HomeMy WebLinkAboutENGLISH RANCH SOUTH PUD SECOND - Filed CS-COMMENT SHEETS - 2003-07-31PROJECT
COMMENT SHEET
City of Fort Collins
Current PlanninP
DATE: 25 June, 1997 DEPT: Engineering
PROJECT: English Ranch South P.U.D.
PLANNER: Ted Shepard
ENGINEER: Tim Blandford
All comments must be received by: 6/25/97
No Problems
Problems or Concerns (see below or attached)
GENERAL COMMENTS:
SHEET I OF 28: COVER SHEET
• SEE SHEET FOR COMMENTS.
SHEET 2 OF 28: FINAL PLAT - SHEET I OF 2
• THERE IS A PRIVATE IRRIGATION LATERAL ALONG THE NORTH PROPERTY LINE OF THE
DEVELOPMENT. CONTACT ED DAVIS @ 223- 1 2 1 7. (COMMENT FROM JANET MEISEL
FROM THE PARK PLANNING DEPARTMENT)
• ADD A SIGNATURE BLOCK FOR BOB SHIELDS. SEE SHEET NUMBER 2.
• SEE SHEET NUMBER 2 FOR ADDITIONAL COMMENTS.
COMMENTS CONTINUED ON THE NEXT PAGE Or
Date: '7'*7'97 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: 0 PLAT
SITE
UTILITY
0 LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
DATE: 17 December, 1997 DEPT: Engineering
PROJECT: English Ranch South P.U.D., 2" Filing
ENGINEER: Tim Blandford
All comments must be received by: January 7, 1998
No Problems
Problems or Concerns (see below or attached)
GENERAL COMMENTS:
Sheet 2 of 29: Final Plat - Sheet 1 of 2
Please modify the Attorney's Certificate.
See sheet number 2 of 29 for additional comments and concerns.
Sheet 3 of 29: Final Plat - Sheet 2 of 2
See sheet number 3 of 29 for comments and concerns.
comments continued on the next page or
Date: ► %7 196 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ® PLAT
® SITE
® UTILITY
® LANDSCAPE
comments continued from the previous page...
Sheet 8 of 29: Paddington Plan and Profile
• Please provide stationing in the plan view.
• Reference the details indicated on the plan sheet.
• See sheet number 8 of 29 for additional comments and concerns.
Sheet 9 of 29: Kingsley Drive Plan and Profile
• Please modify the street grades as indicated on the plan sheet.
• Reference the details indicated on the plan sheet.
• See sheet number 9 of 29 for additional comments.
Sheet 10 of 29: Sunstone Drive Plan and Profile
• Reference the details indicated on the plan sheet.
• See sheet number 10 of 29 for additional comments.
Sheet 11 of 29: Sunstone Drive Plan and Profile
• Reference the details indicated on the plan sheet.
• See sheet number 11 of 29 for additional comments.
Sheet 12 of 29: Sunstone Drive Plan and Profile
• Please modify the street grades as indicated on the plan sheet.
• Reference the details indicated on the plan sheet.
• See sheet number 12 of 29 for additional comments.
Sheet 13 of 29: Stonehaven Drive Plan and Profile
• Reference the details indicated on the plan sheet.
• See sheet number 13 of 29 for additional comments.
Sheet 14 of 29: Sunstone Drive Plan and Profile
• Reference the details indicated on the plan sheet.
• See sheet number 14 of 29 for additional comments.
Sheet 15 of 29: Paddington Road Plan and Profile
• Reference the details indicated on the plan sheet.
• See sheet number 15 of 29 for additional comments.
Sheets 26 thru 29: Detail Sheets
• Some of the details are very hard to read. Please modify.
CONCEPTUAL REVIEW STAFF COMMENTS
Citv of Fort Collins
MEETING DATE:
ITEM:
APPLICANT:
LAND USE DATA:
COMMENTS:
January 4, 1999
English Ranch South Patio Homes
Bill Bartran
Bartran & Company
PO Box 277
Timnath, CO 80547
Request for 24 single family detached patio homes on
3.5 acres located west of County Road 9 south of
Horsetooth Road. The property is designated as
Area C on the English Ranch South Overall
Development Plan.
The property is zoned LMN — Low Density Mixed Use Neighborhood. Any
residential development would be processed as an administrative review if
it is submitted under the Land Use Code. However, this project is eligible
to be processed as a PUD under the Land Development Guidance
System based on Ordinance 161, 1996.
2. Light and Power indicated that power is already stubbed to each of the
proposed cul-de-sacs. Normal development charges will apply to this
application.
3. The Utilities Department indicated that all existing utilities are stubbed to
each of the proposed cul-de-sacs. The City's Water Conservation
Standards for Landscaping and Irrigation will apply. Plant Investment
Fees will be due at the issuance of building permits.
4. The Engineering Department stated indicated that a Transportation
Impact Study may be required. Eric Bracke should be contacted to
determine this need. Eric will also determine the need to extend Corbett
Drive from the south into this project. Cul-de-sacs will be required to meet
the current street standards. Street oversizing fees will be applied at a
rate of $1,113.00 per dwelling unit. A development construction permit
1.V1VLV1-UPII1 Y YLAit INIING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
will be required prior to commencing any construction on the site. A
meeting will be required prior to the issuance of this permit. Please
contact your assigned project engineer during the development review
process.
5. The Natural Resources Department asked that you contact Larimer
County to determine the need for a fugitive dust control program which is
required when projects exceed 5 acres in size or will be under
construction longer than 9 months. The use of a single trash hauler is
encouraged. The use of native plants in your landscape plan is also
encouraged.
6. The Stormwater Utility indicated that the site is located within the Fox
Meadows basin where the new development fee is $6,468.00 per acre
which is subject to the runoff coefficient reduction. The site is also located
in inventory grid #130. The detention sizing needs to be checked to see
that the! impervious surface is as assumed in the original sizing; i.e. verify
that athe runoff coefficient used to design the pond is the same or less
than the proposed use. If this project is submitted under the Land Use
Code, water quality needs to be addressed, which could be done in the
detention pond with extended detention. The standard drainage and
erosion control reports and plans are required and they must be prepared
by a professional engineer registered in Colorado. In this case, the
overall report did include this site so it may be more of a report to show
compliance with the overall drainage plan.
7. The Current Planning Department confirmed that the project could be
submitted as a PUD under the Land Development Guidance System.
This project complies with the exceptions provided in Ordinance 161,
1996. A combined preliminary and final PUD would be acceptable.
8. After the Conceptual Review meeting, correspondence was received from
Eric Bracke of the Traffic Operations Department. Eric indicated an
amendment to the traffic study would not be required. In addition, the
extension of Corbett Drive will not be required with this project.
COMMENTS CONTINUED FROM THE PREVIOUS PAGE
SHEET 3 OF 28: FINAL PLAT - SHEET 2 OF 2
• THE FENCING ALONG THE NORTH PROPERTY LINE WILL BE RESTRICTED TO 4' SOLID FENCE
WITH 2' OPEIV FENCE ABOVE FENCE. (COMMENT FROM JANET MEISEL FROM THE PARK
PLANNING DEPARTMENT)
SHEET 4 OF 28: OVERALL UTILITY PLAN
• THERE IS A PRIVATE IRRIGATION LATERAL ALONG THE NORTH PROPERTY LINE OF THE
DEVELOPMENT THAT WILL NEED TO HAVE CLEANOUTS. CONTACT ED DAVIS @ 2 23-1 2 1 7
FOR THE LOCATIONS. (COMMENT FROM JANET MEISEL FROM THE PARK PLANNING
DEPARTMENT)
• NEED TO ADDRESS THE FENCING AND LANDSCAPING ALONG THE NORTH EDGE OF THE
PROPERTY LINE. (COMMENT FROM JANET MEISEL FROM THE PARK PLANNING
DEPARTMENT')
• SEE SHEET NUMBER 4 FOR ADDITIONAL COMMENTS.
SHEET 5 OF 28: OVERALL UTILITY PLAN
• SEE COMMENTS ON SHEET NUMBER 5. (COMMENTS FROM JANET MEISEL FROM THE PARK
PLANNING DEPARTMENT)
SHEET 6 OF 28: GRADING, DRAINAGE, AND EROSION CONTROL PLAN
• SHOW THE IRRIGATION PIPE IN THE CROSS -SECTIONS OF THE PAN. NEED TO MAKE SURE
THAT THERE IS A MINIMUM OF 1 8° OF COVER. (COMMENTS FROM JANET MEISEL FROM THE
PARK PLANNING DEPARTMENT)
• SEE SHEET NUMBER 6 FOR ADDITIONAL COMMENTS.
SHEET 7 OF 28: (.TRADING, DRAINAGE, AND EROSION CONTROL PLAN
• PROVIDE A LEGEND WITH SYMBOLS AND DESCRIPTIONS
• IDENTIFY THE: PHASE LINE MORE CLEARLY.
• ADD A GRAPHIC SCALE.
SHEET 8 OF 28: 13ADDINGToN ROAD PLAN AND PROFILE
• NEED TO PROVIDE ELEVATIONS AT THE INTERSECTIONS WHERE SHOWN, PER THE CURRENT
STREET STANDARDS.
• SHOW THE TRANSITION DISTANCES TO REMOVE THE CROWNS IN THE ROADS, PER THE
CURRENT STREET STANDARDS.
• EXTEND THE EXISTING GROUND PROFILE FOR A MINIMUM OF 1 50' BEYOND THE END OF
THE CONSTRUCTION, PER THE CURRENT STREET STANDARDS.
• SEE SHEET NUMBER 8 FOR ADDITIONAL COMMENTS.
COMMENTS CONTINUED ON THE NEXT PAGE 9W
COMMENTS CONTINUED FROM THE PREVIOUS PAGE
SHEET 9 OF 28: KINGSLEY DRIVE PLAN AND PROFILE
• SEE COMMENTS ON SHEET NUMBER 9.
SHEET 10 OF 28: SUNSTONE DRIVE PLAN AND PROFILE
• SEE COMMENTS ON SHEET NUMBER 10.
SHEET I I OF 28: SUNSTONE DRIVE PLAN AND PROFILE
• SEE COMMENTS ON SHEET NUMBER I I .
• RECHECK THE SLOPE OF THE STREET BETWEEN STATIONS 2+24.84 AND 1 +24.84.
SHEET 1 2 OF 28: SUNSTONE DRIVE PLAN AND PROFILE
• SEE COMMENTS ON SHEET NUMBER 1 2.
SHEET 1 3 OF 28: STONEHAVEN DRIVE PLAN AND PROFILE
• INCLUDE STATION EQUATIONS WHERE SHOWN, BECAUSE THE STATIONING IS CHANGES.
• YOUR MISSING A COUPLE OF PC LABELS IN THE PROFILES.
• SEE SHEET NUMBER 1 3 FOR ADDITIONAL COMMENTS.
SHEET 1 4 OF 28: SUNSTONE DRIVE PLAN AND PROFILE
• INCLUDE STATION EQUATIONS WHERE SHOWN, BECAUSE THE STATIONING IS CHANGES.
• SEE SHEET NUMBER 1 3 FOR ADDITIONAL COMMENTS.
SHEET 1 5 OF 28: PADDINGTON ROAD PLAN AND PROFILE
• INCLUDE STATION EQUATIONS WHERE SHOWN, BECAUSE THE STATIONING IS CHANGES.
• SEE SHEET NUMBER 1 3 FOR ADDITIONAL COMMENTS.
SHEETS 1 6 THRU 214
• MODIFY THE 'TITLE OF THE SHEETS.
SHEET 25 OF 28: PHASE I IRRIGATION PIPE AND DITCH PLAN AND PROFILE
• ADD A CLEANOUT WHERE INDICATED. (COMMENT FROM JANET MEISEL FROM THE PARK
PLANNING DEPARTMENT)
• MODIFY THE SIGNATURE BLOCK FOR THE IRRIGATION LINE APPROVAL. (COMMENT FROM
JANET MEISE',L FROM THE PARK PLANNING DEPARTMENT)
SHEET 26 THRU 28: DETAILS
• SOME OF THE DETAILS ARE HARD TO READ.
• PROVIDE THE: APPROPRIATE DETAILS AS SHOWN ON THESE SHEETS.
PROJECT
COMMENT SHEET
City of Fort Collins
DATE: 7 July, 1997 DEPT: Engineering
PROJECT: English Ranch South P.U.D., Second Filing
ENGINEER: Tim Blandford
All comments must be received by: August 20, 1997
No Problems
Problems or Concerns (see below or attached)
GENERAL COMMENTS:
SHEET I OF 28: COVER SHEET
• MODIFY THE GENERAL NOTES AS INDICATED ON THE PLANS.
• SEE SHEET No. I OF 28 FOR ADDITIONAL COMMENTS.
SHEET 2 OF 28: FINAL PLAT - SHEET I OF 2
• YOU WILL NEED TO SHOW OFFSITE EASEMENTS FOR THE SANITARY SEWER CONSTRUCTION,
ETC. OUTSIDE: OF THE PLATTED AREAS.
• SEE SHEET NO. I OF 2 FOR ADDITIONAL COMMENTS.
COMMENTS CONTINUED ON THE NEXT PAGE 9W
Date: Signature: —
PLEASE SEND COPIES OF MARKED REVISIONS: PLAT
® SITE
® UTILITY
® LANDSCAPE
I
COMMENTS CONTINUED FROM THE PREVIOUS PAGE
SHEET 4 OF 28: OVERALL UTILITY PLAN
• SHOW OFFSITE UTILITY EASEMENTS WHERE INDICATED.
SHEET 6 OF 28: GRADING, DRAINAGE, AND EROSION CONTROL PLAN
• YOU ARE INDICATING THAT THERE WILL BE GRADING OUTSIDE OF THE PLATTED AREA. THIS
WILL REQUIRE, A CONSTRUCTION EASEMENT.
SHEET 8 OF 28: P,ADDINGTON ROAD PLAN AND PROFILE
• NEED TO SHOW THE PROPOSED FLOWLINE GRADE LINES THROUGH THE INTERSECTION.
SHOW HOW IT WILL TIE IN TO THE EXISTING GROUND AT THE CONSTRUCTION LIMIT.
• SHOW ALL CURB RETURN PROFILES.
• RECHECK THE: SLOPE OF THE CONCRETE PAN INDICATED.
• PLEASE SHOW THE TAPER TRIANGLE AT THE APPROPRIATE LOCATIONS LIKE WAS PROVIDED
ON SHEET NUMBERS 1 2, 1 4, AND 1 5.
• RECHECK THE: ELEVATIONS AT THE INTERSECTION OF PADDINGTON ROAD AND EDMONDS
ROAD.
• SEE SHEET NUMBER 8 FOR ADDITIONAL COMMENTS.
SHEET 9 OF 28: KINGSLEY DRIVE PLAN AND PROFILE
• PLEASE SHOW THE TAPER TRIANGLE AT THE APPROPRIATE LOCATIONS LIKE WAS PROVIDED
ON SHEET NUMBERS 1 2, 1 4, AND 1 5.
• NEED TO SHOW THE PROPOSED FLOWLINE GRADE LINES THROUGH THE INTERSECTION.
• YOU WILL NEED TO PROVIDE A VERTICAL CURVE OR MATCH THE EXISTING SLOPE. IT
EXCEEDS THE MAXIMUM ALLOWABLE GRADE CHANGE OF 0.4%. PLEASE MODIFY.
• SEE SHEET NUMBER 9 FOR ADDITIONAL COMMENTS.
SHEET 10 OF 28: SUNSTONE DRIVE PLAN AND PROFILE
• SHOW EXISTING AND PROPOSED GROUND LINES FOR A MIN. OF 1 50'.
• NEED TO SHOW THE PROPOSED FLOWLINE GRADE LINES THROUGH THE INTERSECTION.
• SEE SHEET NUMBER 1 0 FOR ADDITIONAL COMMENTS.
SHEET I I OF 28: SUNSTONE DRIVE PLAN AND PROFILE
• SHOW EXISTING AND PROPOSED GROUND LINES FOR A MIN. OF 1 50'.
• NEED TO SHOW THE PROPOSED FLOWLINE GRADE LINES THROUGH THE INTERSECTION.
• SEE SHEET NUMBER I I FOR ADD!-TIONAL COMMENTS.
SHEET 1 2 OF 28: SUNSTONE DRIVE PLAN AND PROFILE
• SHOW EXISTING AND PROPOSED GROUND LINES FOR A MIN. OF I SOS.
COMMENTS CONTINUED ON THE NEXT PACE OW
COMMENTS CONTINUED FROM THE PREVIOUS PAGE
• NEED TO SHOW THE PROPOSED FLOWLINE GRADE LINES THROUGH THE INTERSECTION.
• SEE SHEET NUMBER 1 2 FOR ADDITIONAL COMMENTS.
SHEET 1 3 OF 28: STONEHAVEN DRIVE PLAN AND PROFILE
• INCLUDE STATION EQUATIONS WHERE SHOWN, BECAUSE THE STATIONING IS CHANGES.
• YOUR MISSING A COUPLE OF PC LABELS IN THE PROFILES.
• SEE SHEET NUMBER 1 3 FOR ADDITIONAL COMMENTS.
SHEET 1 4 OF 28: SUNSTONE DRIVE PLAN AND PROFILE
• SEE SHEET NUMBER 1 4 FOR ADDITIONAL COMMENTS.
SHEET 1 5 OF 28: PADDINGTON ROAD PLAN AND PROFILE
• SEE SHEET NUMBER 1 5 FOR ADDITIONAL COMMENTS.
SHEETS 1 6 THRU 2.3 OF 28: SEWER, WATER, AND STORM SEWER PLAN AND PROFILES
• SHOW THE OFFSITE EASEMENTS.
• SEE SHEET NUMBERS 16 THRU 23 FOR ADDITIONAL COMMENTS.
SHEET 27 THRU 28: DETAIL SHEET
• SOME OF THE: DETAILS ARE STILL HARD TO READ.
• PROVIDE A DETAIL OF A DETACHED SIDEWALK ATTACHING TO AN ATTACHED SIDEWALK.
NOTE: PLEASE RECHECK THE CORNER LOT ELEVATIONS ON ALL OF THE PLAN AND
PROFILE SHEETS WITH RESPECT TO THE FLOWLINE PROFILES. MAKE SURE THAT
THEY MEETTHE CITY'S REQUIREMENTS.
PROJECT
COMMENT SHEET
City of Fort Collins
DATE: 31 October, 1997 DEPT: Engineering
PROJECT: English Ranch South, P.U.D., 2nd Filing
ENGINEER: Tim Blandford
All comments, must be received by: November 19, 1997
®No Problems
Problems or Concerns (see below or attached)
GENERAL COMMENTS:
Sheet 1 of 28: Cover Sheet
Modify the General Notes as indicated on the plans.
Modify the title as indicated on the plans.
Sheet 2 of 28: Final Plat - Sheet 1 of 2
The offsite easements need to be dedicated per separate document.
Bob Shields will not be signing the plat, therefore the signature block, for him,
needs to be removed. You will however need to provide a signature block for
Bob Shields' attorney, Art March.
comments continued on the next page
Date: I l-19-97 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: PLAT
® SITE
® UTILITY
LANDSCAPE
comments continued from the previous page...
• You have the option to change the attorney's certificate to what is shown on the
attached sheet. From now on though, the new certificate will need to be on all
plats, ROW dedications, easement dedications, etc. per the City Attorney.
Sheet 3 of 28: Final Plat - Sheet 2 of 2
• The description of the subdivision does not match the legal description. Please
modify.
• US West currently has an easement along the westerly property line of this
subdivision that is not shown. They do have some concerns regarding the 20
foot utility, drainage, and irrigation ditch easement that is currently being shown.
Please contact Susan Peterson at US West so this can be resolved.
• Please recheck your survey data along the west line of the northeast 1/4 of
Section 32-7-68. It doesn't match with what is shown on the Sunstone Village
PUD Plat.
• See Sheet Number 2 of 2 for additional comments.
Sheet 8 of 28: Paddington Road Plan and Profile
• Show proposed curb return information, i.e. radius, arc length, tangent length,
angle, etc. on this sheet for all curb returns.
• See sheet number 8 for additional comments.
Sheet 9 of 28: Kingsley Drive Plan and Profile
• See sheet number 9 for additional comments.
Sheet 10 of 28: Sunstone Drive Plan and Profile
• Show proposed curb return information, i.e. radius, arc length, tangent length,
angle, etc. on this sheet for all curb returns.
• Provide and reference a dimensioned detail of the intersection of the 6 foot walk
and the mid -block ramp.
• You are missing a couple of curb return profiles. Please add.
• See sheet number 10 for additional comments.
Sheet 11 of 28: Sunstone Drive Plan and Profile
• Show proposed curb return information, i.e. radius, arc length, tangent length,
angle, etc. on this sheet for all curb returns.
comments continued on the next page ua,
comments continued from the previous page...
• Provide and reference a dimensioned detail of the intersection of the 6 foot walk
and the mid -block ramp.
• You are missing a couple of curb return profiles. Please add.
• See sheet number 11 for additional comments.
Sheet 12 of 28: Sunstone Drive Plan and Profile
• Show proposed curb return information, i.e. radius, arc length, tangent length,
angle, etc. on this sheet for all curb returns.
• You are missing a couple of curb return profiles. Please add.
• The segment of the proposed portion of Sunstone Drive where it ties into the
existing portion is not acceptable. Please modify. See the options stated on the
plan sheet. Please note that these are just options and not requests. If you can
come up with something better, please feel free to use it.
• See sheet number 12 for additional comments.
Sheet 13 of 28: Stonehaven Drive Plan and Profile
• Show proposed curb return information, i.e. radius, arc length, tangent length,
angle, etc. on this sheet for all curb returns.
• Provide and reference a dimensioned detail of the intersection of the 6 foot walk
and the mid -block ramp.
• You are missing a couple of curb return profiles. Please add.
• See Sheet Number 13 for additional comments and concerns.
Sheet 14 of 28: ;Sunstone Drive Plan and Profile
• Show proposed curb return information, i.e. radius, arc length, tangent length,
angle, etc. on this sheet for all curb returns.
• Provide and reference a dimensioned detail of the intersection of the 6 foot walk
and the mid -block ramp.
• See Sheet Number 14 for additional comments.
Sheet 15 of 28: Paddington Road Plan and Profile
• Show proposed curb return information, i.e. radius, arc length, tangent length,
angle, etc. on this sheet for all curb returns.
• You are missing a couple of curb return profiles. Please add.
• See sheet number 15 for additional comments.