March 15, 1985
Skeet Davidson
c/o Pangtry Investment Builders
5900 Balconies »201
Austin, Texas 78731
Re: Cimmarron West PUD
Dear Mr. Davidson:
The intent of this letter is to followup on our conversation of last week.
In this discussion, I informed you that the City of Fort Collins does not
require of the developer any specific permits for the installation of
public improvements. We do require a developer to provide us with a set
of drawings prepared by a licensed engineer in the State of Colorado.
These plans are reviewed by various City departments for comments
relating to City design standards and construction specifications.
After these plans have received sufficient review by the City departments
they are given to the City Engineer for his signature. When a set of
drawings have been signed by the City Engineer, a project is then ready
for construction. In effect, the City views the approved set of plans
as the necessary permit to begin construction of the improvements as
shown on the plans.
No further permit is required until the start of the building structure.
However, prior to the release of any building permits, the Engineering
Department does require water and sewer mains with services be installed
and initially accepted, and an all weather surface roadway for emergency
vehicles be constructed.
When building_ permits are issued through our Building Department, they
then collect the plant investment, storm drainage, street oversizing
and various other fees required by the City.
>.L_ '.v.:....-.:...r'.. ... .....4': �a:_A.�via �`:.s,-•zi.�. w._r....�.�..s,:,.K-..y.F �,.£_�i.-. �:..r......:a.. s: t. s..�..:...,..A:`Y...a�_h.✓-i.:wn•I�:�W..J�e'rS1Y.!__a{�i��rl..f-..:.v �[.Jki��lle
ENGINEERING SERVICES 300 LaPorte Ave. P O Box 580 . Fort Collins, Colorado 80522 1303) 221-6605
Skeet Davidson
March 15, 1985
Page Two
Again, let me state that if you plan to construct the Cimmarron
',Jest Planned Unit Development in accordance with the drawings
previously aaproved by the City no further permits are necessary
for the construction of public improvements.
If you have any further questions, please contact me at (303) 221-6605
City of Fort Collins Engineering Division.
Sincerely,
David Stringer
Chief Construction Inspector
eid ]Burton Construetioi lompany, Inc.
301 EAST LINCOLN AVENUE P.O. BOX 905 FORT COLLINS, COLORADO 80522
FORT COLLINS (303) 484-4562 DENVER (303) 623-8151
June 6, 1985.
COLORADO STATE UNIVERSITY
Department of Animal Sciences
Ft. Collins, Colorado 80523
ATTN: MR. GARY GREATHOUSE
RE: IRRIGATION LINE
CIMARRON WEST
SHIELDS & DRAKE
Dear Mr. Greathouse:
This is to confirm our verbal agreement at the site on June 6, 1985, to
changes in drawings as prepared by Parsons & Associates for the above referenced
project to comply with Colorado State University's requirements. The irrigation
line is located on Shields street from approximate station 5 + 55 to approximate
station 10 + 00. The irrigation line is approved by Colorado State University
with the following modifications:
Manholes at station 5 + 55 and 9 + 90 will be changed to pressure manholes.
The existing 21" RCP pipe at approximate station 11 + 00 will be fitted
with a state highway flared end section with a bar screen and a smaller
screen attached to the bar screen. Directly in front of this flared end
section, a 4.6 CFS Mechanical Ditch Cleaner will be installed. 1 additional
4.6 CFS ditch cleaner will be provided to Colorado State University. The
installation of this line will be completed so that Colorado State University
may turn the water on by June 10, 1985. If the mechanical ditch cleaner
cannot be installed by the above date, the bar screen will be maintained
by the Contractor until the mechanical ditch cleaner is in place and working.
If you have any questions or disagree with the above, please advise immediately.
Sincerely,
REID BURTON CONSTRUCTION CO., INC.
Ed Rhoadarmer
P.S. Attached is a sketch with changes
cc: Bruce Hansen - Stewart Excavating Approved by:
Bill Havens Gary G athouse
Howard Durham - Woerner Properties Colorado STate University
file 321-FIB
Raju Jairam
phn dengler
and o"SS ,"o 'ates ,
r
A R C H I T E C T S/ P L A N N E R S
July 29, 1985
ENGINEERING DEPT. NOTE: "
Mr. Joe Frank THIS REPRESENTS THE BEST
City of Fort Col 1 ins Development Center nt.er QUALITY IMAGE POSSIBLE TAKEN
Fort Collins, CO - FROM VERY POOR QUALITY
ORIGINALS
Re: Administrative change/Cimarron West P XI D,
Dear Joe,
Following our phone conversation 1 as-tt week concev 1 i n 9 are adru in i>trati ve c han9e to the
above referenced project, we present you with the lFollowing energy saving features that
are in addition to those mentioned on the final PAI.D. site plan and that you will find
in the final construction documents for the corresponding buildings currently under
review in the Building Inspection Department:
a) foundation perimeter insulation (]l'lits i
" rigid) at the garden level unrl t:he
12-plex buildings
-•., b) Aluminum windows with "thermal --break" frames
c) 321 batt insulation between floors
A) Fireplaces are in approximately 1/3 of the total units and have outside
„ combustion a=r as well as indoor convection heating.
We feel that these additional features should more than compensate for the R-14.5 exterior
walls in lieu of the R-15 walls specified on the final P.U.D.
Thank you.
Sincerely, -
/•jh
tD g r I
JJD/mmd
748 WHALERS WAY / BLDG. E SUITE 200 / FT. COLLINS CO. 80525 2 2 3 - 1 512
JCR-�IVIL ENGINEERING / CONSTF, -3TION MANAGEMENT
ENGINEERING JOSEPH C. ROESSER JR., P.E. / PHONE (303) 4B4-5463
211 West Myrtle, Fort Collins, Colorado 80521
December 1, 1981
Philip Waite, Civil Engineer
City of Fort Collins
Engineering Division
P.O. Box 580
Fort Collins, CO 80522
Dear Mr. Waite:
Referencing the final grading plan for the Cimarron West PUD
(pg. 11 or 21, signed by City Officials on 2/20/81), this is a
formal request for approval to reroute the designed 15" diameter
RCP storm drain (Raintree Drive flowing west along Drake Road to
the flared end section).
The Storm Water Drainage Report for Cimarron West PUD (January,
1981) indicates that the two year release rate for the 4.59 acre
basin "A" (currently designed to flow to the 15" diameter RCP and
west) would be 1.07 cfs. It is proposed that a 15" diameter RCP
be constructed running east from the east rim of the designed detention
pond, with use of a restrictor to allow only 1.07 cfs to flow to the
new catch basin at Drake Road and Shields Street.
Please respond in writing at your earliest convenience. If
any further discussion is necessary, please call me.
Sincerely,
' Z' �--A � ". � �6 C �"',4�.' ��"
Joseph C. Roesser, Jr., PE
JCR:pah
155 N. COLLEGE AVE/ SUITE 224 / FORT COLLINS / COLORADO B0521
(.I 1 Yam() ff ()1?-.„,r.-�..,
I ( ( t I I'NS
i/.Gii'!,�':iSW�:.dei.:^'.5V': ]n-•.�••,h�fnG;: 'WxArk�.i:,:'::fi
ENGINEERING DIVISION
December 3, 1.981
Mr. Joseph C. Roesser, Jr., P.E.
JCR Engineering
211 West Myrtle
Fort Collins, CO 80521
Dear Mr. Roesser:
In reference to your letter to this office dated December 1, 1981
regarding the drainage at Cimarron West P.U.D., I have these ccarments.
Your request to re-route the historic release from the detention pond
in Basin "A" to the new curb inlet at the southwest corner of Drake
and Shields seems reasonable. After investigating the as -built
capacity of the new storm drain it was found that these is enough
capacity to handle the additional 1.07 cfs you intend to route into
the inlet.
Approval fran the storm drainage department is hereby granted
provided the revised design meets City of Fort Collins standard
specifications for the construction of storm sewer.
Sincerely,
Robert W. Smith
Assistant City Engineer - Drainage
cc: Mauri Rupel
.�Z
CITY OI I(MI (OHINS
ENGINEERING DIVISION
January 6, 1982
Mr. Joe Roesser
JCR Engineering
211 W. Myrtle
Ft. Collins, CO
Dear Joe:
P.O. Box 580, Fort Collins, Colorado 80522
Ph(303) 484-4220 Ext. 728
We have finished the review of Ciitmaron Plaza P.U.D. and Cimnaron
West amendment. There are some minor revisions which we must request
and therefore we would like to have an appointment with you. These
revisions are required to be approved by the City before the project
will be permitted to proceed to the Planning and Zoning Board. If you
would like to delay the project for another month, please send the
Planning Department a letter stating that request.
Yours truly,
t
Josh Richardson
Civil Engineer