March 1 1 , 1974
Mr. Roy Bingman
,City Hal 1 � Fort Collins, Colorado
Dear Roy:
I would like to document our agreements over the post five weeks
relating to the utilities and improvements I am committed to construct
in Drake Park.
The attached documents should define all the work items to be done
and the minimum which are required prior to the issuance of building
permits, and prior to the issuance of certificates of occupancy. These
requirements have been organized into 2 development phases for the
first filing, basically the easterly 4 acres, and the westerly 4
acres. This has been done to reduce the front end costs of lots which
may not be developed for a few years.
However, I have agreed to develop both phases of the road in front
of Drake Park at one time due to the new ordinance increasing the
percentage of road construction the city will pay and the city's desire
that the entire new lane on Drake be completed as soon as possible.
Cost proportionment was agreed to as follows:
(a) Drake Associates will pay for an 8 ft. overlay of the
existing Drake Road for the entire Drake frontage (approx.
1 1 50 linear feet) � d`'
(b) Drake Associates wi l l pay for 12 ft. of surface and --4a+f
-of the -base and sub -base (7") for the entire Drake frontage
(c) The City of Fort Collins wi l l pay for the e-t-� has f o-f--lase
and -sub-base (7") -requi red in item (ir) for the described
12 ft. width along the entire Drake frontage.
(d) The City of Fort Collins will pay for 20 ft. of surface and
`14' of base and sub -base for the entire Drake frontage.
(e) Drake Associates will pay for the curb and gutter and
sidewalk for the entire Drake frontage.
,, ,.' - ,.
In addition to the above,Drake Associates agreed to construct the
sidewalk along Redwing for the 2nd filing at the same time it constructs
the sidewalk along Redwing for the first filing. This sidewalk should
be constructed in the next few months.
Roy, if you see any problems with my understanding of our agreements,
please let me know as soon as possible.
cc: Reid Burton
Burton Construction Co.
Yours sincerel ,
Barr E. Cunningham
Y
General Partner
Drake Associates Limited
UTILITY WORK ITEMS TO BE COMPLETED IN DRAKE PARK - FIRST FILING-
1. Construct curb, gutter, and sidewalk and eme- arn-e---o= road along Drake
Road from a4>eut the, fn+ddle of lot 5 to Redwina Road (approx. 40
linear ft.)
2. Construct a sidewalk along Redwing (approx. 440 linear ft.)
3. Construct a drainage line north of lot 5 to Drake Road (approx. 72 linear ft.)
4. Construct a drainage line from Redwing toward lot 2 (approx. 144 linear ft.) `=
� 1 u
5. Construct a water line from Redwing to the easterly edge of lot 4
(approx. 480 linear ft.)
6. Construct a sewer line between lots 3, 4, and 5 (approx. 343 linear ft.)
7. Install a fire hydrant in front of the westerly edge of lot 3.
8. Install a fire hydrant near the south-east corner of lot 2.
9. Construct a drainage line from Redwing west approx. 463 linear ft.
10. Complete the water main loop around to Drake.
11. Install a fire hydrant at the south-west corner of lot 7.
12. Install a fire hydrant at the north-west side of lot 8.
13. Construct a sewer line between lots 6 and 8.
14. Construct curb, gutter, and sidewalk and one lane of road from about the
middle of lot 5 to the westerly edge of lot 8.
* See attached utility plan
L JOAN
1 j1 1
WI LLIAM C. STOVER
ATTORNEY AT LAW
UNITED BANK BUILDING -SUITE 315
FORT COLLINS, COLORADO 80521
November 3, 1977
mr. Barry Cunningham
Drake Park Associates
333 West Drake
Fort Collins, Colorado 80521
Dear Barry:
P. O. BOX 523
482-3664
AREA CODE 303
I reported to the Board of Directors of L•arimer County Canal
No. 2 Irrigating Company the results of our meeting to look
over the boundary lines along the No. 2 Canal and also reviewed
with thorn your P.U.D., particularly as it pertains to parking
on the southwesterly sine of your land.
The Board realizes your dilenna. Now that your P.U.0. has been
approved, it: makes it more difficult for an actual exchange of
land by Quit Claim Deed.
Your suggestion that an exchange be maee on the easterly extremity,
but not on the westerly, was consiOered by them to be a wholly one-
sided proposition and defeated the only purpose the ditch conrany
had in mind, which is reasonable ingress and egress for the
r..aintenance of their ditch which, amcngr other things, Toill prevent
possible flooding of your improvements at some time in the future.
The Ditch Company Board is adamant that they must have this
reasonable ingress and egress right-of-way along their ditch,
and will exercise the same regardless of the layout of your PX.D.
Unless something can be worked out amicably, please consider this
notice to both you and the City that the ditch company fully
intends to maintain reasonable access at all tiles to their
catch bank from Drake Road to Redwine Drive.
Again, we wish to express our concern for not only maintenance
but safaty of the public, particularly children, would access
be denied to r:.aintenance and emergency vehicles.
Respectfully yours,
WCB : s 1 William C . Stover,
Secretary
ccs 4r. Glen A. Johnson
City Engineer
drake associates, Itd.
January 4, 1978
Mr. William C. Stover
United Bank Building - Suite 315
Fort Collins, CO 80521
Dear Bill,
I believe my position, that the Canal Company can use the parking areas in
Drake Park from which to maintain their ditch, is a fair one. I will not
be intimidated by a position such as stated in your November 3, 1977 letter.
As I told you last Spring, if you have a legal right to my land, show me
the legal document. Since you have not done so, I assume you have no such
right.
Yours sincerely,
Barry. Cunningham
BEC:jas
cc: W. Glenn A. Johnson
!/ City Engineer
A. March
f�L one drake park, suite 32 333 west drake road fort collins, colorado 80521
.,.MMENNSIb
MARCH, MYATT, KORB, CARROLL & BRANDES
ATTORNEYS AND COUNSELLORS AT LAW
ROBERTSON BUILDING
110 EAST OAK STREET
ARTHUR E.MARCH,JR.
RAMSEY D. MYATT
MARK L. KORB
JOSEPH T.CARROLL,JR.
ROBERT W. BRANDES, JR.
RICHARD S. GAST
Mr. Mark Engemoen
Civil Engineer II
City of Fort Collins
Post Office Fox 580
Fort Collins, CO 80522
near Nark:
FORT COLLINS, COLORADO 80524
,303; 482-4322
October 13, 1983
ARTHUR E. MARCH
1909-1981
MAILING ADDRESS:
P. 0. BOX 469
FORT COLLINS, CO 80522
At the request of :fir. Parry Cunningham, this letter is writ-
ten in response to your letter addressed to hire, Dated Septetober
15, 1923. -Your last letter pertained to a 0rainl.ine nr000sed to
be installed by PF,CO Fuilders, Inc. behind the sidewalk along
Drake Poa(9 in Drake Par'<.. Mr. Cunningham had previously refused
to allow this installation a,)sent a bond or other adequate guaran-
tee of repairing any damage done durinc the installation of the
drainline and continued maintenance of the drain.line without da.m-
aqe to common improvements. Your letter advises that the City
will take full responsibility for any damage resulti_nq from the
installation of the drainlin,-. This is not adequate since it does
not incluA e responsibility for any damage caused 1-y the continued
maintenance and/or rer-air of the drainline. If the City will
undertake to assure responsibility for any such damage, the grant
of right to use the right-of-way by the City for this purpose will
he accepted k,v the Drake Park Owners Association. Absent such
assumption of r_esponsihility, Drake Park will continue to require
a bond or other adequate guarantee.
If anything further is needed in connection with this matter,
please advise. If the Citv is willing to assume r_esponsi.hility as
reouested in this letter., please send the original of the letter
doing so to Mr. Cunningham with a copy to rate.
Sincerely yours,
i ARCM , MYATT,# KORB, t
B y :
Arthur F . Parch,"
AFM/clh
RROLL & PRANDES
i'
Jr.
September 8, 1983
City of Fort Collins
Attn: Marc Engemoen
P.O. Box 580
Fort Collins, Colorado 80522
Dear Mr. Engemoen:
PEMCO Builders, Inc. wishes to construct a drainline for a sump pump
for the new building on Lot 8 of the Replat of Drake Park. The proposed
drainline would be installed behind the sidewalk along Drake Road,
running east approximately 300 feet and tying in to the existing catch basin.
I understand and agree that PEMCO Builders, Inc. is solely responsible
for the proper installation and maintenance of this drainline and for
the prompt and complete repair of any damage to public or private
improvements which may result from the installation and operation
of this drainline.
I also understand that the City will obtain permission from Mr. Cunningham,
the owner of Drake Park, for the installation of the drainline. When such
permission is obtained, I will contact the City's construction inspectors
prior to installation of the drain.
Sincerely,
0-,
Pete Cottier
PEMCO Builders, Inc.
CITY OF FORT COLLINS
MEMORANDUM
DATE: August 29, 1983
TO: Bob Smith, Assistant City Engineer - Storm Drainage
FROM: Marc Engemoen, Civil Engineer II
RE: Sump Pump at Drake Park
I believe I have explained the sump pump problem at Drake Park to you before.
Briefly, Pete Cott_Ler has a sump pump with no outlet. The two possibilities
are to discharge it into the curb and gutter or into a small pipe behind the
sidewalk. The distance to the nearest catch basin is approximately 300 feet.
Obviously the pipe behind the sidewalk is the best solution. Unfortunately,
the developer of Drake Park, Barry Cunningham, refuses to permit this construction
without some guarantee that any problems the pipe might cause will be corrected.
He wants Mr. Cottier to provide a bond or escrow account, or have the City provide
a letter assuming responsibility.
I've spoken to Paul Eckman about this. He thinks Mr. Cunningham may be able
to refuse to permit: the construction even though it is within the City right-
of-way. He also recommends Mr. Cottier be required to bond the construction.
All of these seem out of proportion to me. By denying permission to drain the
sump pump into the sanitary sewer, the City has placed Mr. Cottier in a difficult
position. It would obviously be simple for him to outlet into the curb and gutter,
but he realizes this is not the best solution. He wants to accommodate the City
by installing the pipe, but I feel the guarantee we're requiring is unreasonable.
I think we should have Mr. Cottier provide a simple letter agreeing to repair any
damage caused by the construction. We should, in turn, provide a letter which
will satisfy Mr. Cunningham. Our inspectors will monitor the construction,
and the problem will be resolved.
I don't feel I can take this action at my level, but hope you or Tom will agree
with my proposal. The hassles with bonds and maintenance guarantees are uncalled
for in a case this simple.
Please let me know what you want me to do on this as soon as possible.
Drake Executive Plaza
2625 Redwing Road, Suite 210
Fort Collins, Colorado 80526
(303) 223-7567
Mr. Pete Cottier
PEMCO Builders, Inc.
1241 Riverside
Fort Collins, CO 80524
Dear Mr. Cottier:
DPDrake
Professional Park
August 23, 1983
I have contacted Mr. Engemoen and he is looking into the legalities
of a private use of a public right-of-way. My attorney questions
whether this can be done. I did tell Mr. Engemoen that if the
City took full responsibility for any landscape or sprinkler
damage to the right-of-way area the Office Center Owner's
Association would agree. At this point it is my understanding
that the City will not take such a position. Mr. Engemoen is
suppose to contact the city attorney and then contact my attorney,
Art March.
In your letter I think you are confusing a right-of-way and
ownership. We had to landscape the area in question and bond
such landscaping. If you have a question regarding this please
call my attorney, Art March.
In summary, I do not agree to have a pipe put through the Office
Center's land unless the terms of my previous letter are met.
Sincerely,
oa1� Ir•: rj�
Barry Cunningham 1
xc: Art March
Marc Engemoen