Loading...
HomeMy WebLinkAboutEAST VINE STREETS FACILITY PUD - Filed CS-COMMENT SHEETS - 2003-07-31PROJECT (MA6%m� MMAM COMMENT SHEET City of Fort Collins DATE: 4 June 1991 DEPARTMENT: FQG t we�2, Q 6 ITEM: 30-91 A EAST VINE DRIVE STREETS FACILITY - Preliminary No Problems Problems or Concerns (see below) Atwr,16 will n&0 4v ir, held 4v . d t,rt,C 4r�P. + improve ��' c1�,-havj s . raj. Wt AW - V dc-,5604;A� tAJhA4- *dy me, viiNrj 4o k as w411 aol, uJhK4- 444r cfttAvg iv4i cAt are 0u'*'0>'qrv. , -16 prope.e4-y 11) arv��dzra4 4v -A-of* on 4C -b �► wt( �o be dr�un�C ,�n�►; 'h cLctG +0 r•IS •pr(hCI vW i+y 40 Date: (P116 A. ( Signature: CHECK IF REVISIONS REQUIRED: ❑ PLAT D•1/�i, iUt- jp►� A*ft ❑ SITE ❑ LANDSCAPE ri Wt - . - 1- - -1 . T;TILITY DEVELO v1E. SE 31 N�ORT*IIS�L�COLCE PX 580 FORT COLLIN�COL R b 1D0 05220 (130 )2:1-6750 PLANNING DEPARTMENT - 021 AA ,. , --&, .t „ r__ i;L-.oi AI>n .ft^, 18. The ownership certificate on the O.D.P. should be titled "Owner" and the attest by the City Clerk should have a standard notarial block. 19. On sheet two of four, please label the landscaped area south of the new administration addition. 20. On sheet four of four, please indicate the surface treatment around the water man facility. Is this gravel or hard surface? If hard surface, directional arrows should be painted to channel traffic. 21. The architectural sheet should indicate the materials of the existing salt storage building. 22. Please indicate the color of the garage doors on the south elevation. 23. It is recommended that the four windows on the new construction on the east elevation be treated with arches that reflect the arches on the existing building's north elevation. 24. With the architectural sheet, and two landscape sheets, and the plat, the package totals eight sheets. However, the O.D.P. and the plat will be filed separately. Consequently, the O.D.P. should be labeled sheet one of one. The plat is already correctly labeled as sheet one of one. The P.U.D., with landscape and architectural sheets, should be labeled a series of six sheets. This will help after all the sheets are filed in their respective areas. This concludes Staff comments at this time. In order to remain on schedule for the April 26, 1993 Planning and Zoning Board meeting, please note the following deadlines: Plan revisions are due April 8, 1993 P.M.T.Is, 10 prints, colored renderings are due April 19, 1993 Final documents are due April 22, 1993. Please call at your convenience to discuss these comments or to set up a meeting with the appropriate City representatives. Sincere1 JA&4 Ted Shepard Senior Planner xc: Sherry Albertson -Clark, Chief Planner Kerrie Ashbeck, Civil Engineer Enc. PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: October 12, 1998 TO: Engineering PROJECT: #53-98 East Vine Streets Facility - PUD (LDGS) Amended Final All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, November 4, 1998 GENERAL COMMENTS: Sheet C-1: Cover Sheet • Please modify the General Notes. • Please provide a Vicinity Map on the Cover Sheet. • Please include a Plat of the Lots for reference purposes. Sheet C-2: Demolition Plan • Please darken the plans. There are a lot of areas that are extremely hard to read. Sheet C-3: Lot `2' Site Plan • Please darken the plans. There are a lot of areas that are extremely hard to read. • You will need to get permission from the PRPA to encroach onto their easement to construct the large vehicle enclosed building. • Please remove the pavement thicknesses. Continue to page 2 Date: i' %`i �98 Signature:_si - CHECK HERE IF YOU WISH TO RECENB COPIES OF REVISIONS ✓ Plat ✓ Site _ Drainage Report _ Odw ✓ Utili ✓ Ube Utility ✓ Lads* City of Fort Collins Continued from page 1 Sheet C-4: Lot'413' Site Plan • Please darken the plans. There are a lot of areas that are extremely hard to read. • You will need to get permission from the PRPA to encroach onto their easement to construct any buildings since the buildings lie along the easement line.. • You will need to acquire construction easements along the Lot '4A' and '46' property line if the Lots have different property owners. • Please show and label all easements. Sheet C-5: Utility Plan Please darken the plans. There are a lot of areas that are extremely hard to read. Please show and label all easements. A. REVISION COMMENT SHEET DATE: December 23, 1999 DEPT: Engineering PROJECT: #53-98 East Vine Streets Facility - PUD (LDGS) Amended Final All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, January 27, 1999 MAJOR COMMENTS: You will need a Development Construction Permit prior to beginning any construction. ❖ All easements must be secured, dedicated or vacated prior to beginning construction. Date: I /z57/99 Signature: Please send copies of marked revisions _Plat _Site _Utility _Landscape A Other City of Fort Collins REVISION COMMENT SHEET DATE: December 23, 1999 DEPT: Engineering PROJECT: #53-98 East Vine Streets Facility - PUD (LDGS) Amended Final All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, January 27, 1999 MAJOR COMMENTS: Date: d• You will need a Development Construction Permit prior to beginning any construction. ❖ All easements must be secured, dedicated or vacated prior to beginning construction. ►/Z- /,'�f1 Please send copies of marked revision Signature:_ s _Plat _Site'-r.:,. _Utility _Landscape _Other City of Fort Collins REVISION COPY COMMENT SHEET DATE: March 25, 1999 TO: Engineering PROJECT: #30-91 CDOT Region 4 Fort Collins Maintenance Facility — Type I (LUC) PDP All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, April 14,1999 No Comment F1Problems or Concerns (see below or attached) 6 l ENGINEERING DEPT. NOTE: THIS REPRESENTS THE BEST QUALITY IMAGE POSSIBLE TAKEN FROM VERY POOR QUALITY ORIGINALS Date: CHECK HERE IF YOU WISH TO ]RECEIVE COPIES OF REVISIONS Pit site _ Drainage Report — Orbs[ _ Utley _ Redline Utiky _ Ufl& pe PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: May 6, 1998 TO: Engineering PROJECT: #30-91C CDOT Region 4 Fort Collins Maintenance Facility - Type I (LUC) PDP All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, June 3,1998 ZS �pNSv�-��ot�l �n S2w�Q�Ts 5 5� ,�._T_:�._-� ��--v-S.,-k3 --- V-- •---ate.._ 7, L!�Mo w W CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Z.-Reffic MY �e 4ft City of Fort Collins Commum,y Planning and Environmental St-fvices Current Planning City of Fort Collins June 10, 1998 Rex Touslee 2660 Lochbuie Circle Loveland, CO 80538 Dear Rex, Staff has reviewed your documents for the CDOT Region 4 Fort Collins Maintenance Facility PDP, that were submitted on May 6, 1998 and would like to offer the following comments: 1. The Water Conservation Specialist offers the following comments: a. The landscape plan shall contain a general note calling for the review and approval by the City of Fort Collins of any required landscape irrigation system, prior to the issuance of a Building Permit. Please add this note to the landscape plan. b. The landscape plan shall include the total area (in square feet) for each landscape category. Landscape categories are distinguished by their water requirements and intended maintenance level. Examples of possible categories include, but are not limited to, high water turfgrass, low water turfgrass, low water planting beds, moderate water planting beds, and non - plant areas (paved areas, etc.). 2. The Light and Power Utility stated the developer needs to contact the electric utility engineering division to coordinate electric facility (including transformer) locations, electric service requirements, and electric development charges. 3. The Zoning Department offered the following comments: a. What is the purpose of the drive around the building? It does not appear to meet accessibility requirements for a fire truck and there are no doors on the west building elevation. b. Please indicate the proposed use for the building within the building footprint on the Site Plan. C. Please indicate building envelope dimensions on the Site Plan. 28l North Colle;e Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (9; 0) 221-b7 50 • FAX (970) 416-2020 d. Please dimension the length of the building (north to south). 4. The Poudre, Fire Authority offers the following comments: a. Fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction when any portion of the facility or any portion of an exterior wall of the fires story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. This fire lane shall be visible by painting and signage and maintained unobstructed. Any building not meeting this criteria shall be fire sprinklered. The proposed building exceeds 5,000 square feet in size for Type V construction and therefore must be fire contained or fire sprinklered. The tum-around at the end of the emergency access must have an outside turning radius of forty (40) feet or more, and an inside turning radius of twenty (20) feet. Fire hydrants are required with a maximum spacing of 500 feet along an approved roadway. Each hydrant must be capable of delivering 1,000 gallons per minute at a residual pressure of 20 psi. Hydrants shall be of an approved type as defined by the water department and the fire department. No commercial building can be greater than 300 feet from a fire hydrant. 5. The Building Inspections Department offers the following comments: a. Accessible exterior wheelchair routes and parking facilities shall be provided with each phase of the development in accordance with Uniform Building Code Chapter 11, Appendix Chapter 11, Division I and the American National Standards Institute Publication A117.1-1992 titled Accessible and Usable Buildings and Facilities. Accessible parking spaces are eight feet wide with a five feet wide adjacent access aisle. Slopes for parking and access aisles shall not exceed 1:50 in any direction. b. Buildings larger than 5,000 square feet shall be equipped with an automatic fire suppression system throughout in accordance with Uniform Building Code Section 904.2.2 as amended by the City of Fort Collins. C. Buildings shall be designed to comply with the Fort Collins Energy Codes. The residential code is an amended version of the 1995 Model Energy Code and the nonresidential code is based on ASHRAEPES (American Society of Heating, Refrigerating and Air-conditioning Engineers/Illuminating Engineering Society) 90.1-1989. 6. The Current Planning Department offers the following comments: a. Deciduous trees at 40 foot spacing are required on the north and south sides of the: Streets Facility Access Drive as noted on the redlined landscape plan. Please refer to Section 3.2.1 [E][5][d] of the Land Use Code. According to Section 3.8.11 [2] of the Land Use Code, chain link fencing with or without slats shall not be used as a fencing material for screening purposes. A wooden fence is needed along the north, south and west sides of the: property as noted on the redlined landscape plan. Landscaping (trees and shrubs) should be placed on the exterior side of the fence in order to provide visual integration of the fence in accordance with Section 3.2.1 [E][1 ][d] of the Land Use Code. C. The proposed spacing of the ornamental and deciduous trees needs to be in accordance with Section 3.2.1 [D][1 ][c] of the Land Use Code. A 6' wide sidewalk detached 6' from the back of the curb is needed from Linden Street across Lot 5-A and 4-A on the north side of the Streets Facility Access Drive. Please contact Ron Mills to discuss the City's willingness to contribute to the cost of constructing the walk across Lot 5-A. Please refer to Section 3.2.2[C][5][a] of the Land Use Code. e. 6' wide attached sidewalks are needed on the west side of the CDOT access drive and the north side of the parking lot as noted on the redlined Site and Landscape Plans. Please refer to Section 3.2.2[C][5][a] and Section 3.2.2[D][1] of the Land Use Code. f. Patterned colored concrete crosswalks are needed as shown on the redlined Site and Landscape Plans as per Section 3.2.2[C][5][b] and Section 3.2.2[D][1] of the Land Use Code. g. Curbcuts and ramps are needed at all pedestrian crosswalks and handicap parking spaces as per Section 3.2.2[C[[2] of the Land Use Code. h. Please clarify the parking ratio used for the proposed facility. Industrial uses are permitted a maximum of 0.75 spaces per employee. I. The drive aisle of the parking lot must be a minimum of 20 feet wide as per Section 3.2.2[L][1] of the Land Use Code. j. Lighting levels shall not exceed 0.1 foot candle at a point 20 feet beyond the property line as a direct result of on -site lighting as per Section 3.2.4[D][8] of the I -and Use Code. Please note the highlighted areas on the Lighting Plan and revise accordingly. DATE: 4 June 1991 DEPARTMENT: 04 bl ky0e t-'b ITEM: 30-91, EAST VINE DRIVE STREETS FACILITY - Master Plan No Problems �'�✓ �4►'►�111'�iVl-fS 4!?fil'L Problems or Concerns (see below) Date: Signature: 444;1 94444� CHECK IF REVISIONS REQUIRED: ❑ PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT k. Per Section 4.23[E][1 ][c] of the Land Use Code, new building color shades shall be neutral, with a medium or dark color range, and not white, bright or reflective. Please revise the roof color. I. Please revise the City' Planning certifications and signature blocks to reference approval by the Director of Planning rather than the Planning and Zoning Board. The proposed use is a Type 1 Land Use and is not subject to Planning and Zoning Board review unless modifications to standards are requested. M. Please provide an Attorney Certification and Signature block on the Plat regarding the ownership of the property. This certification is unnecessary on the Site Plan and can be deleted. n. Please revise General and Planting notes on the Site and Landscape Plans as noted on the redlined plans. o. Please provide a plant list in the format noted on the redlined landscape plan. P. Please revise the plan set in accordance with the miscellaneous changes that are noted on the redlined plan set. q. Please number the sheets of the plan set consecutively (Site Plan = sheet 1 of 4; Landscape Plan = sheet 2 of 4 ; Building Elevations = sheet 3 of 4; Lighting Plan = sheet 4 of 4). r. Please return all redlined plans with the plan revision submittal. 7. The Transportation Planning Department requests that a sidewalk be constructed on the north side of the Streets Facility Access Drive from Linden Street to the eastern property line of Lot 4A. 8. The Engineering Pavement Department stated that if public street construction is required along Linden Street, a pavement design and final soils report will need to be submitted prior to construction. 9. The Mapping Department offers the following comments: a. The Basis of Bearing, calls the line "North Line of the Northwest 1/4". It should be the Northeast 1/4. b. In the dedication, the legal should be "Lots 3, 4, 5 of East Vine Streets Facility PUD", not what is shown. 10. Comments and redlined utility plans from the Engineering Department are attached. Please return all redlined documents with plan revisions. 11. Comments and redlined utility plans from the Stormwater Utility are attached. Please return all redlined documents with plan revisions. 12. Comments and redlined utility plans from the Water and Wastewater Utility are attached. Please return all redlined documents with plan revisions. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please provide a written response to each of the above stated comments with the submittal of plan revisions. An administrative hearing date will be assigned once all comments have been addressed and revisions have been reviewed. Please contact me at 221-6206 if you have any questions or concerns related to these comments. Sincerely, �%YfZ4 Michael Ludwig, AICP City Planner xc: Dave Stringer Stormwater Utility Current Planning File #30-91C Develop; nt Services Planning Department June 27, 1991 Mr. Frank Vaught Vaught -Frye Architects 2900 South College Avenue Fort Collins, CO. 80525 Dear Mr. Vaught: Staff has reviewed the request for a Master Plan and Preliminary P.U.D. for the East Vine Drive Streets Facility and offers the following comments: Master Plan/Overall Development Plan Comments: 1. Based on the L.D.G.S. audit that was completed in 1990, the Planning Department is responding to a concern that, semantically, the term "Master Plan" generically refers to the a grand scheme for the entire city. In order to avoid confusion with the lay public (at least those responding to the survey), the old term of "Master Plan" is now hereby referred to an "Overall Development Plan". While "O.D.P." may become common shorthand usage, please note, in full text, the new term. 2. Utility mains should be included on the O.D.P. 3. Are there any plans to alter the exterior of the buildings that will be preserved? If so, a note on the O.D.P. should so indicate. 4. The term "Future Asphalt Operation" could mean that a batch plant could be operable. Perhaps more detail should be provided so that the term "Operation" is more specific. Is this area where recycled asphalt will be stored? Will a crusher be in operation? If so, please specify. 5. Parcel D should be given a rough list of anticipated uses. 6. Under "General Notes", please provide a brief "Planning Objectives" for the project. 7. The Ninth Street employee and public access should be tied down with more restrictive language as to the extent of allowable truck traffic. At the neighborhood meeting, the expectation was set that this access will be used by trucks and heavy equipment only during emergency or snowstorm conditions. Preliminary P.U.D. Comments: 8. Please be aware that lighting, fencing, and security in general will be an important concern. The County Shops have experienced theft and vandalism. For further information on deterring crime, please contact Ken Kirchoff with Police Services. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-e750 9. The site is located in the Dry Creek Drainage Basin. The drainage fees are $4,043 per developed acre. 10. The detention area should be landscaped with native grasses, wildflowers, trees, and shrubs. The Department of Natural Resources can assist in a design that promotes wildlife habitat values through landscaping. In addition, the water quality enhancement area should be landscaped with wetland plant species as appropriate. IL Trees should be kept away from underground gas facilities by a minimum of four feet. 12. Existing natural gas service and meter should be checked for adequate capacity once total loads are known. 13. An eight foot wide utility easement is requested by Light and Power along the southerly property line. 14. Occupancy classification of the wash/paint building must be determined in relation to proposed uses of hazardous materials and flammable liquids. Please provide information to the Poudre Fire Authority as to the quantities and uses of these materials. 15. There is a concern about the proximity of the Linden Street access to the Vine Drive intersection. This access should be moved back from the intersection so there is a 200 foot separation. 16. The right-of-way dedication for the future alignment of Linden Street should be discussed with the Engineering Department. 17. It is suggested that the Streets Department begin discussions with the Engineering Department about the extent of street improvement obligations. Street improvements should be constructed where necessary to mitigate the impact of the operation on the public street system. 18. Finally, any utilities crossing the railroad will need a permit from the Burlington Railroad. This concludes Staff comments at this time. Both the O.D.P. and the Preliminary are scheduled for the July 22, 1991 Planning and Zoning Board hearing. In order to stay on track for this hearing, please note the following deadlines: Plan revisions are due Wednesday, July 10, 1991. P.M.T.'s, 10 prints, colored renderings are due July 15, 1991. Signed mylars (O.D.P.) are due Thursday, July 18, 1991. As always, please call if you have any questions or concerns regarding these comments. Sincerely, -�A4-"r-4 Ted Shepard Project Planner cc: Kerrie Ashbeck, Civil Engineer PROJECT COMMENT SHEET cicv of roc Coffins i DATE: 1 March,1993DEPARTMENT: ITEM: 30-91 B E. Vine Streets Facility Phase 1 -F Planner: Ted Shepard Please respond to this project by Friday, March 12, 1993. No Problems _Problems or Concerns (see below) ea.vr�n 4-r I�lr�� side [- a'Je I ea U+i 1wq �'eeA GC 4v '�- ctke �xi I6 V-e-�-,— e c J 2 NIAy P�v�l'r-��n V�,vvay s- Ae,-'A .0 -in e %-�[ i'% 7 (--�4wj�' 4104 W tin --�Y- :-eAi_vK - I'� Date: Signature: CHECK IF REVISIONS REQUIRED: ❑ PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)2214750 PLANNING DEPARTMENT JoiPROJECT COMMENT SHEET City of Fort Collins DATE: 1 March, 1993DEPARTMENT: ITEM: 30-91 B E. Vine Streets Facility Phase 1 -F Planner: Ted Shepard Please respond to this project by Friday, March 12, 1993. No Problems Problems or Concerns (see below) :s owl a,w� P.5•Cr,. "A1v#AG- AAS �itaw►tom L�iv� 5v t.yi�b �viia;�u�,s o�v �7t+%s siM, ?W-5 sue-✓%� %n« �s A #wtJLv pr.6- ma70a #ZvdPCW— �4M.7 � � Z • Ajvy p0opo s00ic;' t50;G,0; #v, ,a vo. • flo�++s 7*0r- 1q i.R or PM T 7& NoVVAA L. Aid S. %OYflr aAOV twscisa is W--44 p1.vv%zvD /*= �JCiWiG�f G��+/C�5 S�yt/!,d` �i %!f JiI,A►Nes,t 4X dr 40r�10 op *q:0Wxr !-ols • Date: lSignature: � ❑ PLAT CHECK IF REVISIONS REQUIRED: ❑ SITE ❑ LANDSCAPE UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT PROJECT J09mr,COMMENT SHEET City of Fort Collins DATE: 1 March, 1993DEPARTMENT: Z%-f, �t ITEM: 30-91 B E. Vine Streets Facility Phase 1 -F Planner: Ted Shepard Please respond to this project by Friday, March 12, 1993. No Problems K Problems or Concerns (see below) /U' f a/l eri sf v9 felz plie4 e ca,61G.5 ,,6h e- cf 1"dtuiPy5, ZIS WZ--'57- 7,5, 1-e d% ?.4 7'�4e fele�a'`a with f/te ale vB%ofe z e le Date: 3 - ¢-93 Signature: J,0A A wage 22-11-7470 ❑ CHECK W REVISIONS REQUIRED: PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVFLOP�[ENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT Commun;' - Planning and Environmental c- -vices Planning Department Citv of Fort Collins March 23, 1993 Mr. Joe Frye Vaught - Frye Architects 1113 Stoney Hill Drive Fort Collins, CO 80525 Dear Joe: Staff has reviewed the request for East Vine Streets Amended Overall Development Plan, Lot One, Three, Four, Five, and Tract A Final P.U.D., and Plat. The following comments are offered: 1. On the plat, the width of the P.R.P.A. easement should be indicated. 2. On the plat, the approval block should not be for the Planning Department but rather the Planning and Zoning Board. 3. On the plat, the dedication statement is incomplete. 4. U.S. West has commented that not all telephone cables are shown on the drawings. Please contact John Hagge for further information. Also, U.S. West would like to redesign the cable entrance to coincide with new development. 5. The Public Service Company has commented that there is currently only one natural gas service line supplying buildings on this site. This service line feeds a multiple meter header located at the northeast corner of the existing building on Lot 2. Any proposed building additions that result in increased natural gas demand will require that separate natural gas service lines be installed to each building by PSCo. Utility easements will have to be provided on the plat for these service lines since the buildings are located on separate lots. 6. The sidewalk along Lemay should continue to the south property line, south of the driveway. For the portion of the sidewalk along Lemay that is outside the right-of-way, an easement should be provided. Generally, a 15 foot wide easement is granted next to the right-of-way line of arterial streets for utilities and sidewalks. 7. The Engineering Department requires a Soils Report. 8. What is the status of the driveway cut on Linden Street adjacent to the railroad tracks? This driveway is indicated on both sheet one of four O.D.P. and sheet four of four, Final Site Plan for Lots 3, 4, and 5. There was discussion that this driveway would be eliminated at some time in the future. If so, a note should be added to both sheets indicating future closure of this driveway due to its proximity to East Vine Drive. 9. The Poudre Fire Authority requests that the western fire hydrant be moved an additional two feet from the building and protected from vehicular damage. 10. The design of the paint storage area must conform to both the Uniform Building Code and the Fire Code. 11. If the quantities of hazardous materials exceed the limits for long term hazardous materials management plan (see enclosed information), then a Hazardous Materials Impact Analysis may be required. 12. On sheets one of four and two of four, please correct the zoning designation from Planned Industrial to Industrial Park. 13. Please indicate the colors of the tube steel picket fence. 14. Please provide information on the sign along Lemay. The P.U.D. should indicate height, width, pedestal material, and source of illumination. This information will be the specification on which the sign permit will be issued. If a duplicate sign is already in existence, please tell us so we can take a look. 15. The P.U.D. should indicate that all perimeter pole mounted and building mounted light fixtures will be equipped with down directional luminaries to minimize light spillage, especially on the east. It is further recommended that security lighting be high pressure sodium lamps, not mercury vapor. Light and Power is encouraging h.p.s. due to energy efficiency and because it casts a softer illumination rather than the "bluish white" of mercury vapor. A specification sheet, if available, of the light fixtures would help evaluate the impacts of perimeter security lighting. 16. Because the P.U.D. is a City project, the City Forester has carefully reviewed the landscape plan. The comments are extensive and are attached as a separate enclosure. Discussion of these comments should be addressed to Tim Buchanan. 17. The approval block for the City Engineer is not needed on the Overall Development Plan, sheet one of four.