Loading...
HomeMy WebLinkAboutHAR SHALOM MINOR SUB - Filed CS-COMMENT SHEETS - 2003-07-31/4Fri Dori Hisam, Fire Prevention Bureau TO: Roger Krempel, Director of Public Works Jim Hibbard, Systems Engineer Stan Case, Director of Utilities Curt Smith, Chief Planner ,,-1aurice Rupel, Development Engineer FR0M: t,Ji l l i am E. Waldo, Chief Building Inspector RE: Exception to Subdivision platting requi renients : Section 99--3B (3) Code of the City of Fort Collins The attached letter gives the legal description of the particular tract of land on which a �E��. o of t1K -At RL z_o,,e i s proposed. lJi 11 you review Section 99-3 V 3 he Code of Fort Collins and advise if all requirements of subparagraph (a), (b), and (c) have been met so that a building permit may be issued. Please make a comment to the Building Inspection office at your earliest convenience. OyLQ a, 4 T-A j P4 D F T j f�v7iJ��H rd4 L / 'Zt A. NO R4cvf& ,n��ds -f ' 1b rA,4aA s e s A, 040 ,l��s�y — o r 4-c wvvJu os+ I l C� 1 >,d- SIs Ttsy eA: Project Comments Sheet S City of Fort Collins Selected Departments Department: Date: March 26, 2008 Project: Congregation Har Shalom All comments must be received by Peter Barnes in Zoning, no later than the staff review meeting: No Review Date Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 19 Created: 12/13/2007 [3/26/08] 1 don't believe an access easement deed of dedication document was prepared or that "access" was added as an additional use to the 15' utility easement, based upon the documents I received. [12/13/07] With the new 6' sidewalk shown outside of right-of-way onto private property, Please provide an access easement to ensure the sidewalk is within access easement where not within right-of-way. As an option, the proposed 15' utility easement can just access easement as an additional use. Number: 20 Created: 12/13/2007 [3/26/081 Assuming I'm using the correct and latest documents, a closure check was done on the three deeds and they were fine, with the exception of the drainage easement -- the legal description used a caret symbol instead of a degrees symbol. The deed of dedication documents themselves all state that each deed is for "utiltiies and drainage facilities". Please ensure that separate documents dedicating easements for "drainage", "emergency access" and "utility and access" are provided. (Also note that Exhibit "A" for the utility easement along Drake Road should be specified as "utility and access" easement. Please ensure that a $750 transportation development review fee is paid for the processing of the three easements. [12/131071 The utility(/access?) easement and the emergency access easement requires $250 TDR Fee each for the processing of the easement dedications. In addition, recording fees made out to Larimer County Clerk and Recorder will be required — this amount will be determined upon finalization of these documents. I have not done a closure check on these documents at this time but will do so shortly. G G,', Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page 1 Number: 26 Created: 12/13/2007 [3/26/08] The construction drawings are titled "Har Shalom Minor Subdivision Lot 1, Parking Lot and Drive Expansion" while the site plan specifies a title of "Congregation Har Shalom Driveway and Parking Expansion", please coordinate the same title on both documents. [12/13107] Please coordinate the title of all the documents (site, landscape, construction) to be the same. As the legal description of the site is Lot 1 of the Har Shalom Minor Subdivision, I'd suggest something similar to Har Shalom Minor Subdivision, Lot 1 Modular Expansion. Number: 34 Created: 3/26/2008 [3/26/08] Per email discussion with Peter Barnes and Bud Frick, please ensure that the site plan does not show the future potential buildings, but the relocation of the existing modular information can remain. Number: 35 Created: 3/26/2008 [3/26/08] In checking with Engineering Inspection, an excavation permit will be required instead of the more indepth development construction permit. Upon having signed drawings, the City Engineering Inspector will determine inspection fee amounts as part of the excavation permit. Upon payment of the amount, construction can then commence. Number: 36 Created: 3/26/2008 [3/26/08] Redlined deeds of dedication are being returned along with a comment letter from Engineering. With these corrected, the documents can then be returned, filled out and signed by the grantor and the grantor's attorney. These completed deed documents along with the TDR fee of $750 and a check for recording fees in the amount of $63, made out to Larimer County Recorder, will allow us to process and record the easements and in turn sign off on construction plan mylars. Page 2