City of Fort Collins
Planning Department
March 25, 1994
Linda Ripley
Ripley Associates
117 East Mountain Ave.
Fort Collins, CO 80524
Dear Ms. Ripley,
City Staff has reviewed your submittal for Fairbrooke PUD Tract A
Preliminary and Fairbrooke Amended ODP, and offers the following
written comments:
1. Review of these plans should not be construed as a commitment
that telephone facilities sufficient to serve this project are
presently available. US West will provide telephone service
.in accordance with the rates and tariffs on file with the
Colorado 'Utilities Commission.
2. Telephone facilities generally occupy .rear lot utility
easements, which must be located on terrain which permits
trenching operations.
3. The developer is responsible for provision of all trench,
street crossings, and ditch crossings for telephone facilities
within the project, and the developer pays up front
construction costs for facilities within the development.
4. Any relocation of existing telephone facilities required by
these plans will be paid for by the developer.
5. Fire hydrants must be shown on the site plan and must be
within 400' of all dwelling units. Fire hydrants must be
capable of 1000 gpm with 20 psi residual pressure.
6. Please delineate the boundaries of Tract A with a bold line
and indicate that the area to the south, "Aspen Heights PUD"
is not part of Fairbrooke ODP.
7. The Holly Street to Larch Street connection should not be a
temporary connection, this connection is necessary to provide
vehicular and pedestrian connections between these
neighborhoods. Please change the note on the ODP.
8. Tract C is also "Presently Developed".
9. Staff would like a more detailed analysis of the density and
housing types in the general area. As stated in the
conceptual comments, dated January 10, 1994: "Please include
with the development submittal, an analysis of the general
land uses in the surrounding area (within a l or 1 1/2 mile
radius). What is the average density .of this area with and
without this project?" What are the unit types?
A reduction in density on this Tract goes against current city
policy to maintain density and multi -family areas on existing
master plans. It is your responsibility to justify single
family houses at this location, given the existing housing
types in the area. Most of Fairbrooke ODP is now single
family, but Tract G and the rest of H are under review for
attached patio homes (42 units total) and there are other
housing types to the west. Please expand your analysis in
order for staff to fully review this amendment request.
10. Please include _sheet 2 of the ODP. with the revisions.
Apparently it is confusing for some to have the land use
information for Tracts which don't show up on this sheet! You
can have a few blue prints made from the mylar on file in the
Engineering Department. We will need a PMT of both sheets for
the Planning and Zoning Board packet.
11. .What is the difference between gross overall and gross:
residential density on the ODP,.ie what has been left out?
12. Please- include a letter to the Stormwater utility addressing
the overall drainage for the ODP. Please contact Glen
Schlueter- at 221-6589 if you have questions.
13. A new soils report will be. required with: the final submittal.
,.The -submitted report is outdated (1981). The report should
address- the fact. that the ditch was relocated and should
address ground water concerns and soil conditions during the
irrigation season. Retesting needs to be done during the
irrigation season. If you have questions about the
requirements for this report, please contact Kerrie Ashbeck at
221-6750.
14. Stormwater comments for the preliminary plans will be sent
under separate cover.
15. Rear lot utility easements, with a minimum width of 81, are
required. See attached map.
16. Utility easements are needed adjacent to the right-of-way
where Sommerville Drive crosses the Pleasant Valley and Lake
Canal.
17. No trees shall be planted within 4' of gas lines, as noted on
the plans.
18. See attached street light locations from Light and Power.
19. Lot areas must be shown on the plat. There are concerns about
the 15' front setback. Typically a 20' setback is required to
ensure that cars fit in the driveway and do not overhang over
the sidewalk. We have approved shorter front setbacks,
provided that the driveway is a minimum of 18' in length.
20. Please include a landscape note regarding the timing of
installation of landscaping and that there will be no
certificate of occupancy issued, until all the landscaping is
installed and approved, or until a letter of credit is
provided to the City.
21. Sight line is restrained at the intersection of Holly Way and
Holly Street as noted in the traffic report. The final plat
should show necessary sight distance easements. Notes
regarding landscaping and fencing restrictions in these
easements shall be added to the site and landscape plan.
22. A formal written variance request is required for the square
cul-de-sa.c design. This needs to be prepared by a registered
traffic engineer. Issues with the proposed design are as
follows: maintenance, including street sweeping; long term
maintenance of the patterned concrete paving. material; on -
.street parking capacity; driveway location and function from
a safety and practical standpoint; debris build up and storm
drainage problems with square corners; and fire truck turning
capability. Planning would like to see you pursue this matter
with a registered engineer and would assist you in setting up
a coordination meeting with Engineering, Fire, Transportation,
etc. There is the option to design and construct the streets
as private streets, which the .homeowners. would own. and
maintain.
23. The cul-de-sacs must provide a minimum of 401. outside radius
for fire equipment to turn around in.
24. There is a pedestrian trail master planned along the PVL
Canal. This needs to be shown on the PUD plan. Please
contact 'Leslie Bryson at Parks and Recreation to find out
which side of the canal the trail needs to be on. The Tract
needs to be wide enough to accommodate the canal, and trail
which will serve as an access road for the ditch company. The
trail needs be shown on the plat as well.
25. The ditch company must sign off on the plans and plat.
26. Parkland fees are $779.00 per dwelling unit, collected at the
time of building permit issuance.
27. Pedestrian connections need to be examined. Staff would like
to see a connection to Prospect Road from one of the cul-de-
sacs, depending on which side of the canal the bike trail is
on (connection needs to be on the opposite side).
28. Please provide a cross-section through the canal area, showing
backyards, fencing, trail, canal, etc. Staff recommends
limiting the rear lot fencing along the canal to 5' to prevent
an unattractive alley way. Lower fencing encourages
homeowners to plant trees and shrubs for additional privacy
and the entire neighborhood benefits. The area along the
Shepardson Channel, between Nelson Farm and Collindale shows
what an alley of 6' high solid fencing feels like.
29. The landscaping "easement" along Prospect Road should be a
separate "tract" owned and maintained by the HOA.
30. In order to upgrade the arterial streetscape, staff request
that you include brick columns with the fence along Prospect
Road. The patio home project at Hampshire and Prospect is
providing a brick column element as well.
31. Have you explored other layouts to achieve a higher number of
solar oriented lots?
32. See attachment (note 44) for information.about site distance
restrictions.
33. The neighborhood meeting you requested is scheduled for April
7th at 7 pm at Bauder Elementary School. We will be sending
out the letters next week.
This concluders staff comments at this time. In order to stay on
schedule for the April 25, 1994 Planning and Zoning Board hearing,
please note the following deadlines:
Plan revisions are due April 6th (4 sets of plans and written
documentation responding to the above concerns),
PMT1s (one PMT of each plan sheet), colored renderings, and 8
prints are due April 18th.
Final mylars and other documents are due as soon as possible
following the hearing.
Please be aware that the development agreement and utility
plans must be signed prior to the Planning and Zoning Board
Hearing, for all PUD's. If not, a condition will be placed on
the project giving you 30 days to finalise the plans and
agreement, after which time, you must submit a request for an
extension, to the Planning and Zoning Board.
If you have any questions about these comments or would like to
schedule a time to meet to discuss them, please contact me at 221-
6750.
Sincerely,
Kirsten Whetstone, AICP
Project Planner
cc Kerrie Ashbeck, Engineering Department
Northern Engineering Services
Comm :y Planning and Environment 2rvices
Planning Department
City of Fort Collins
July 22, 1994
Ms Linda Ripley
Ripley Associates
223 Jefferson Street
Fort Collins, CO 80524
Dear Ms Ripley:
Staff has reviewed the request for Fairbrooke, Tract A, PUD,
Preliminary and Final and offers the following comments:
1. Any proposed relocation of the Pleasant Valley and Lake
Canal ditch must be approved by the PVLC Board.
2. No trees or landscaping will be allowed in the ditch right-
of-way.
3. No trees may be planted within four feet of any gas line.
4. An additional note should be placed on the landscape plan
stating that existing trees will be pruned to City Forestry
medium prune standard.
5. A utility easement is required adjacent to the right-of-way
where Sommerville Drive crosses the Pleasant Valley and Lake
Canal.
6. The block numbers on the plat document need to be improved
so they are readable.
7. The Pleasant Valley and Lake Canal needs to be designated as
a separate tract on the plat and site plan showing its
square footage.
8. Should there be a utility and drainage easement on the south
side of lots 27 and 28 of Block Two?
9. A soils report is required at the time of final submittal.
Please provide this to the Development Engineer.
10. The drainage report shows some flows going to an inlet which
is propDsed on the SID plans. Information needs to be
provided indicating when this inlet will be constructed and
where the drainage will flow in the interim.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
11. There must be an interim design completed for the Prospect
Road improvements. The SID plans can be used as a basis,
but this project needs a "stand alone" design for the
interim condition and ultimate widening. This was noted at
previous reviews.
12. The design engineer must submit a variance request to the
Development Review Engineer for all items which do not meet
the City's street design standards (ie. cul-de-sacs, less
than 240' minimum curvature on centerline, etc.)
13. A small radius should be provided at the entrance to each
cul-de-sac to eliminate the possibility of vehicles driving
over the square corner.
14. Sight distance easement boundaries must be clearly
identified (both the start and end) on the plat. Also, the
standard notes regarding restrictions within sight distance
easements must be added to the plat and landscape plan.
15. The Holly Street intersection with Somerville Court needs to
be reworked to line up the flowlines as indicated on sheet 7
of 13 of: the redlined utility plans sent to the engineer.
16. The mid -block crosspans must be designed for a 30 mph design
speed. Please include a centerline profile and transition
the crown in and our of the crosspan.
17. The plans must show that there is adequate room for the
standard bulb and 50' radii within the design for the cul-
de-sacs. Show sample turn movements, parking scenarios and
driveway locations that verify the design will work. There
may be a, need to thicken concrete or reinforce to prevent
crackincl or crumbling of corners if vehicles drive over
them. In the variance request, describe how the square
design is equal to or better than a standard cul-de-sac in
terms of design, safety, long term maintenance, etc.
18. Additional justification is needed for the solar variance
application. Please expand on the general idea that the
land configuration dictates that most lots will have an
east -west configuration. Address the variance request to
the criteria contained in the Land Development Guidance
System.
19. Drainage and Stormwater comments will be sent under separate
cover.
This completes the review comments at this time. Additional
comments may be sent as various reviewing agencies continue to
review this project. Please note the following deadlines for the
August 22, 1994 Planning and Zoning Board hearing:
Plan revisions (3 sets) are due August 3, 1994.
P.M.T.'s, renderings and 10 sets of final revisions are due
August 15, 1994.
Should you have any questions, please contact me.
Sincerely,
Robert E. Blanchard, AICP
Chief Planner
cc: Kerrie Ashbeck, Civil Engineer 1