and
secure City approval for all revisions to the Utility Plans and related documents. The
Permittee shall have an Engineer represent, as required by the City in the Development
Agreement, that the improvements are constructed in conformance with the approved
Utility Plans and the standards and specifications of the City. The Permittee shall
'_)�I �'nrth(ollr:�r V•:rnuc P(I Bos.5RO • Fort ColllnsJ-080;22-0580 • (970)221-6605 • FAX(9/0)LGI-buts
1vwN%.rCg0v.Com
Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person
responsible for the design of this project, responsible for certification that improvements are
constructed in accordance with approved plans, responsible for malting revisions to plans with City
approval and for providing as -constructed plans):
Name: i m ANeu MngsY Tr-1 E SE4g- Rn nwn) G-3 R-o t 1n
Address: m M�f J61 �Fu IZLvD 5u+rE19n Lo••F �� . ('n. _ 8053g
Phone number(s):
Office: cn o) 461 - Z&oa
Cellphone:
Fax number: (97o) q�,l-ZAO
Email:
Professional License Number:
Developer (The party or parties referenced in the Development Agreement who are responsible for the
Developer's obligations contained in the Agreement —add additional names below):
Name: -rU l-A*-SO J Gaoup
Address:
Phone number(s):
Office: -719 y71 7c
Cellphone:
Fax number: 70,
Email:
General Contractor (The contractor in overall charge of the public infrastructure construction):
Name: P�ntk4ao t �� r2uc no J
Address: 919n en9es-r. Cn *w A,)&Jt7c' 1-nbak900") Co 60Z[5
Phone number(s):
Office: 86- y5S5
Cellphone
Fax number: SoSD
Email:
If you have no General Contractor, list all other contractors below.
Grading contractor:
Name:
Address:
Phone number(s):
Office:
Cellphone: _
Fax number:
Email:
Utility contractor:
c r),703
Name:
Address:
Phone number(s):
Office:
Cellphone: _
Fax number:
Email:
Concrete contractor for flat work:
Name:
Address:
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Concrete contractor for structures
Name:
Address:
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Paving contractor:
Name:
Address:
Phone number(s):
Office: _
Cellphone: _
Fax number:
Email:
Landscape contractor:
Name:
Address:
Phone number(s):
Office: _
Cellphone: _
Fax number:
Email:
Other contractors and parties involved in the project:
3
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
• 81/2"xl1" copy of the Site Plan
• Proposed Project Schedule
• Project quantities and cost estimate for all of the public improvements to be constructed.
In addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
❑ Traffic control plan(s) for the project
❑ Proposed haul routes shown on a City map
❑ Shop drawings
❑ Other
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to
discuss plans and special requirements for your project, is required for all development projects. The
people required to attend the meeting are the Project Manager, Project Engineer, Developer,
Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of
the contractors expected to work on this project)
People to Attend: List the peoples names and titles for those who will attend the pre -
construction meeting:
Name
Title
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated
value of all public infrastructure improvements that will be constructed and accepted by the City to
own and maintain. In addition provide the value of all private infrastructure improvements that the City
will inspect and require certification for. The estimate shall be in the same format as the attached sheet
titled "Project Quantities and Cost Estimate Sheet."
Public infrastructure, estimated cost: S 10en, Lfg7,1 1
Private infrastructure, estimated cost: s zsa� 48
I certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if
necessary, to enter upon such property to perform work required of the applicant if the applicant were to
fail to perform the required w rk.
Applicant Signature: / Date:F- /n 7
'r�Zpyr.CsF�.rC 1 �%�Z
w
w
w
x
w
Q
f
w
w
f
N
O
U
a
Z
a
w
w
H
Z
a
7
Q
F
U
W
O
a
O O O O O O O
O O O O O O O
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 m
O O O O O
0 0 0 0 0
rMA
IXSS
0 0 0 0 0 0 0
[O f9 fA fA fA f9 rn
0 0 0 0 0 0 0 0 0 0 0 o ri
M r m V N m M (O M M N fA V
o 0 0 0 o
M EA f9 m (D
'
p
W
�
�» w
wNm f9 N� w mm rm »
w
b
p
�
minor
O
U
i
O
vw
z
H
W
s
w
J 0
a
a
m
O Z LL
y
z
O O o 0 0 0 0 0
m O m 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 m m m
0 0 0 0
M M m m
J
O O O O
>
>
f
LL
W a>x
W
2
LU
LL w0}_
>
w w a m
O
Z LL
W
O O O O
o 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 o m
o 0 0 rn O
Y"
O
N N t7 N N N O
O t0 O �O y r �O O> r O O rn
O Incr m
W-
FQw.':
�noMVM�nmo
rnrnom oc�m rncocN�m
N.
❑?
O � m m-m � m M
� (V V rn N V N N M V N
� N N rn Oto'.'
a
fir, ;cc
=: w
F H LL N
0w=U
�`3
W
W
o 0 0 0 0 0 0 o
O o 0 0 0 0 0 0 0 0 r m r
o 0 0
0
K
z
jr
W r
F}
Maoi riN ��cio
V M N N rn O
ui ono �n vionvi of l�rui cri
M V m M N m rn rn O) N r
o�o�m
r fA ffl
,
Ncl
Lo
O
z W
W
?w
Z 0 0
a
m
—oop
u
V
OF
W
N �O
N rn
v m rn m
p
W W
N
W
x Z
Vn W
r�
Z
In W
J
°
0
F
}} W
For F
W
fN
p
f Z >
00
O
Q
a
z
w O a
F W
0
xxx x
xxxxxxxxxx
} LLco
LL
i00
w W
Ox
(A NLL
LL LL U U U LL U
U U U U U U U U U U LL LL LL
NY LL
J J J Q Q Q J Q
Q a Q Q a Q Q Q Q Q J J J
J w 0 J J
F M
Q
W W W W
W w W W W W W W W W
O
Z W
r
Z
Z N
O
W
u u
x U
J
W
m
W
Q
F H
j
U
K H
L
a
V
a til
n¢ c
t
QZ
as .� o o
•---
W
U
y
p W
m m u
N N N N N
J
r r
L N
Q
z f
3
p¢
W
V>
o o u
U rn rn U_
c c
Q Q
0 z
J0
K
U U W W
Z
o Z
Mc'M
R
=
z m LL
m d a N
c
a f
m o u `
OO
m > w w y c m J
U; m 00f
d m yFw
i iy lL N
3
Q
W
KQQ
Nd d jUU o
3Nmam ai d m 4)mo>_
IEO
>
E K
Q Qa
mNmm
X > OO
3
U m v U v
=
V
m m LL m m U U m N m m m
RCPTN 99047621 06/02/_ 09:28:00 # PAGES - FEE - $16.00
M RODENBERGER RECORDER, LARIMER COUNTY CC) STATE DOC FEE - $.00
NOTICE OF REIMBURSEMENT OBLIGATION
TO ALL PERSONS TAKE NOTICE OF THE FOLLOWING:
WHEREAS, Section 24-95 of the Code of the City of Fort Collins further provides that if
the City has constructed such local portion of a public street adjacent to underdeveloped property
or property that may be redeveloped, the City may require, at or before the time of issuance of
any building permit for new development or change of use, that the owner of such adjacent
property repay to the City its cost in constructing such local portion of such street; with the
amount of reimbursement to be paid to the City to be no less than the original cost of the
improvements plus any mutually agreed upon amount to reflect the effects of inflation, if any; with
the original cost of the improvements to mean the cost of financing, engineering, construction and
any other costs actually incurred by the City which are directly attributable to the improvements;
and
WHEREAS, the City has improved Shields Street as part of the Street Oversizing
Program which improvements include full reconstruction from 900 feet south of Troutman
Parkway to Horsetooth Road, bringing the road up to Arterial standards. Improvements include
5 foot detached sidewalks and intersection improvements at Troutman Parkway, Wabash Street
and Arbor Avenue, six-foot bike lanes and raised and planted medians. Construction has been
completed, inspected and accepted by the City; and
WHEREAS, the cost incurred to the City of the aforesaid improvements is in the sum of
$1,250,279.01;and
WHEREAS, a portion of the property which is adjacent to or abutting upon such
improvements is, at the time of this notice, owned by a party and located in the County of
Larimer, State of Colorado; the ownership, description and reimbursement obligation being more
particularly described as follows, to wit:
Owner: Chism Homes, Inc.
4535 W. Sahara Ave., #100
Las Vegas, NV 89102
Parcel Number(s): 97352-00-027
Legal Description: See Attachment "A"
Reimbursement Obligation:
Engineering
$
3,355.32
Surveying and Quality Control
$
1,580.49
Permits and Fees
$
226.71
Earthwork — Removal
$
6,792.98
Drainage, Landscape and Sewer
$
-
Concrete
$
15,580.64
Asphalt Paving $ 19,490.40
Total Reimbursement Obligation: $
47,026.54 (plus inflation factor)
NOW, THEREFORE, all persons lake notice that at such time as the above -described
property should be developed or redeveloped, the City may require, at or before the time of
issuance of any building permit for any such new development or change of use, the owner of
such adjacent property repay to the City its costs as aforesaid in constructing the above -described
improvements, all in accordance with Section 24-95 of the Code of the City of Fort Collins.
DATED this 2 day of —> 19_J
ATTEST:
City Clerk
APPROVED AS TO FORM:
�ii �utiv
Deputy City Attorney
STATE OF COLORADO)
ss.
County of Larimer
CITY OF FORT COLLINS, COLORADO
A Municipal Corporation
By: ge, q
City Manager
The foregoing was subscribed and sworn to_before me this '=�) Q day of
�> 19,!;)g , by J I f ,City Manager and
City Clerk, of the City of Fort Collins, Colorado.
Witness my hand and official seal.
Notary Public
My Commission Esp �'
Development Construction Permit, Page 2/4
provide as -constructed plans prepared by an Engineer prior to the City's acceptance
of the constructed public improvements. (All references above to the terms "Project
Engineer and engineer shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: Normal work hours
4. The applicant understands that additional permits maybe required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this
project (utility plans, site plan, landscape plan, development agreement, soils report,
pavement design, traffic study, drainage report, plat easements and any other official
documents), shall be kept on the development site available for use by City staff doing
inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of
this permit, this permit shall expire and the applicant will forfeit the permit fee paid
for this permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The
applicant may apply for an extension by reapplication at least two weeks prior to the
expiration date. Such application shall contain information sufficient to justify the
granting of the extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use
Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever
is applicable, are met. If the Development Agreement does not specify times for
completion of public improvements, or if there is no Development Agreement, then the
improvement requirements specified in Section 24-95 of the City Code shall apply, which
provides that construction of all improvements shall be required prior to the time of
issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection
has been conducted by the City; (2) punch list items from the final inspection are
completed and accepted by the City; and (3) required certifications from the licensed
professional engineer that improvements are completed to City standards, specifications
and approved Utility Plans; and the Aas-constructed@ plans have been received and
Development Construction Permit, Page 3/4
accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance
by the City of the completed improvements, in accordance with Sections 29-13 and 29-14
of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and
3.3.2(C) of the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours
prior to any planned construction on this project. All required perimeter silt fencing and
other erosion/sediment control best management practices (BMPs) that can be installed
prior to construction must be in place and inspected by the City Erosion Control Inspector
before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a
permit is issued by the Colorado Department of Transportation to allow such work to
begin.
12. Other conditions: No Public Curbs, gutters, sidewalks or street paving shall
ocurr until a Pavement Design Report has been submitted to and approved by
the City
Permittees acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and
authority of the owners of the property (including all owners having legal or equitable
interest in the real property, as defined in Section 1-2 of the City Code; and including
common areas legally connected to or associated with the property which is the subject of
this application) without whose consent and authority the requested action could not
lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter
upon the property for purposes of inspection and, if necessary, to enter upon such property
to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements
and conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/F
Signature:
Approval f
City Engin6vi
Approval:
i
Date: r/1lot,
(Permit Issuance Date)
MAR-27-2002 15:36 PINKARD CONSTRUCTION 303 985 5050 P.02
L'^
W
W
x
N
w
a
w
W
w
fn
O
U
O
Z
a
N
41
F
Z
a
Q
U
w
gr
IL
0Oo o O O O O p S o
Q o on.
O Op S O o p p pS O O ro O
0. O
0000
Wgam
p f66 vicli
(p RNm m 96
(pO CC (C
p
fA f9�t0
Q
ffAA
Q
M
V
J
2
FOq6„:R.W
6
i
m
y
F.�..a
O
z
p
f O O rOp O O O S O
pp pp pp
O b 0 0 0 0 6 0 0 l p t 0 S S
M S S
J
� = Q. �
� �Op (A n r m [O[pp Q1
M fA Vi 49 iA
l0l cOcpp �O�pp f0 th M M {O� M M �l fA 69
f9 lA F9 fA (A fH iA
fA b09 !9
o..:.= W.0
f9 M
4!
V w-9m
Z
w,d O;r
w
w
o S Qu o 0 0 o g
o S g o 0 o g o 0 c rn= o
S o 0
a
Ir
/�r-
lV iCi i[i �[i p
V rn r N 8
vi tp O f0 er T n v O O
d d (O
v�i
O n ai p
'f
cOo rmp O N
N g 6 V_ N
0 0
W
a 41
r' w �
C
a
w
2
o00 0000
OOOS p 000
0 000 00��p no
OS SOOOSO P!D (OOo
00
So In
3
Q
w
mZ F
f 0 2
W r
}
a
of d of Lei �ti Sri o
v m N Of O
M M Nf m m W 0
ui (p t� Fi 7 n ni ci n n vi cv o
r• p m m N cO m m N n f9
to
o �0
(9
2
Ly
m
of O c 1� N c(0� V �D R 99 t»
ei
W
ir.V.W.y,NuOi»'»
7
��IAfH{9�MmW
QW
>
o
>
z��o�aia
m
A
O
W W
N
N 0 N
R OMi m
2 Z.
•- .-
W N
O
~ V
W
} Z
Z
1- W ~
t
J
Q W
5 �
o a
z
a
O
wlCY
vz
wg
u
�'m
yy.
T 2 2 2
LLLLLL V QUQ aUa LL.
z 2 S 2 T S S S 2
V UQUQl IL liLL
y}LL.k
y Z
ZO
j iu
QUQ
JJJ4 W W "' 41
LLl
QQU QUQU
QUQ QVQ QUQ
W W W W W W W W JJ�J
Jy JJ
}0.
� 0
V W
F
w
0
ts s
_Z y
IL
W V
O w
Qw
Lo 2 (q
W 1-
!%J
2
O
JQ.
U U W W
v'C
Q
��
1
m �`m
m
T.
3
d.JLu
c �.
'� LL LL o
> W W .'•i L m
3 2 m o o 2 y
y
y x
a
.�>UU o'�O
Mm0 3
w
~�
N, = m N e c iV } m L N ti
C of a% q
j w
m_ m
!L
X R m Co cO LL? CV LL1-
.- d
cD li c0
Development Construction Permit, Page 4/4
PINKRRD CONSTRUCTION
I
I
o�
io.
101o o'�Qie�
�o.o
303 985 5050 P.03
i
i
I
MRR-27-2002 15:36
i
1
a
u
I I�
I
I I
1 i I!
D �T�a
r lull \ K 1 AE W E ST
A Subsidiary of Banque Nationale de Paris
CALIFORNIA
City of Fort Collins
300 LaPorte Avenue
Fort Collins. Colorado 80521
Dear Sirs:
Intemational Department
San Francisco, CA 94104
DATE
Irrevocable Standby
Letter of Credit
No. SP-3364/069.
May 9, 2002
We hereby establish, at the request and for the account of Faith Evangelical Free Church of Ft. Collins, 1601 W.
Drake Road, Fort Collins, CO 80526, in your favor as beneficiary, our Irrevocable Letter of Credit No.
SP-3364/069, in the amount of Two Hundred Fifty Eight Thousand Two Hundred Forty Six and 59/t00 U.S.
dollars ($258.246.59) (as more fully described below), effective immediately and expiring at the close of
banking business on November 1", 2003 at our office at 180 Montgomery Street, San Francisco, CA 94104.
This Letter of Credit is intended for the funding required for the Faith Evangelical Free Church of Ft. Collins
Development Project ("Development Project') for the assurance of the completion of the construction and the
maintenance and repair of the public infrastructure in connection with the aforesaid development project and its
associated development agreement and development construction permit. Funds under this Letter of Credit are
available to you for one or more drawings prior to the close of business on November 1", 2003, against sight
drafts in an aggregate cumulative amount not to exceed $258,246.59, dated the date of presentment, drawn on
our office referred to above, referring thereon to the number of this Letter of Credit and accompanied by your
written certificate signed by you and acknowledged as therein provided in the form of Exhibit I hereto.
Presentation of such draft and certificate shall be made at our office referred to above.
Upon the earlier of (i) our honoring your drafts) totaling $258,246.59 in the aggregate presented on or before
this Letter of Credit expires pursuant to the terms herein or (ii) the surrender to us by you of this Letter of
Credit for cancellation, this Letter of Credit shalt automatically terminate.
This letter of credit shall be subject to the Uniform Commercial Code as in effect in the State of California, and,
to the extent not inconsistent with the terms of this Letter of Credit and the Uniform Commercial Code, the
Uniform Customs and Practice for Documentary Credits, 1993, revision, ICC publication number 500.
This Letter of Credit will be automatically extended without amendments for one year from the present, and
each future, expiration date thereof, unless Issuer sends written notice at least sixty (60) days prior to any such
expiration date to the City of Fort Collins of its intent not to renew this Letter of Credit. Any such notice shall
be in writing and be sent by overnight courier.
This Letter of Credit is not transferrable.
This Letter of Credit sets forth in full our undertaking, and such undertaking shall not in any way be modified,
amended, amplified or limited by reference to any document, instrument or agreement referred to herein, except
Only the certificate and drafts) refered to herein; and any such reference shall not be deemed to incorporate
herin by reference any document, instrument or agreement except for such certificate and draft(s).
Bankthe West COPY
San Francisco
zed signatu es.EVelyn Chang
Assistant Vice President
International
rTHE MOVE
May 10, 2002
City of Fort Collins
Attn: Mr. David Stringer
281 N. College Ave.
Fort Collins, CO 80522
Dear Mr. Stringer:
"I krnmo you, deeds Behold. I hale pet brfore you AN OPEN DOOR w,Nd, no nne car, rhut"
KeveLttFor, 3:8
We hereby request that the City of Ft. Collins release our $258,246.59 held in escrow to
guarantee the completion of all public improvements for our project.
Please replace our cash escrow with the attached a letter of credit from our lending
institution, Bank of the West.
Thank you for your attention to this matter.
Free Church
Rex 'Smithgalt
Administrator
FAITH EVANGELICAL FREE CH U R C H
1601 West Drakc Road Fort Collins, Colorado 80526 (970) 226-2095 Fax: 970-229-9670
c-mail: faida0faithefc.org w vw.faithcfc.ory
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(1/7/99)
For City use only: Application Number: Application Date: .3 O
Permit application fee: S '.�3 p O . OO
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary
documents and submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer
at 221-6750.
3. Submit the Application and pay the Application Fee at the fee at the Engineering
counter at 281 No. College Avenue.
PROJECT INFORMATION: I ��,, ..�
Project Name (as approved by the City): -T ,,, w
7�'ArTg EVArJ FF*Lir_.+c-- ���' C_�re c.l•1 2 rI LI,�.c C. 3- /�7�
Project A.K.A. (Marketing name if different from Project Name):
Project Location: 0120 5o.7rli S H 1 ELns
FT. rnj`",'Li r_ o05Z.C.
Property Owner(At the time of this permit issuance);
Name
Addre;
Phone
Email:
Cellphone:
Fax number: (3�o)Z25 -°1ti-70
Applicant/Project Manager (The primary contact person for all matters regarding this project, and
the person responsible for all matters referencing "the Developer" in the Development Agreement for
this project): //..
Name:
Address: 91g5 (,A-ST- r "ru 907 15
Phone number(s):
Office: (303) 9S6 -45.45
Cellphone:
Fax number: (3e,a cl 85 - Sos o
Email: