Loading...
HomeMy WebLinkAboutETHAN ALLEN AT ARBOR PLAZA PUD - Filed CS-COMMENT SHEETS - 2003-07-310inr.. tv Planninn and Environmenta' n,,Ices I"tanning Department City of 1=ort Collins April 27, 1994 Bruce McLennan SEM Architects, Inc. The Quorum at DTC 7935 E Prentice Ave Suite 102 Englewood, CO 80111 Dear Mr. McLennan, City Staff has reviewed your submittal for Ethan Allen PUD at Arbor Plaza, Pad 2- Preliminary and Final, and offers the following written comments: 1. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Utilities Commission. 2. The owner is responsible for provision of all trench, street crossings, and ditch crossings for telephone facilities within the project, and the owner provides terminal room space and power for the main terminal at one building, generally in a janitor's closet or utility room. Contact Susan Peterson, at US West (303-224-7473) for conduit specifications for the main telephone entrance cable. 3. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 4. Please see attached letter from Terry Farrill regarding comments from the water and waste water districts. 5. The building exceeds 5,000 sf in area. An automatic fire sprinkler system is required in accordance with Sections 3802, UBC, as amended by the City of Fort Collins. If you have questions about this, please contact Sharon Getz, at the Building Department, at 221-6760. 6. If the gravel area is to be used for circulation or parking, it must be paved at this time. Otherwise, barricades, wheel stops, and no parking signs must be installed to prevent parking in this area. Barricades must meet access requirements of the Poudre Fire Authority. If this area is needed -to satisfy your parking demands, it must be paved. Staff strongly encourages you to pave this area as it is very likely to be used daily by customers and delivery vehicles. � � 1 Xorth C i )Ile e Avenue • 1).0. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 7. The site shall be accessible to persons with disabilities in accordance with Uniform Building Code Section 3103 and UBC Appendix{ Section 3106. Provide designated and marked accessible routes between building and public way. Both parking and building doors and interior must be accessible. Two handicapped parking spaces are required in accordance with UBC Appendix 3107 and Table A-31-A. Show all ramps on the site plan. 8. Additional street trees (3 to 4 shade trees) should be provided on College Avenue (see redlined plan). Foundation plantings are desirable along the north wall. Staff believes that Compact Pfitzer Junipers are on the small end of the spectrum to provide adequate screening of parking lots along the two street frontages. 9. What color will the awnings be? Are these awnings illuminated? If so, the illumination shall not be internal. Please describe the proposed lighting, of both the site and buildings. Parking lot fixtures should be on low poles and should have a sharp cut-off with no off -site light spillage. 10. Please describe the texture, color, and materials of the building on the architectural elevations. What does EIFS stand for? Please describe how these materials and colors are compatible with existing buildings at the Arbor Plaza Planned Unit Development? If there are accent colors, what are they? 11. What materials and colors are the pillars? The overhead door should not be painted a stark white. Please specify colors. 12. Please submit a one page Planning Objectives for this specific project. The 1985 letter to Joe Frank is useful background information, but it does not tell us what your objectives are for this project. Statements about land use and design compatibility, traffic impacts, pedestrian connections, etc. would be appropriate. You can also use some of the policies listed :in the 1985 letter, if they apply to this specific proposal.. Because you are amending the preliminary, it is very important for you to address the objectives. 13. There ax.e two new point charts. The ones you have submitted are out of date. I will include copies of the new charts. It would be good to fill out a shopping center point chart as well. You are claiming points for energy conservation, yet there is no explanation. Please refer to the energy conservation worksheet and explain on the site plan, how the project earns the points you claim. This must be documented on the plans. 14. Additional engineering and utility plan related concerns have been sent to your engineer. 15. Prior to filing of the documents, you will be required to enter into a development agreement with the City of Fort Collins. Please fill out the attached form and return with your revisions. If you have questions, please contact Kerrie Ashbeck at 221-6750. 16. Have your engineer check site distances, regarding landscaping or obstructions to site, at the Mason Street entrance. 17. Please contact Basil Hamdan at the City Stormwater Utility (221-6589) to discuss storm drainage issues. There was no erosion control section in the report or plans, there may be water quality issues which need to be addressed, storm sewer connections are awkward, and there were other problems with the drainage submittal. This concludes staff comments at this time. In order to stay on schedule for the May 23, 1994 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due May 6th by 8:30 am (3 sets of plans and one copy of written documentation responding to the above concerns), PMTIs (one PMT of each plan sheet), colored renderings, and 8 sets of prints are due May 16th. Final mylars and other documents are due as soon as possible following the hearing. Please be aware that the development agreement and utility plans must be signed prior to the Planning and Zoning Board Hearing, for all PUDIs. If not, a condition will be placed on the project giving you 30 days to finalise the plans and agreement, after which time, you must submit a request for an extension, to the Planning and Zoning Board. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221- 6750. Sincerely, X�611 4 t/- '- Kirsten Whetstone, AICP Project Planner cc Kerrie Ashbeck, Engineering Department Jim Sell. Design Dave Husted, Drexel Barrell