HomeMy WebLinkAboutEASTGATE - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31James H. Stewart and Associates, Inc.
Consulting Engineers and Surveyors
September 8, 1978
alp? Tf
Mr. Maurice Rupel
City Engineer's Office
300 LaPorte Avenue
Fort Collins, CO 80521
Dear Mauri:
I have :inspected the curb and pavement along the west side of
Montgomery Street, and my feeling is that it should remain as it is.
Although our plan shows a curve in the curb, while the existing
curb is straight, I believe the existing curb will not cause
problems. However, there will be problems with drives and yards
should you decide to remove the curb. Mr. Dan Bailey informs
me that he is ready to proceed with base and pavement, and I
request that he be allowed to continue his work.
If you have any questions, please call.
Sincerely yours,
JAMES H. STEWART AND ASSOCIATES, INC.
c
Phillip I. Robinson, P.E. & L.S.
Senior Vice President
PIR/cif
OFFICF_ 21 4 NOR III HOWES 0 P.O. BOX 429 0 FORT COLLINS, COLORAllO 80522 0 TFLEPHONF AREA 303/482-9331
3
CITY 01 FORT COI.EINS P.O. GOX DSO, 10RT COEEINS, COMADO S0522
ENGINEERING DIVISION
December 12, 1979
Mr. Dan Bailey
Hansen Realty, Inc.
1st National Tower Building
Ft. Collins, Colorado
TO 11HOM IT 1AY CONCERN:
Our office has contacted your's on several occasions concerning the
raising of manholes and valve boxes in the Eastgate P.U.D.
subdivision. It is a very real health and safety hazard to the
general public and I must insist that this work be done immediately.
Your failure to comply will result in the City not releasing any
certificates of occupancy for the buildings now under construction
and refusal of any other building permits that your builders might
request.
Your cooperation in this matter will be greatly appreciated.
Dave Stringer
Chief Construction Inspector
1I1 (303) 4S 1 1220
EXT. 728