Loading...
HomeMy WebLinkAboutCEDAR VILLAGE FOURTH - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31J , (A 1_1.\ti 12 December 11, 1979 Sterling Paving Companies Attn: Dale Miller 1800 % Taft IH 11 Road Fort Collins, Colorado Dear Dale: This letter is to inform you that the Construction Inspection Department has made field inspections on the following subdivisions in order to determine the feasibility of installing pavements. Voodlands P.U.D. Cedar Village 4th Rossborough Golden Meadows 2nd Larkborough Four Seasons Aspen Knolls Site investigations wade on December 10 and 11, 1979 revealed that in all cases the in -place base material was completely penetrated by frost. It was also found that We sub -grade material contained frost in varying depths ranging from o5 to greater than 1.2 feet. Sue to the frozen state of the base and sub -grade materials at this time, we request that placement of asphalt pavements on the above listed projects be delayed until the spring of 1980, or until the weather becomes consistently warm enough to completely remove all frost and allow stabilization of the existing materials. It should be noted that the City Specifications state: No surfacing shall be placed unless the atmospheric temperature in the shade is at least forty (40) degrees F. and rising, and other weather conditions are suitable. In no case shall pavements be laid on foundations in which frost is present. If you have any questions or when you feel the weather will allow you to resume construction, please do not hesitate to call me at your convenience. sVery truly yours, Rodney R. Albers Construction Inspector cc: Roy Bingran, Director of Engineering Services Dave Stringer, Chief Construction Inspector C Wri P,upel, Development Engineer