BUILDING PERMIT REVIEW
COMMENT SHEET
City of Fort Collins
DATE: 7/30/01 DEPT: ENGINEERING
PROJECT: Lot 2 Corral Business Park PUD First Filing
ENGINEER: Sheri Wamhoff
All comments must be received by: 8/29/01
❑ No Problems
M/Problems or Concerns (see below or attached)
Corral Business Park PUD First Filing September 4, 2001
Will need a mylar copy of the site and landscape plans to finalize the minor amendment.
The utility plans do not match the redlined site plans that were submitted as a minor amendment. I have marked the
areas of deviation.
Provide the correct general notes. See attached list. I can also email a copy to you if you would like it.
The street patching will need to be done to City standards and a 2 foot patch doesn't meet standards. Revise notes.
You are showing some curb and gutter to be done off -site to the west. Off -site easements are needed for any work
off -site.
Will need to obtain a Development Construction Permit (DCP) and/ or a Street Excavation Permit prior to starting
any work on site.
Where is the fire line to the site? Will need to show how this site is providing for afire line.
Since there are two sewer lines going into this site will you have to abandon one of them at the main?
l /
Date: �y� Signature; —
PLEASE SEND COPIES ❑ PLAT
OF MARKED REVISIONS: SITE ❑ NO COMMENTS — SUBMIT MYLARS
UTILITY
0� LANDSCAPE
BUILDING PERI\/IIT REVIEW
LWAISW�'-M.- ' COMMENT SHEET
City of Fort Collins
DATE: 7/30/01 DEPT: Xcel Energy
PROJECT: Lot 2 Corral Business Park PUD First Filing
ENGINEER: Sheri Wamhoff
All comments must be received by: 8/29/01
C3"1 -o Problems
❑ Problems or Concerns (see below or attached)
Date: e-/3"d/ Signature:
PLEASE SEND COPIES CHAT
OF MARKED REVISIONS: ❑ SITE
❑ UTILITY 0 --NO— COMMENTS —SUBMIT MYLARS
0 LANDSCAPE
BUILDING PERMIT REVIEW
COMMENT SHEET
NML&A�
City of Fort Collins
DATE: 7/30/01 DEPT: AT&T Broadband
PROJECT: Lot 2 Corral Business Park PUD First Filing
ENGINEER: Sheri Wamhoff
All comments must be received by: 8/29/01
❑ No Problems
Problems or Concerns (see below or attached)
C�A.,J- G.�,
pet" swjt�o ,,:a- R'-26 4-111
- /- o�
Date: / —Signature:
PLEASE SEND COPIES [1]-PLAT
OF MARKED REVISIONS: O'--S-ITE
19 TILITY NO COMMENTS —SUBMIT IvIYLARS
&;- LANDSCAPE
BUILDING PERMIT REVIEW
COMMENT SHEET
City of Fort Collins
DATE: 7/30/01 DEPT:
ENGINEERING
PROJECT: Lot 2 Corral Business Park PUD First Filing
ENGINEER: Sheri Wamhoff
All comments must be received by: 8/29/01
❑ No Problems
EI/Problems or Concerns (see below or attached)
Corral Business Park PLID First Filing September 4, 2001
Will need a m lar copy of the site and landscape pians to nnauce ule minor ame.- — .
ie utility plans o not atatc the re lined site plans that were submitted as a minor amendment. I have marked the
T
areas of deviation.
Provide the correct �4encral notes. See attached list. I can also email a copy to you if you would like it.
1 he street patching will need to be done to City standards and a 2 loot paten t10CSI1 L uiccL J1611UMU3- L-1-1.—.,.,•
You are showing some curb and gutter to be done off -site to the west. Off -site easements are needed for any work
off -site.
Will need to obtain a Development Construction Permit (DCP) and/ or a Street Excavation Permit prior to starting
any work on site.
Where is the fire line to the site? Will need to show how this site is providing for a fire line.
Since there are two sewer lines going into this site will you have to abandon one of them at the main?
Date: � Signature;--
PLEASE SEND COPIES ❑ PLAT
OF MARKED REVISIONS: SITE ❑ NO COMMENTS — SUBMIT MYLARS
4 UTILITY
O� LANDSCAPE
Transportation Services
Engineering Department
City of Fort Collins
September 4, 2001
Brian Shear
Shear Engineering Corporation
4836 S. College, Suite 12
Fort Collins, CO 8052
Dear Mr. Shear,
For your informaVon, attached are copies of the staffs "Building Permit Review/Utility Plan
Review" comments concerning Lot 2 Corral Business Park P.U.D First Filing.
The plans submitted were reviewed by numerous City departments and other agencies.
The comments are offered by Staff to assist you in preparing final plans for building permit
issuance and utility plan approval.
At this time I have not received comments from the following departments: US West and
Natural Resources. I will forward any additional comments upon receipt.
Please return all redlined plans and 4 sets of utility plans for review. And 5 site plans if you
plan on changing the site plan layout from what was approved by minor amendment.
If you should have any questions regarding these comments or if you need to meet to go
over them please feel free to contact myself or the department representative that made
the comment.
Sincerely,
P
Sheri Wamhoff
Civil Engineer II
Attachments.
cc: file
281 North PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.ci.fort-collins.co.us
September 21, 2001
Project No: 1285-4;-99
(ENGINEERINGEAR
City of Fort Collins Engineering Department
P.O. Box 580
Ft. Collins, CO 80522-0580
Attn: Sheri Wamhoff
Re: Lot 2, Corral Business Park P.U.D. First Filing; Ft. Collins, Colorado
Dear Sheri,
This is a response 1:0 your project engineering comments regarding Lot 2, Corral Business Park
P.U.D. First Filing dated September 4, 2001. Original comments, and responses to each, are
provided.
Will need a mylar copy of the site and landscape plans to final the minor amendment.
R As you and I discussed, we now recognize that the minor amendment process may not have
completed. We will coordinate mylar requirements further when utility plan mylars are
submitted. Apparently, the requirement for mylars was not made clear in Ted Shepard's
Minor Amendment acceptance letter to Pinecrest Planning and Design dated June 16, 2000.
A copy of that letter is attached for your immediate reference.
The utility plans do not match the redlined site plans that were submitted as a minor amendment.
1 have marked the areas of deviation.
R As you and I discussed, the site plan changes on the east side of the building were made in
order to accommodate the approved east building elevation view for the overhead door
location according to the approved minor amendment. We have added a handicap parking
space to conform to the approved minor amendment. We have relocated the trash enclosure
to conform with the location shown on the approved minor amendment.
Provide the correct general notes. See attached list. I can also -email a copy to you if you would
like it.
R The general notes have been changed and now reflect the latest version received from the
City of Ft Collins.
The street patching will need to be done to City standards and a 2 foot patch doesn't meet
standards. Revise notes.
R The utility notes have been changed as requested.
R The Trench Detail (Drawing 22-1) has also been added to the plans.
1836 S. Collcgc, Suitc 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com
PAGE 2
September 21, 2001
Project No: 1285-43-99
Re: Lot 2, Corral Business Park P.U.D. First Filing; Ft. Collins, Colorado
You are showing some curb and gutter to be done off -site to the west. Off -site easements are
needed for any work off -site.
R The owner of Lot 2, Corral Business Park First Filing is Western Trade Supply (Tom
Luevane). This is the same owner of the lot to the west, Lot 16, South 13 Subdivision. This is
the property on which the referenced off -site improvement would be constructed. No
temporary construction easement is required.
Will need to obtain a Development Construction Permit (DCP) and / or a Street Excavation
Permit prior to starting any work on site.
R Acknowledged.
Where is the fire line to the site? Will need to show how this site is providing for afire line.
R Please refer to sheet 4 of the plans. Afire line has been incorporated south of Lot 2. Master
Improvements Construction Note number 6 identifies and addresses this item.
Since there are two sewer lines going into this site will you have to abandon one of them at the
main.
R Please refer to sheet 4 of the plans. Master Improvements Construction Note number 1
addresses this item.
We trust that this response has addressed all of your specific comments and concerns. We have
provided responses w Wes Lamarque at Stormwater directly. A copy of that response letter is
attached for your immediate reference. If you have any questions or further comments during
your next detailed project review, please call at (970) 226-5334.
Sincerely,
Brian W. Shear, P.V.
Shear Engineering
attachments
cc: Mark Kessler: Kessler Construction Co.
Tom Luevane; Western Trade Supply
REVISION COMMENT SHEET
Building Department Review
DATE: 9/25/01 DEPT: AT &T Broadband
PROJECT: Lot 2 Corral Business Park PUD First filing
All comments must be received by Sheri Wamhoff no later than the staff
re,thew meeting:
October 17, 2001
0 No Comment
❑ Problems or Concerns (see below or attached)
Date: Signature•✓
Please send copies
of marked revisions
Plat _Site
_Utility _�_Landscape ❑ NO COMMENTS — SUBMIT MYLARS
City of Fort Collins
REVISION COMMENT SHEET
Building Department Review
DATE: 9/25/01 DEPT: ENGINEERING
PROJECT: Lot 2 Corral Business Park PUD First filing
All comments must be received by Sheri Wamhoff no later than the staff
review meeting:
October 17, 2001
❑ Nc omment
roblems or Concerns (see below or attached)
ly,
s
Date: �� Sig re: ��
Please send copies t1l
of marked revisions
_Plat _Site
_Utility _Landscape ❑ NO COMMENTS — SUBMIT MYLARS
CitV of Fort Collins
Received: 12/20/01 3:06PM;
-> WESTERN TRADE SUPPLY, INC.; Page 2
December 20, 2001
City of Fort Collins Engineering Department
P.O. Box 580
Ft. Collins, CO 80522-0580
Attn: Sheri Wamhoff
Re: Lot 2, Corral Busliness Park P.U.D. First Filing; Fort Collins, Colorado
Dear Ms. Wamhoff;
This is a response to the engineering comment regarding Lot 2, Corral Business Park P.U.D.
First Filing dated October 17, 2001. The comment requested a letter from the adjacent property
owner accepting and allowing improvements on that property. Shear Engineering Corporation
responded to a similar comment on September 21, 2001. At that time the following comment
and response was provided:
You are showing some curb and gutter to be done off site to the west. Off -site easements
are needed for any work off -site.
R The owner of Lot 2, Corral Business Park First Filing is Western Trade Supply
(Tom Luevane). This is the same owner of the lot to the west, Lot 16, South 13
Subdivision. This is the property on which the referenced off -site improvement
would be constructed. No temporary construction easement is required.
This letter acknowledges and allows improvements to be made on Lot 16, South 13 Subdivision
as part of the Lot 2, Corral Business Park P.U.D. First Filing. Lot 16, South 13 Subdivision
abuts the northeast corner of Lot 2, Corral Business Park P.U.D. First Filing. The improvement
consists of a vertical outfall curb and transition as represented on sheet 4 of 9 of the Final Utility
Plans prepared by Shear Engineering Corporation.
We trust that this response addresses your concern. If you have any questions, please call at
(970) 226-6933.
Sincerely,
Tom Luevane
Owner Lot 16, South 13 Subdivision, and Lot 2, Corral Business Park P.U.D. First Filing
cc: Mark Kessler; Kessler Construction Co.
Brian W. Shear, Shear Engineering Corporation
Fort Collins -Loveland Water District
South Fort Collins Sanitation District RE,
4700 South College Avenue
FORT COLLINS, COLORADO 80525
TELEPHONE 226-3104 — 669-4321 APR 1
April 9, 1985
Development Center
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
RE: Corral Business Park - First Filing
Dear Gentlemen:
PLC;,' N "; 9
DEPAPTIVIENT
The District staff has reviewed the above mentioned project, and submits
the following:
1. The general notes are to include conformance to the Fort Collins -
Loveland Water District, and the South Fort Collins Sanitation District
standards and construction specifications.
2. All sheets are to have District sign -off blocks.
3. As indicated previously, the District requires the submittal of a hydraulic
master plan.
4. A letter from the Poudre Valley Fire Authority, indicating fire flow
requirements, is required.
5. Extended services, as shown on sheet 4 of 6, are not acceptable.
6. A minimum 20 foot easement, will be required for the existing 6 inch
water line.
7. Details are to be revised to current standards.
If you have any questions, feel free to call me at 226-3104.
Sincerely,
Mike DiTullio
District Manager
dkc
cc: Terry Farrill
CITY OF FURT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
April 24, 1985
Mr. Eldon Ward
Cityscape Urban Design
Building 21 Old Town Square, Suite 242
Fort Collins, CO 80524
Dear Eldon;
Staff has reviewed the Final PUD Plan for Corral Business Park and would
like to offer the following comments. In order to complete your submittal
for the May 20, 1985 Planning and Zoning Board meeting, revisions
reflecting these comments should be submitted no later than May 1, 1985 at
noon. Comments that can not be noted on the plans should be addressed in
writing.
1. Show where curb cuts exist or are are proposed to serve Lots 9 and 10.
These curb cuts should line up with those to the north.
2. Access drives should line up wherever possible.
3. Off -site street improvements will be required. We should meet as soon
as possible to determine if and how they can be phased. The Traffic
Impact Study should be used to justify phasing.
4. Dimensioning is missing on the southernmost driveway.
5. Smokey Street is misspelled.
6. Dimension interior radii.
7. Engineering is concerned with location of access drives relative to
easements. Discuss this with Bonnie Tripoli.
8. Bonnie has found several problems with the plat. Contact her on this.
9. Handicapped access ramps should be better located.
10. Dimension the walkway adjacent to parking. A 6' minimum width is
required.
-orral Comments
4/24/85 - Page 2
11. Note on the plan the access tie to the north.
12. All access roads, including the loading zone must be posted "NO
PARKING" for emergency access reasons.
13. All access roads should be shown as easements.
14. The 6" water main may not provide adequate fire flow. Each building
will need to evaluated based on size and risk and sprinklers may be
required.
15. Show hydrants on the plan. Additional hydrants will be required.
16. Comments made by Storm Drainage Staff in August advised against -
lot -by -lot detention. A single large pond is recommended for
efficiency, cost and maintenance reasons.
17. Initial storm frequency is 10 year, not 2 year for this site. Double
check street capacities.
18. Contact the Parks Dept. regarding drainage into the ditch. Note Section
1.2.7 in the Drainage Manual.
19. Contact Gary Huett of Public Service Co. regarding a suggested change
in the easement line east of buildings 4 & 5.
20. The smallest dimension of the loading zones must be 10' and it may not
extend into an accessway. For each building up to 20,000 s.f. in size,
1-500 s.f. loading space is required. For square footage over 20,000
s.f., an additional 500 s.f. is required.
21. Lot #7 will be allowed only one freestanding or ground sign.
22. Indicate height and material of trash enclosures.
23. Show bike racks on the site plan.
24. Show easements on the site plan.
25. Extend the sidewalk in front of building #1 back to Smokey Street.
26. Extend the sidewalk adjacent to building #6 to the east property line
and to the access drive.
27. Indicate how mechanical equipment for the buildings will be enclosed.
28. How does the project achieve an overall reduction in energy use (all
development criterion #29)?
29. A note should be added to the plan regarding screening of outdoor
storage areas.
Corral Comments
4/24/85 - Page 3
30. More detail is needed on exterior materials. What type of masonry?
31. Building foundation plantings should be provided throughout the plan.
32. Additional street trees should be provided (at least one per 45-50 ft.
of frontage).
33. A higher berm and fencing should be provided on the south property
line.
34. Screening/buffering should be intensified on the north and east sides
of the project.
35. Sight distance may be a problem at driveway intersections and entrances
to parking. Please reevaluate the landscape concept at these
locations.
36. The proposed development appears quite intense. Improved landscape
screening and attractive building materials that make a positive
contribution to the area could mitigate the impacts but Staff does have
questions regarding use of the site. The site design and building plans
do not lend themselves to the uses specified on the site plan. The
uses listed frequently require outdoor storage and display areas and
none are shown. The specified uses also require loading bays and
service areas while the submitted elevations portray more of an office
concept. How would a greenhouse or construction services use fit in?
37. Topographic information and scale should be on the plans.
38. The Police Department has requested that more interior security
lighting be provided. They are concerned that this intensity of
development and the site layout creates an area which is difficult to
patrol.
Let me know when you wish to meet on these items. P1.11's, colored
renderings, and copies of the plans for the Board are due by 4:30 on May
loth. Final documents (mylars, development agreement) are due on May 16th.
Sincerely,
Elaine Kleckner
Planner
CC: Sam Mutch, Planning Director
Bonnie Tripoli, Development Coordinator
Fort Collins -Loveland Water District
South Fort Collins Sanitation District
4700 South College Avenue
FORT COLLINS, COLORADO 80525
TELEPHONE 226-3104 — 669-4321
June 17, 1985
Bonnie Tripoli
Development Center
P.O. Box 580
Fort Collins, Co 80522
RE: Corral Business Park
Dear Bonnie,
RECEIVED
JUN 1 0 1985)
PLA1NIN
DEP'ARTWNT
The District staff has reviewed the above project and submits the following
comments:
1. The general notes, item 2,replace "to date of execution of utility
agreements", with "at the time of construction".
2. The manhole detail on sheet 9, shall indicate concrete adjustments only,
use ram-nec to seal shiplap joints and gout inside, and provide
Alok Gaskets or approved equal at pipe entry.
Should you have any questions, please feel free to call me at 226-3104.
Sincerely,
Mike DiTullio
District Manager
cc: Terry Farrill, Systems Engineer
Jim Allen, RBD
CONCEPTUAL REVIEW
STAFF COMMENTS
MEETING DATE: March 3. 1986
ITEM : Corral PUD - Amended
APPLICANT: Jack Hahn, c/o Cityscape Urban Design, 21 Old Town Square
Fort Collins, CO 80524
LAND USE DATA: Revise the plan to eliminate two industrial buildings
and substitute a church on 1.5 acres located north of
Huntington Hills, 500 feet east of College Avenue.
COMMENTS:
1. A power line is currently being installed by R.E.A. along the property
line.
2. Check with the Fire Department on available fire flow. Sprinklering
maybe required.
3. Off -site street improvements will be required.
4. Replatting of the lots into one should occur.
5. One parking space per five seats is suggested.
6. Motorcycle, bicycle and handicapped parking: -is required.
7. If the Planning and Zoning Board does not feel this matter should be
dealt with administratively, a PUD Amendment should be processed.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: �Vzl 191 DEPT: Engineering
PROJECT: � g , Czx ro-�
PLANNER:
ENGINEER: Sheri Wamhoff
R/ No Problems
Problems or Concerns (see below or attached)
yl =�7 \j
o- )e, \\A�j fA6-A\� vt
` d � qv�, 66J) ncd o k o-D t o chi Ck�x,, a 41
ve
Date: e -��; �,q
ignature
PLEASE SEND COPIES O MARKED REVISIONS: PLAT
SITE
UTILITY
LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: t=�, _;- ;,�� c DEPT: Engineering
PROJECT: ,?�L,
{ r < )
PLANNER: --- -- —
ENGINEER: Sheri Wamhoff
q _ No Problems
Lam' Problems or Concerns (see below or attached)
Corral Business Park Lots 7 and 8 February 22, 2000
My only remaining comment on this project is that the temporary construction easements on the west and
east side of the property are only valid from April 1, 1999 to March 31, 2000, per the documentation that
was provided. It is very unlikely that the work for this project will be completed by March 31, 2000.
Therefore new easements for the grading and construction of the retaining walls on the property lines are
needed.
Attached is a DCP application. This permit is needed before construction can start on the site.
Please let me know if there are any questions.
Date: ._-1 Signature.
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT
❑ SITE
❑ UTILITY
❑ LANDSCAPE