Loading...
HomeMy WebLinkAboutEASTBOROUGH - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31.. �'.`1 � �. -..... �1 � r i �. iA',M A k y • 'Z'�`-^"'vr� Vic.,-�+� �, � ./ a / f r Post Office Box 580 Fort Collins, Colorado 80521 Telephone 303 484.4220 September 27, 1977 Veterans Administration To Whom It May Concern: It is standard policy for the City of Fort Collins to accept for perpetual maintenance those public right-of-way constructions which have been approved by the City and which have passed all required guarantee periods. This includes the water mains, sanitary sewer mains, storm sewer mains, street pavements, street lights, and street signs in the Eastborough Subdivision W41• Sincerely, Donald M. Parso City Engineer TIME CENTER OF THE WORLD WYATT, WILLIAMS, WILLIAMSON AND McCABE ATTORNEYS AT LAW BILL WYATT 222 WEST MAGNOLIA STREET DAVE WILLIAMS BOB WILLIAMSON FORT COLLINS, COLORADO 8OS21 HARRY L. McCABE February 28, 1980 Mr. Maurie Ruppel City Engineering Office City of Fort Collins 300 LaPorte Avenue Fort Col Tins, Colorado 80521 Dear Maurie: TELEPHONE AREA CODE 303 484-1112 This will confirm the discussion we had at our meeting on February 26, 1980. I am pleased to advise that the eight foot wide concrete drainage pan and four foot wide concrete trickle channel for the detention pond in Eastborough Subdivision have been installed. Flatiron Paving will accomplish the remaining earth work on the detention pond as soon as weather conditions allow. I would request that the amount being held by the City for the drainage pan and trickle pan, being $3,066.00, be authorized for release so the contractor can be paid. It is my understanding that the current progress on completion of the detention facility along with the money still held by the City to ensure the remaining work ensure the continued issuance of building and occupancy permits in the subdivision. If you would like verification from Flatiron concerning the performance of the remaining earth work, I would be happy to provide such. Upon Flatiron's completion of the earth work, I will have the small amount of required sidewalk installed and have the detention area seeded. Thank you for your courtesies and cooperation in this matter. Very truly yours, HARRY 'L. I',cCABE HLMcC:ih [. �.,:.,_.�•�� 3 Ph 3048-4220 Ext. 728 CIIY 0If F(�RI COEI_IN`S P.O. Box 580 Fort Collins Colorado 8�522 � _ 4_ — ENGINEERING DIVISION June 4, 1982 Mr. Harry McCabe 1508 Buckeye Fort Collins, Colorado 80524 Dear Mr. McCabe: The following is in regard to the detention facility in the Eastborough development. The City has received numerous complaints from citizens in the neighborhood about the state the pond is in. These neighbors are complaining about the weeds, the stagnant water, and mosquitoes in and around the pond. Several of these people live next to the pond itself. Late last fall, Dave Stringer and myself met with you and discussed the pond's completion, its repair, and the issuance of a building permit for lot 135 at 2818 Fauborough Court. At that time you assured us you would have the pond completed in the near future. Previous to that time, in correspondence dated February 28, 1980 to Mr. Maurice Rupel, you again stated the pond would be completed by Flatiron Paving Company as soon as weather permitting. To date, no progress toward the completion of the pond has been made. As you aria aware, the City has acted in good faith on this matter. This is reflected by the facts that: (1) According to the subdivision agreement, the detention pond should have been completed by July 1, 1978; (2) The City has issued 119 building permits and 118 certificates of occupancy for the subdivision; and (3) Last year the City cleaned debris from the concrete trickle pan. Effective immediately, no additional or new building permits or certifi- cates of occupancy will be issued until the matter is resolved. Also, in accordance with Chapter 79, "Nuisances", of the City Code, if in thirty (30) days after receipt of this correspondence no progress is made in C ti,, Mr. Harry McCabe June 4, 1982 Page Two correcting the matter, the City may proceed in correcting the matter and bill you upon completion. If you have any questions or comments on the above, please feel free to contact me. Sincerely, Robert W. Smith Assistant City Engineer - Storm Drainage cc: Maurice Rupel W. Paul Eckman Building Inspection David Stringer CITY OF FORT COLLINS MEMORANDUM DATE: August 15, 1983 TO: Gwyn Strand, Utility Billing FROM: Bob Smith, Storm Drainage. RE: Special Weed Assessment - Tract "A" Eastborough Subdivision In July of 1977 the Eastborough Subdivision was approved for development. A part of the approval process was the stipulation that a detention pond be constructed in Tract A of that subdivision. Inadvertently when the plat was recorded for the subdivision Tract A was not dedicated to the City. In 1982 thru the weed or sanitation program, the weeds were mowed by a private contractor. This mowing resulted in a special weed assessment on the parcel in the amount of approximately $426.00. Since the tract should have been recorded as public property, with this correspondence I am requesting the special weed assessment be removed from this parcel. If you have any questions on the above, please do not hesitate to call. cc: W. Paul Eckman Larry Schneider Charles Woodward CITY OF FORT COLLINS yIDZ G ' ►19 lu DATE: September 16, 1982 'TO: ,'Dave Stringer, Chief Construction Inspector Felix Lee, Chief Building Official FROM: Bob Smith, Assistant City Engineer - Storm Drainage RE: Building permit hold - Eastborough Subdivision Please be advised Harry McCabe has met his financial obligation to ccoplete t'= Eastborough detention facility. Having met this obligation, any additional building permits or certificates of occupancy can be issued in the subdivision. All other obligations normally associated with the building permit process still apply. Attachment i t+� f ai :�, ici 'ar-';f �� 'S,t' x'F�- 'M a r*.}` r ram_, � � p'"�w,.ir✓'� n 7,'',"„a'�e'.�,�'ena".r LNGINLLRING DIVISION November 10, 1982 U.S. Department of Housing Urban Department Regional Office VIII Executive Tower 1405 Curtis Street Denver, Colorado Re: Public improvement acceptance and maintenance TO WHOM IT MAY CONCERN: The City has accepted and will maintain the water, sewer, storm sewer, streets, curbs, gutters, sidewalks and storm water detention facilities installed in the Eastborough Subdivision. Sincerely, David Stringer Chief Construction Inspector f�S r - •a. I+...o.+..� v i •^iAl " T t : r ,� '� t 4 JV - ,ice , �.�, 0* 3' �n�''' r a s- J►;`Yi'i-.. Lh'y`. 't". - �'✓ ri li.-�',c;'ri ..i�l'� t n�J.tK .'> Yi;:.r ♦<`- .j: +f.. .r ;'r{!/. .r -,: ,i .�^ f f�v+ry ( 11) 01 1O1?1 (()111IV) P.U. bov 580, Fort Collins, Colowdo S0522 PW303)4n4422U Ext. 72$ STORM WATER UTILITY May 24, 1983 Mr. Charles Woodward Larimer County Treasurer Larimer County Fort Collins, Colorado Re: Eastborough - Tract A Mr. Woodward, Please be advised Tract A of the Eastborough Subdivision is reserved on the utility drawings for said subdivision as a detention facility. Attached is a copy of the utility drawings the City keeps in its permanent files. The facility is reserved for the control of storm runoff from the development. and was constructed by the developer of the subdivision. Because of its purpose, the City would prohibit any redevelopment or encroachment in this facility. If you have any questions on the above, please feel free to contact me. Sincerely, Robert W. Smith Assistant City Engineer - Storm Drainage Attachment cc: JRon Mills Peter Ruggiero Paul Eckman Planning Co - 1) doh VA . swC.� s Py CITY OF FORT COLLINS MEMORANDUM DATE: May 26, 1983 TO: Ron Mills, Right -of -Way Agent FROM: Dave Stringer, Chief Construction Inspector RE: Eastborough Subdivision Per your request of May 23, 1983 I have compiled the following list of vacant lots in the Eastborough Subdivision: Eindborough Drive Lot Number 2900 143 2901 65 2906 144 2913 64 Fauborough Court Lot Number 2901 75 2906 67 2913 73 2918 69 2919 72 2924 70 2801 131 2806 133 2807 130 2830 137 Oxborough Lane Lot Number 1119 87 1213 75 1218 137 1236 140 1300 142 1301 143 Middlesborough Court Lot Number 2901 87 2907 86 2931 82 2807 119 2812 123 -2- Eastborough Drive Lot Number 2812 112 2813 107 2818 113 282S 105 2831 104 Stratborough Lane Lot Number 1149 6 Centennial Road Lot Number 1212 44 1207 ? Part of lot 34 Rockborough Court 302S Lot Number Lot 44 Please note that the City has a 12-inch storm drainage line from Lemay Avenue to Eastborough Drive. I could not find any correspondence in our records which dedicates these areas as an easement. The area in question is parallel with the common property line of lots 18 and 19. THE LARIMER COUNTY TREASURER P.O. BOX 1250 FORT COLLINS, COLORADO 80522 CHARLES L. WOODWARD (303) 221.7020 Treasurer July 28, 1983 City of Fort Collins, Colorado 300 LaPorte Avenue ATTN: Mr. W. Paul Eckman, Assistant City Attorney Dear Mr. Eckman: Concerning Tract -A, Eastborough Sub, and agreement reached at the meet- ing with Larimer County and Fort Collins City government officials, the following _information is presented for your review and comment. The Larimer County Assessor has started abatement process for the years 1978 through 19.92, inclusive. However; the Larimer County Treasurer cannot concur because of the need to satisfy tax sale certificate holders that are involved. in the normal process of redemption, the tax payer must reimburse the money that has been paid by the certificate holder, along with any accrued interest and fees. These certificate holders must have their investment returned to them before the abatement process can be finalized. The total amount of interest and fees due to the certificate holders is $298.13. This total has been arrived at by compiling the following figures: 1978 Interest - $55.31 Advertising Fees - $26.91 1979 Interest - 39.89 Title Search - 35.00 1980 Interest - 69.19 Certified Letters 24.80 1981 Interest - 37.03 Recording Fees - 6.00 Treasurer's Fees - 4.00 $201.42 $96.71 + 96.71 TOTAL $298.13 In the normal process, the City of Fort Collins should pay the interest and fees that are due to the certificate holders. When this situation has been resolved, abatement procedures should be completed. I am at your disposal for any discussion concerning this matter. Sincerely, Au u 14CHARLES L. WOODWARD e"'ITV •-.�.nr� Larimer County Treasurer CC: Mr. Richard Green - Mr. Ron Wood - Mr. Robert W. Smith Post office sox 580 Fort Collins, Colorado 80521 November 17, 1977 Guy McCabe Dear Guy, On the 16th of November, 1977, we attempted for the second time to make a final inspection of the sanitary sewer mains in your Eastborough Subdivision. It was immediately apparent that the infiltration of goundwater into the lower portions of this sewer was far above the acceptable limits as stated in our Sanitary Sewer specifications. We are currently using our weir to determine the amounts of infiltration in these sections for our records, but we will be unable to make further inspec- tions of the main or issue acceptance notification to the Water and Sewer Department until this leakage has been stopped or lowered within acceptable limits. Sincerely, �"� f l /� Robert T. Zakely Chief Construction Inspector RTZ:cs FLATIRON PAVING COMPANY P.O. BOX 859 • FORT COLLINS, COLORADO 80521 • PHONE: (303) 484-3257 January 10, 1978 Mr. Robert Zackl.ey Engineering Department City of Fort Collins Port Collins, Colorado 80521 re: Eastborough Drive, Fauborough. Ct., and Middlesborough Ct. Mr. Zackley: After on site examination and consultation with the project engineer, we certify that all Pork necessr r to brin ; any one of the above referenced cutdec-a—s to final street grade with +' Jl road base installed can bo accomplished i_ one Workin? day. None of the c.,ld.esa^s require extensive or time consuming gradiri� operations. We therefore a7ree to conduct all final grading and street base work on -th ,se culdesa-s on s da4l-7 schedule that will. guarantee that these cu.ldesacs will n,�t, ii:';der ,anv circumstance, be Left without adequate base over night. Sincerely, r James H. Short Flatiron Pa�,ing CompaniT psw/jhs cc: ?carry HcCabc, file Post Office Box 580 Fort Collins, Colorado 80521 Telephone 303 484-4220 April 19, 1978 Flatiron Paving Co. PO Box 229 Boulder, Colorado 80306 Dear Sirs: A recent inspection of the sanitary sewer main in the East - borough Subdivision indicates a major infiltration problem in the area of the intersection of Eindborough and Oxborough. Specifically the pipeline from Manhole No. 21 into Manhole No. 26 is flowing almost half full of groundwater. This main was installed by your company and currently is within the one-year guarantee period. Please take steps to make any and all repairs necessary to the Eastborough Subdivision sewer mains at your earliest convenience. If you will contact this office our inspectors will help you in whatever way possible. Any delay in making necessary repairs could jeopardize the issuance of build- ing permits in the area. Sincerely, Bob Zakely Chief Construction Inspector BZ:cs cc: Harry McCabe September 26, 1978 Harry McCabe 222 W. Magnolia Fort Collins, CO 80521 Dear Harry: Although work has been progressing on the remaining public improvements for your Eastborough Subdivision, the detention system is not yet completed and manholes and valve boxes have not been raised to grade through the pavement. Because these two items are of vital importance and because you were notified that they needed to be completed some weeks ago, I do not feel the City can issue any further certificates of occupancy in the area until the work is finished. RTZ:nkk cc: Steve Gotto D & B Building Corp. Craig F. Ferris C.F. & 1'. Corp. Sincerely, Robert T. Zakely Chief, Construction In for lnnoi o_._.a FLATIRON PAVING COMPANY . FORT COLLINS, COLORADO 80521 • PHONE: (303) 4 8 4 - 3 2 5 7 1'. 0. BOX 504 January 11, 1S>79 Nr. Roy Bingman City Engineer P.O. Box 580 Fort Collins, Colorado 80522 Gentlemen: Please accept this letter as verification of the fact Flatiron Paving Company has a firm contract with 4d.P:. Venture for the construction of drainage structure. This will drain �emay Ave. into the Eastborouh Subdivision detention pond. Construction will proceed on this contract in early Spring 1979. We will bep;in as soon as the majority of the frost goes out of the ground. If you have questions concerning this contract, please, don't hesitate to call. Flatiron Faving Company of Greeley James H. Short Vice President JHS/dab cc: Harry N:cCabe File M CONCR�INC. VP i_INDFN STREET, FORT COLLINS_ COLOPA[DO 80521 TELEPHONE: (303) 482-8542 January 26, 1979 Engineering Department City of Ft. Collins P.O. Box 580 Ft. Collins, CO 80522 Attn: Roy Bingman Dear Mr. Bingman, Kiefer Concrete has a contract with Eastborough Subdivision and Harry McCabe to build a curb drain and trickle pan, which starts on Fauborough Ct. and continues through the detention pond to the outlet. The work will be performed as soon as the weather permits. BAK/plg Truly ,yours, KIEFER CONCRETE, INC. Blair A. Kiefer' President QUALITY CONTRACTING SINCE 1951 C�%(JD'r4Z( p CITY OF L ORT COLLINS P.O. BOX 530, FORT COLLINS, COLORADO 80522 PH (303) 484-4220 EXT. 305 ENGINEERING SERVICES DEPARTMENT February 9, 1979 Mr. Harry McCabe W-M Ventwre 222 West Magnolia Street Fort Collins, Colorado Dear Harry: This letter will confirm our recent discussions regarding the status of improvements on Eastborough Subdivision. As I indicated, there are several items associated with public health and safety which can not be included in an escrow account. These are: (1) raising all valve -boxes and manholes within the subdivision, and (2) providing a temporary swale through the easement between the catch basin on Lemay and Eastborough Drive in order to relieve the ponding on Lemay. No additional building permits or certificates of occupancy will be issued for structures within this subdivision prior to the completion of these :improvements. The remaining earthwork on the detention pond, the concrete trickle channel and walks, and the permanent drainage facility between Lemay and Eastborough Drive are the improvements included in the escrow account. I have received your request for the oversizing repayments on Centennial and Len -ay including the applicable bills. Once I have completed a review of these requests, I will initiate a purchase order through the Finance DepartTent for the appropriate amount withholding an amount equal to 150 percent of the estimated cost of the remaining improvements. These funds will be released upon completion of the improvements subject to the approval of the City Engineer. Finally, the detention facilities will be monitored through the coming year in order to evaluate the groundwater conditions. It is our under- standing that if some additional work is required to alleviate such groundwater problems, that �,x)rk will be undertaken at your expense upon request by the City Engineer. If you have any additional questions regarding these matters, please do not hesitate to contact me. Sinc rely,. %jar- Dev_ or�rrit Engineer 100% Recycled Bond CITY OF FORT COLLINS P.O. BOX 580, FORT COLLINS, COLORADO 80522 PH (303) 484-422( ENGINEERING DIVISION EXT. 728 March 13, 1979 Mitchell Simmons Flatiron Paving Company P.O. Box 229 Boulder, CO 80306 Dear Mr. Simmons: Last spring one of your crews extended the fire hydrant midway on Eindborough Drive without any compactive effort. The result being excessive trench settlement causing damage to curb, gutter and walk. As this work is still under warranty, it is your responsibility to take care of all work necessary to correct this situation. I would appreciate this repair work to be completed as soon as possible. Sincerely, Dave Stringer Construction Inspector