FIRST NATIONAL TOWER P.O. BOX: 7 FORT COLLINS, C OLORADO 80522
PHONE/303/482 2240 r LA/b
October 15, 1979
Mr. Mauri Rupel
CITY OF FORT COLLINS
Engineering Department
Fort Collins, CO 80521
Dear Mauri,
It has been brought to my attention that there is a problem in the existing
locations of a sanitary sewer and a storm sewer in the Southwest corner of
the cul-de-sac on Erin Court.
Since Mr. Betz and I were the developers of said area, this letter is to
quarantee the Engineering Department and the City of Fort Collins that we
will have these sewer lines relocated to the easement set aside for said
sewer lines within 60 days from the date of this letter.
i):"Y, c
&"�
Dan Bailey
DJB:cr
cc: Building Inspection Department
City of Fort Collins
113
REALTOR
James :IEI. Stevva.,, c and Associates, Inc.
Consulting Engineers and Surveyors
June 13, 1980
ECEINJ ED
JUN 13 1980
Ms. Lucia Liley
City Attorney
P.O. Box 580
Fort Collins, CO 80522
Dear Lucia:
This letter will confirm our conversation of his date relative to the
reconstruction of aaa saannitary sewer line in e easement between lots 6
and 7 of the ep at of Edora Acres, Second Filing, Fort Collins, Colorado.
We have made arrangements with Gurwell Construction Company to reconstruct
this sewer for an estimated cost of $6,000.00. He anticipates completion
of the work to the satisfaction of the City by 15 August 1980. As a
guarantee that the work will be accomplished, we have given you our check
in the amount of $9,000.00. It is our understanding that if the work
is not satisfactorily completed by 1 September 1980, or at a mutually
agreed upon later date, you may cash this check and use whatever portions
of the proceeds as is necessary to complete the work, the balance to be
refunded to us. It is also our understanding that at such time as
Gurwell satisfactorily completes his work, and'we submit evidence that
he has been paid in full, you will return our $9,000.00 guarantee
check.
In consideration of the above guarantee, it is further our understand-
ing that the City will not withhold C.O.s in this subdivision because
of the sewer problem.
Please call us if the above conditions are not satisfactory.
Very truly yours,
JAMES H. STEWART AND ASSOCIATES, INC.
lames H. Stewart, P.E. & L.S.
President
JHS/cjf
OFFICE-214 NORTH HOWES • P.O. BOX 429 • FORT COLLINS. COLORADO 80522 • TELEPHONE 30314S2-93,11
James H. ,,ewart and Associates, In
Consulting Engineers and Surveyors
September 5, 1980
Ms. Lucia Liley
City Attorney
P.O. Box 580
Fort Collins, CO 80522
Dear Lucia:
Re: Guarantee check in connection with sewer work on Erin Court
As per our phone conversation of today, we find it necessary to request
that the City continue to hold our guarantee check in the amount of
$9000 for an additional 30 days.
The reason for the delay is the difficulty we are encountering in
obtaining a necessary easement from one of the property owners. Both
ourselves and the Contractor are ready to proceed with the work, but we
are prevented from doing so by the unreasonabiness of the property
owner regarding the easement. We are continuing to dilligently pursue
a resolution to this problem. Thank you for your cooperation.
Very truly yours,
JAMES H. STEWART AND ASSOCIATES, INC.
1�
;James H. Stewart, P.E. & L.S.
1]President
JHS/c j f
OFFICE-214 NORTH HOWES • P.O. BOX 429 • FORT COLLINS. COLORADO 80522 • TELEPHONE 303A82-9331
CITY OF FORT COLLINS
STORM WATER U FIU FY
November 29, 1984
Mr. Bo Brown
Conine Company
1918 Lemay Avenue
Fort Collins, Colorado 80525
Re: Erin Court R/M Conversion
Dear Bo,
As per our phone conversation last week, you do not have to
provide on -site detention or off -site improvements for the
above referenced project. Site constraints make on -site
detention impractical and the existing storm sewer and inlet
on Erin Court are in good condition.
Sincerely,
�'� U�Y'tt�iY�
orb Ga mahn
i it tira)inage
eer I
rm
cc: Bonnie Tripoli
�y
04
l
• �, '' • .... .+re J.. • � :�� .L r ,.ice � —•-—tv.��n..w
I' 1'� Srl1 �%�/:1 (F,1 � l i li I ('( 'i(1�1 � ai�n,•rn Pr„�, _ ., ' 1 r ,... �.�_�n .. ,. _ _ _
el ado Rastas Ir. .
CONSULTING ENGINEERS and LAND SURVEYORS
G. Pete Delgado, L.S.. Patrick M. Mestas, P.E.
2217 AIRWAY AVE., FORT COLLINS, COLORADO 80524 TELEPHONE 484- __!1-911-�.;;� ;
City 0-:' Fo °t Collins
PZannin:T And Zonning
Dear Ken
Please act upon our request to have the following
items acted upon through the variance process.
(1) 'He are requestin, a variance f�--om the drainage and
retention becua3a of the existinS and the ability
co h ire onl�r one more house.
(2 ) :Ne are requesting a variance from the street improvements
cue to the fau;t :;la; e, .,i��re his been n rocent Improvementdistrict formed to improve the street adjacent to this
property.
Conine Company
1918 S. Lemay Ave.
Fort Collins, CO 80525
10/31/84
Re: Erin Court Triplex
City of Fort Collins
300 LaPorte Ave.
Fort Collins, CO 80521
Attn: Planning Dept.
Dear Sirs:
We would like to request a variance from on site detention for the
building lot of the Erin Court triplex. The site slopes steeply from
the north to the south on to Erin Court Drive. A very natural drainage
exists on site at present. The addition of the proposed triplex will
not seem to disrupt this drainage pattern.
Sincerely,
li--
Pete LeGeros
Date: 10/31/84
To: City of Fort Collins
Planning Dept.
From: Peter LeGeros
Conine Company
M 8 S. Lemay Ave.
Fort Collins, CO 80525
221-0555
Re: Erin Court Triplex
Statement of Planning Objectives
The following is a statement of the relationship of our proposed triplex
to the criteria set forth in your guidelines:
1) Land Use:
The existing lot is zoned RM and is located off of the Erin
Court cul-de-sac. Triplexes and four-plexes constitute the
majority of dwelling units on the Erin Ct. cul-de-sac. We
feel that a thoughtfully developed triplex will not seem out
of line with the current state of arts of land use on Erin Ct.
2) Landscaping:
The landscaping in this area consists basically of pavement
and automobiles. By proposing parking within the building
footprint, we are allowing potentially more curb appeal and
building lot open space.
3) Traffic Generation:
The existing off street parking for Erin Ct. seems adequate
for the area. He are proposing (1) double car garaqe for each
(2.) bedroom dwelling. We feel this will be adequate for off
street parking, at it does meet the city zoning requirements
for off street parking.
4) Circulation:
The flow of one way traffic through the proposed parking
drive, eliminates congestion and expediates on and off site
egress. We feel this relationship is the strongest available
for the tenants.
In conclusion, we feel the triplex as developed with parking within
the footprint will not add any major problems to the Erin Ct. area, but
can in fact, enhance the landscaping potential and possibly stimulate
solutions such as this for other builders and developers.