Loading...
HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY PUD EIGHTH - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31THE ARROWSTONE COI ]RATIONS CommerCentre P.U.D. STATEMENT OF PLANNING OBJECTIVES CommerCentre is located on five acres at the southeast corner of Worthington Avenue and Centre Avenue within The Centre for Advanced Technology. Immediately to the east of CommerCentre is the 2301 Research Boulevard Building commonly referred to as the Nielson Building. Vacant land adjoins on all other sides, with parcels immediately to the north and southeast currently going through the planning process. CommerCentre is planned as a three -building complex to be compatible with the intention and land use for The Centre for Advanced Technology. The development will be a flex space office, research, and manufacturing facility totaling 77,168 square feet. Phase 1 will be a 21,000 square foot single story building. Phase 2 will be a 36,080 square foot two story building. Phase 3 is a 20,088 square foot single story building. All buildings will conform to the covenants of The Centre for Advanced Technology and be architecturally attractive and well landscaped. The interior of the site will be delineated by vehicular auto parking and circulation around the perimeter and truck service areas in the center providing safe access to the three buildings for safe personal activity. Each phase will be self-contained to accommodate parking requirements and truck vehicular traffic circulation within the entire plan of CommerCentre. This development will be built with coordinated materials and present a well -landscaped appearance to adjacent parcels and rights -of -way as was Cimarron Plaza, Arrowstone's first Ft. Collins project. The materials will be primarily masonry and glass as shown on the enclosed rendering. It is estimated that the tenants of CommerCentre will employ 180 full-time and 30 part-time employees. The planning objective of CommerCentre can be summarized as follows: We wish to create and enhance the perceived image that The Centre for Advanced Technology is the major research and technology park for Northern Colorado and Ft. Collins in particular. THE ARROWSTONE = JRATIONS DEVELOPMENT PHASING SCHEDULE CommerCentre will be developed within a four (4) year time frame to total 77,000 square feet. Phase 1, a 21,000 square foot building, will begin construction in June with occupancy in the late fall. Phase 2, a 36,080 square foot office and research facility, will begin in 1989. The Phase 3 building of 20,088 square feet will begin either simultaneously with the Phase 2 building or in 1990 with completion in 1991.