HomeMy WebLinkAboutARLINGTON TOWNHOMES - Filed DA-DEVELOPMENT AGREEMENT - 2003-09-17SUBDIVISION AGREEMENT
THIS AGREEMENT, made and entered into this rV day of
A.D. 1979, by and 'between THE CITY OF FORT COLLINS, COLORADO, a Municipal
corporation, hereinafter referred to as "the City," and CHARLES F. MUENZBERG,
hereinafter referred to as "the Developer,"
WITNESSETH:
VHEREAS, the Developer is the owner of certain property situate in the
County of Larimer, State of Colorado, and legally described as follows,
to -wit:
PINEWOOD TOUNHOMES FIRST FILING; being a replat of a part
of Tract "A" Scotch Pines First FilinC, situate in the
Northwest. 1/4 of Section 25, Township 7 North, Range 69 West
of the 6th Principal Meridian, City of Fort Collins, County
of Larimer, State of Colorado.
WHEREAS, the Developer desires to develop said property as a resi-
dential subdivision and has submitted to the City a subdivision plat (and
a site plan of said property is to be developed as a Planned Unit Develop-
ment), a copy of which is on file in the Office of the City Engineer and
made a part hereof by reference; and
WHEREAS, the Developer has further submitted to the City a utility
plan for said lands, a copy of which is on file in the office of the City
Engineer and made a part hereof by reference; and
WHEREAS, the parties hereto have agreed that the development of said
lands will require increased municipal services from the City in order to
serve such area and will further require the installation of certain
improvements primarily of benefit to the lands to be developed and not to
the City of Fort Collins as a whole; and
WHEREAS, tht City has approved the subdivision plat (and site plan
where applicable) submitted by the Developer subject to certain require-
ments and conditions which involve the installation of and construction of
utilities and other municipal improvements in connection with said lands.
NOW, THEREFORE, in consideration of the premises and the terms and
conditions acknowledged by the parties hereto, it is agreed as follows:
1. Except as otherwise herein specifically agreed, the Developer
agrees to install and pay for all utility lines, storm drainage facilities,
streets, and other municipal facilities necessary to serve the lands within
the subdivision.
2. Water Lines.
a. The Developer agrees to install all water lines as shown on
the utility plans in accordance with the requirements and as shown on said
plans, whether such lines are actually on the property, bordering the
property, or cn other lands connecting the subject property to the existing
City water distribution system..
b. Such water lines shall be installed in full compliance with
the standard specifications of the City on file in the office of the City
Enoineer and applicable provisions of the City Code relating, to the instal-
lation of such lines.
c. The Developer understands and aqrees that no building permit
for any structure in the subdivision shall be issued by the City until the
water line and the fire hydrant serving such structure is installed and
accepted by the City.
d. A.nv water lines described on Exhibit "A," attached hereto,
shall be installed within the time required on Exhibit "A." If the City
Ennineer determines that any lines shown on the utility plans are required
-2-
to provide service to other areas of the city, those lines shall be in-
stalled within the time determined by the City Engineer.
e. All of said lines shall be installed at the sole expense of
the Developer.
f. The installation of said line shall be inspected by the Public
Works Department of the City and shall be subject to such department's
approval. The Developer agrees to correct any deficiencies in such instal-
lation in order to meet the requirements of the plans and the specifica-
tions applicable to such installation.
3. Sanitary Sewer Collection Lines.
a. The Developer agrees to install all sanitary sewer collection
lines shown on the utility plans, whether the same be on or off the subject
property.
b. Such sanitary sewer lines shall be installed in full corc-
pliance with the standard specifications of the City on file in the office
of the City Engineer relating to the installation of such lines.
c. The Developer understands and agrees that no building permit
shall be issued by the City for any structure in the subdivision until the
sanitary sewer line serving such structure is installed and accepted by the
City.
d. Any sanitary sewer line described on Exhibit "A," attached
hereto, shall be installed within the time required on Exhibit "A." If the
City Engineer determines that any lines shown in the utility plans are
required to provide service to other areas of the city, those lines shall
be installed within the time determined by the City Engineer.
e. All of said lines shall be installed at the sole expense of
the Developer.
-3-
f. The installation of said lines shall be inspected by the
Public Works Department of the City and subject to such department's
approval. The Developer agrees to correct any deficiencies in such instal-
lation in order to meet the requirements of the plans and the specifica-
tions applicable to such installation.
4. Electric Lines and Facilities. The City Light and Power Depart-
ment shall install all electric distribution lines and facilities required
for the subject property, and the Developer shall pay for such work in
accordance with the established charges of the Light and Power Department.
Such installation shall include all street liqhts required for the develop-
ment.
5. Storm Sewer Lines and Facilities.
a. The Developer aqrees to install all storm sewer lines and
facilities as shoo-in on the utility plans.
b. Such storm sewer lines and facilities shall be installed in
full compliance with the standard specifications of the City on file in the
office of the City Engineer relating to the installation of such lines.
c. The Developer agrees to complete the installation of detention
facilities prior to the issuance of more than 25 building permits.
d. All of said lines and facilities shall be constructed in an
orderly fashion, as determined by the City Engineer, so as to prevent
damage to other utilities, streets, curb, gutter, sidewalks, and all
adjacent properties.
e. All of said facilities shall be installed at the sole expense
of the Developer.
f. The installation of all such lines and facilities shall be
inspected by the Public Works Department of the City and shall be subject
M
to such department's approval. The Developer agrees to correct any defi-
ciencies in such installation in order to meet the requirements of the
plans and the specifications applicable to such installation.
6. Streets.
a. The Developer agrees to install all streets shown on the
utility plans, complete with paving, curb, gutter, and sidwalks.
b. Such streets shall be installed in full compliance with the
standard specifications of the City on file in the office of the City
Engineer relatiiq to the installation of such streets.
c. No building permit for the construction of any structure in
the subdivision shall be issued by the City until the street providing
access to the structures is improved with at least the gravel base re-
quired. Furthermore, no building permit shall be issued by the City
for any structure located in excess of six hundred sixty (660) feet from a
single point of access.
d. Any streets described on Exhibit "A," attached hereto, shall
he installed within the time required on Exhibit "A." If the City Engineer
determines that any streets shown in the utility plans are required to
provide access to other areas of the city, those streets shall be installed
within the time determined by the City Engineer.
e. All of said streets shall be installed at the sole expense of
the Developer.
f. The Developer agrees to correct any deficiencies in such
installation in order to meet the requirements of the plans and the speci-
fications applicable to such installation.
g. Street improvements shall not be installed until all utility
lines to be placed in the streets have been completely installed and all
-5-
services to individual lots have been installed from main utility lines to
the property line.
h. The Developer agrees to provide and install at his expense
adeouate barricades, warning signs, or other devices on the dead ends of
streets to be continued, unfinished crossings, and other sites designated
by the City Engineer as areas requiring such measures to insure the public
safety.
7. Other Requirements.
None
5. Miscellaneous.
a. The Developer shall provide the City Engineer with certified
record utility drawing transparencies upon satisfactory completion of
utility construction for his use in making record prints for the City's
files.
h. This Agreement shall be binding upon the parties hereto, their
heirs, personal representatives, and assigns.
c. Nothinq herein contained shall be construed as a waiver of any
requirements in the City Subdivision Ordinance or any other provision of
the City Code, and the Developer agrees to comply with all requirements of
the same.
THE CITY OF FORT COLLINS, COLORADO
A Municipal Corporation
By:
City Manager
APPR44ED: r —?
Director of Public Wor s
nn=C —�
/fss,7-City Attorney
Developer Charles F. Muenzbergle
-7-
EXHIBIT "A"
1. Schedule of water lines to be installed out of sequence.
Not applicable.
2. Schedule of sanitary sewer lines to be installed out of sequence.
Not applicable.
3. Schedule of street improvements to he installed out of sequence.
Not applicable