ENGINEERING DIVISION
December 3, 1982
Congregation Har Shalom
725-W. Drake Road
Fort Collins, Colorado
TO WHOM IT MAY CONCERN:
I have been informed by the Poudre Valley Fire Authority that
the fire hydrant adjacent to your property needs to be -adjusted.
Due to the construction of the landscaping berm, the distance
from the pumper nozzle is not correct. The elevation from the
center of the large nozzle should be sixteen (16) inches minimum.
Two alternatives to correct this situation are:
0 Extend the fire hydrant to the proper height with a manufacturer's
extension section.
0 Slope the landscaping away from the hydrant to allow for adequate
access and height.
If you have: any questions, please contact me at 484-4220, extension 728.
Sincerely,
David Stringer
Chief Construction Inspector
cc: Jim Hibbard
determined upon finalization of these documents. I have not done a closure check on these
documents at this time but will do so shortly.
Number. 22
[12/13/071 The construction details use a LCUASS version at has been ut of date.
Please revise the details to reflect the LCUASS drawings adopted in April 2007.
Number: 24
Create07
[12/131071 Due to weather conditions and constraints a site visit to look at existing.
conditions was not conducted. I will follow up with any field observations or concerns
conditions permitting.
Number.,25
`�
[12/13/07] Cana 2' retaining wall on the east Created: 12113/2007
boundary and not require encroachment onto the Property
to he ne be built
t such that that awithin n
property
easement is needed? Couldn't the footers itself encroach onto the neighboring property.
Number: 26
Created: 12/13/2007
112113/071 Please coordinate the title of all the documents (site, landscape, construction) to
be the same. As the legal description of the site is Lot 1 of the Har Shalom Minor
Subdivision, I'd suggest something similar to Har Shalom Minor Subdivision, Lot 1 Modular
Expansion.
Department: Forestry
Topic: Genera! Issue Contact. Tim Buchanan
r�--pe Number..27
(f [12/14/071 there are 10 mitigation trees that are required for he p piosed tree removals.
There appears to be locations to accommodate these trees along Drake between the
sidewalk and curb, on the eastt side of the project between the new drive and fence and on
the south side between parkin and the fence.
Department: Light &Power Topic: Electric Issue Contact: Doug Martine
Number: 8
11l26/07 Created: 11/26/2007
[ ] This comment is not a condition of approval, just a heads -up to the owner. The
existing electric service provides for a 780 amp, 120/240 volt single phase service. If this
needs to change, please contact Light & Power Engineering at 221-6700.
Department: PFA Topic: Fire Issue Contact: Carle Dann
Number. 11
[12J13/07] Thank you for adding the Eme07
ss Easement Plea
rgency Accese show its
location on the Overall Utility Plan, as well as the separate plat. As the project continues and
new structures or new additions are proposed, PFA will review plans at that time. Thank
you.
Department. Traffic Operations
Topic: Traffic
Number: 9
112/10/07] No issues.
Page 2
Issue Contact: Ward Stanford
Created: 12/1012007
Page: 2
a Number 4 AuVier. Bud Fdl
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 12
(12113/071 The detention pond's depth to the 100-yr W ErL Is deeper than the 1 foot
maximum. Please try to reduce this depth and request a variance if the depth is still over 1
foot
Lv--F Number.13 Created:12/13/2007
112/131071 The detention pond needs a emergency spillway set at the 100-yr WSEL of
39.14. As currently designed, the pond could be over 2 feet deep before it would spill.
Number. 14 Created: 12/13/2007
[12/13/071 The retaining wall needs to be water tight since the wall will be holding back
detention water. Also, the entire retaining wall needs to be located on site, including any
footers that may be needed. As shown on the grading plan, any footers would most likely
extend into neighboring properties.
[Number: 21 Created: 12/13/2007
02/131071 A drainage easement is required for the limits of the detention pond.
Number., 23 Created: 12/13/2007
[12/13/071 Water quality is not being proposed for this project. Water quality is required for
any new impervious area and this needs to be discussed.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Top/c: Water/Wastewater
Number. 28
Cre112/18/071 Will the future buiding noted near Drake replacer e modular b� dings?
_r---Q Number:29 Created:12/18/2007
112118/071 Can the sewer service shown for the south modular connect to the existing 4-
Inch service rather than the 12-inch sewer main?
Department: Zoning Topic: Planning Issue Contact: Peter Barnes
Number. 10
112/13/071 Per Ted Shepard: See redlined drawings regarding landscape comments.
f=ps Topic: Zoning
Number: 1
Created: 11/23/2007
[11/23/071 Label the parking stall dimensions on the site plan. (The new compact spaces
are labeled but not the others),
e umber.2 Created:11/23/2007
[11/23/073 Show dimensions of relocated modular ant the 8280 s.f. building footprint on site
Plan. The dimensions of the 2008 addition or new building are shown, but they aren't
legible. Also show setback distances from footprints to lot lines.
� Number.3
[11/23/071 The landscapeCreated: 11/23/2007
plan shows mulch, but need to describe what kind of mulch.
Page 3
Page: 3
Number, 1 Aulbar.'t Ftic Su : Stlticy NOW Dale: 2/21MM 1:57:08 PM
Np. 12, 13, 14 a 23 Revisaa per meeting w/ t w.. e........ ... .. _.
— Numbed
PM
B Number.7
Number:4
11123/207
111/23/071 Decidious trees are required to be planted on perimeter parking of landscape
strip along south and east lot lines at 1 per 40' per Section 3.2.1(E)(4)(a). A 6' tall privacy
fence is required along south lot fine for parking lot screening per 3.2. 1 (E)(4)(b).
Number:5
Created. 11/23/20
W 111/23/071 Each parking lot Island must be landscaped inaccordance wi hOSection
3.2.1(E)(5).
Number: 6
f=[1 [11/23/071 Is he trash enclosure being relocated? Location isn't labeled0 n7
"proposed site plan". anywhere on
Number. 7
Crsat
the north, Landscape west
sides
should include a'future phase" forrtthe foundation treatment on
the north, east, and west sides of the 8280 s.f. footprint building. Or, at least the landscape
plan should include the "future building footprint" on the plan with a note indicating that
landscaping required for future building will comply with he code in affect at the time of
Permit application and be processed by minor amendment.
Be sure and return all of your redfined plans when you re -submit,
If you have any questions regarding these issues or any other issues related to this project,
Please feet free to call me at (970) 416-2355.
Sincerely,
/9,tw, 4 ew4 ,
Peter Barnes
Zoning Administrator
Page 4
Page: 4
— Number. 1 Authm: Bud Fddk Sue : Sa Nob Date: 2/2 V1003 2:04,07 PM
No. 4 T(Se have been noted along the East and aoum propery.nee. The Scum property acre does not DeyoM. mquae a fence ae to that side from. on a Impaaon Mob and a park
Number. 2 Aumor. Bud Frick SubjeU Sticky Note Data: 2/21/2006 2.W:36 PM
NO. S Dotre
— Number. 3 Author. Bud Frfk Stl Note Date: 2f11/200a 2.OS:31 PM
No. 8 The exisanp tre.h endoaure will rameln al a's ezlong Iooa0on noted on me alto plan.
be induded waft
K A
4
congregation
Har Shalom
June 29, 1993
Planning Director
City of Fort Collins
281 N. College Ave.
Fort Collins CO 80521
Dear Sir:
Jack S. Gabriel
Rabbi
This letter provides supporting information for the Minor Subdivision application by
Congregation Har Shalom. We presented our plans at a Conceptual Review on May 3, 1993, at
which time a number of issues were raised. Since then we have discussed each of those issues
with the appropriate; City staff people and reached agreements on how we will meet their
requirements. In some cases we were asked to write a letter with further details. This letter
incorporates all of the requested letters and agreements.
Our immediate plan is to add a modular building to the property to increase our classroom space
both for our Sunda}, school and for our tenant, River Song School. We are also working toward
the construction of at permanent classroom wing to be built within 5 years. The building permit
application for the modular building will address the addition of a week -day school to our current
church use, including access, fire alarm and restroom requirements. Utility requirements are
addressed in the following paragraphs.
Street Improvements
Construction of a curb, gutter and sidewalk along Drake Road were deferred at the time our
present building was built. Since then a sidewalk has been installed. We will install curb and
gutter before installation of the modular building. Plans for the curb and gutter, prepared by
Stewart and Associates, are included with this application.
Water and Wastewater
The modular building will contain no plumbing. No changes to our existing water and sewer
services are planned.
Storm Drainage
We met at the site with Kate Malers to discuss the options for storm drainage. We will be adding
about 1000 square feet of building area, plus about 100 square feet of sidewalk. There is
currently no onsite retention for storm water, but our parking lot drains to the 66 inch storm
sewer that runs under the property. It was agreed that, for the modular building, routing the roof
725 West Drake Road • Fort Collins, Colorado 80526 0 (303) 223-5191
drains onto the parking lot surface would provide adequate drainage. This will be noted in the
building permit.
Traffic
We were requested w provide information on current and projected traffic going to and from our
property during week days. River Song School is highly committed to car pooling, and has a
parent volunteer in charge of maintaining and coordinating a car pool list. In addition, several
families have more than one student in the school. Therefore, the number of vehicle trips is
significantly less than the number of students.
At present, there are approximately 25 cars that arrive and depart each morning between 8:15 and
8:30 to drop off children. Half of these cars return at 12:30 to pick up half -day students, and the
other half return at 3:00. In addition, there are about 3 cars for River Song staff members that
arrive at 8:00 and depart between 4:00 and 5:00. An additional 2 cars for synagogue staff arrive
at 1:00 and depart at 5:00. About 5 cars on average arrive and depart each afternoon on
synagogue business.
In the future there will be gradual increases in the number of cars arriving for River Song. Next
year there will be 30 to 35 cars each morning, and the following year about 40 cars. The pick
ups will continue to be split fairly evenly between the 12:30 and 3:00 times.
Street Oversizing
Street oversizing fees were paid at the time the present building was constructed.
Fire Access
The Poudre Fire Authority has indicated that the existing 80 foot diameter turning circle is
adequate for their needs. Installation of the modular building will not alter the turning circle.
Electricity
No change in our electric service capacity is anticipated.
We hope to get a building permit in August so that we can have the modular building installed
when school starts on August 30. Since this request is fairly uncomplicated, we hope you will be
able to act on it quickly. We appreciate the assistance that City staff members have given us so
far, and will respond promptly to any questions you may have.
Sincerely,
A4L-141001
Gary pivak, Secretary
Congregation Har Shalom
congregation
Har Shalom
Mr. Tim Blandford
Project Engineer
Engineering Department
201 North College
P.O. Box 580
Fort Collins, CO 80522-0580
Dear Tim,
Jack S. Gabriel
Rabbi
August 18, 2000
This letter describes the details discussed in a meeting on August 14, 2000
attended by;
Cam McNair, Director of Engineering
Tim Blandforq Project Engineer
Al Koppel, Chairman, Facilities Planning Committee
Neil Sherrod, Facilities Planning Committee
Congregation Har Shalom (CHS), 725 West Drake owns a site in the Woodwest
5th filing, a minor subdivision (97262443901). Presently, a sanctuary is
located on this site as well as two (2) modulars (these will be removed
upon erecting the new building). CHS needs to expand on this site due to the
influx of new congregants and is planning to add a two-story building (appr.
15,000 SF) to house classrooms, faculty offices and a social hall.
We have asked for a variancg,to allow for space for our proposed improvement,
from the 57.5 foot reqirement from the centerline of Drake to our existing
property line. This was agreed to by all parties present.
It was also agreed by CHS to accept a fifteen (15) foot utility easement from
the property line of CHS for potential future utilities.
It is planned to begin building the project in approximately two to three
years.
The aforementioned variance and utility easement was approved by Cam McNair.
We would appreciate if you would confirm all this to us.
Thank you for your assistance.
Sincerely,
Al Koppel
Chairman, Facilities Planning Committe
cc Ron Sladek, President of the Board of Directors
Cam McNair, Director of Engineering, City of Ft. Collins
725 West Drake Road • Fort Collins, Colorado 80526 • (970) 223-5191
Transportation Services
1,; 11 nrcrin,g I)cp'IriIII cnt
Citvof Fort Collins
Mr. Al Koppel
Chairman, Facilities Plaaaigq Committee
Congregation Liar Shalom
725-West-Drake--Roar}-
Fort Collins, CO 80526
RE: Drake Road Right -of -Way Adjacent to Har Shalom
Dear Mr. Koppel.
The intent of this letter is to confirm the recent discussions we had at our meeting
on August 14, 2000. In this discussion, I understood that Har Shalom intends to
expand its existing site by an additional 15,000 square feet in the next 2 — 3
years. This addition raises the issue of the City requiring additional right-of-way
dedication for (Drake Road, which could have a significant impact on your already
constrained site.
I am glad to affirm that, in that meeting, the City did agree to waive the
requirement for additional right-of-way along Drake Road as it relates to this
proposed expansion of class rooms, faculty offices and a social hall. In addition,
Congregation Har Shalom has agreed to dedicate a 15-foot wide utility
easement, measured from the north property line of CHS, which is also the
southernmost Drake Road right-of-way line. This confirms the accuracy of your
letter dated August 18, 2000.
Thank you for discussing this issue with staff and myself, and I look forward to
working with your organization in the future.
Sincerely,
L��`�
Cam McNair, PE
City Engineer
Attachment
cc: Dave Stringer, Development Review Manager
... i h' •fn �.�••n n� �. ... en ;, ,I t.���llim,!�ll'0�_�-U�ftfl Iq-11?�_I-I�hOS P:1\(`I'�II) I n��8
�cw�c�i-fort rnilm"o-n>
Transportation Services
Engineering Department
City of Fort Collins
Mr. Al Koppel
Chairman, Facilities Planning Committee
Congregation Har Shalom
725 West Drake Road
Fort Collins, CO 80526
RE: Drake Road Right -of -Way Adjacent to Her Shalom
Dear Mr. Koppel:
The intent of this letter is to confirm the recent discussions we had at our meeting
on August 14, 2000. In this discussion, I understood that Har Shalom intends to
expand its existing site by an additional 15,000 square feet in the next 2 — 8
years_ This addition raises the issue of the City requiring additional right-of-way
dedication for Drake Road, which could have a significant impact on your already
constrained site.
Fam glad to affirm that, in that meeting, the City did agree to waive the
requirement for additional right-of-way along Drake Road as it relates to this
proposed expansion of class rooms, faculty offices and a social hall. In addition,
Congregation Her Shalom has agreed to dedicate a 15-foot wide utility
easement, measured from the north property line of CHS, which is also the
southernmost Drake Road right-of-way line. This confines the accuracy of your
letter dated August 18, 2000.
Thank you for discussing this issue with staff and myself, and I look forward to
working with your organization in the future.
Sincerely,
Cam 2PE
City Engineer
Attachment
cc: Dave Stringer, Development Review Manager
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.ci.fort-collins.co.us
congregation
Har Shalom
Mr. Tim Blandford
Project Engineer
Engineering Department
201 North College
P.O. Box 580
Fort Collins, CO 80522-0580
Dear Tim,
Jack S. Gabriel
Rabbi
August 18, 2000
This letter describes the details discussed in a meeting on August 14, 2000
attended by;
Cam McNair, Director of Engineering
Tim Blandford Project Engineer
Al Koppel, Chairman, Facilities Planning Committee
Neil Sherrod, Facilities Planning Committee
Congregation Har Shalom (CHS), 725 West Drake owns a site in the Woodwest
5th filing, a minor subdivision (97262443901). Presently, a sanctuary is
located on this site as well as two (2) modulars (these will be removed
upon erecting the new building). CHS needs to expand on this site due to the
influx of new congregants and is planning to add a two-story building (appr.
15,000 SF) to house classrooms, faculty offices and a social hall.
We have asked for a variance,to allow for space for our proposed improvement,
from the 57.5 foot reqirement from the centerline of Drake to our existing
property line. This was agreed to by all parties present.
It was also agreed by CHS to accept a fifteen (15) foot utility easement from
the property line of CHS for potential future utilities.
It is planned to begin building the project in approximately two to three
years.
The aforementioned variance and utility easement was approved by Cam McNair.
We would appreciate if you would confirm all this to us.
Thank you for your assistance.
Sr c_ rely,,
!' J
Al Koppel r
Chairman, Facilities Planning Committe
cc Ron Sladek, President of the Board of Directors
Cam McNair, Director of Engineering, City of Ft. Collins
725 West Drake Road • Fort Collins, Colorado 80526 • (970) 223.5191
91
Bud Frick
526 S. College Ave
Fort Collins, CO 80524
F
STAFF PROJECT REVIEW
Date: 12/18/2007
Staff has reviewed your submittal for Congregation Her Shalom, and we offer the following
comments:
ISSUES:
Department: Engineering Issue Contact: Marc Virata
Topic: Genera!
Number. 15 Created: 12/13/2007
[12/131071 1 was understanding that the submittal was for driveway construction (and not for
the new modulars) and responded to a question regarding TDR Fees indicating that building
square footage would not be applied. As a result of the modulars being proposed on the
southeast portion of the site, an additional TDR Fees amount of $525 is needed.
Number. 16 Created: 12/13/2007
112/131071 The future building along Drake specified to be built in 5-10 years in checking
with Peter Bames will need to go through a process of its own in the future. The footprint
notation should be removed on the drawings in order to not require the payment of TDR
Fees for this building at this time. In checking with Stormwater, the building square footage
can be accounted for in the drainage report and not shown on the construction drawings for
demonstration purposes to Stormwater of potential expansion in the future.
Number: 17 Created: 12/13/2007
[12/13/071 The 2' retaining wall along the southern boundary of the property abutting the
parking stalls is problematic as the depth of the parking stalls at 17' is not deep enough with
the inability to overhang due to the retaining wall. The parking stall depth needs to be 19'
where it abuts the retaining wall.
Number 18 Created: 12/13/2007
112/13/071 The construction drawings differ from the site and landscape plan drawings
regarding the sidewalk design behind Drake Road. Please coordinate. The meandering
shown in the sidewalk on the engineering drawings to tie into the existing sidewalks is fine,
though please look to have the sidewalk west of the western driveway at 6' in width similar
to how it was designed east of the eastern driveway.
Number: 19 Created: 12/13/2007
[12/13/071 With the new 6' sidewalk shown outside of right-of-way onto private property,
please provide an access easement to ensure the sidewalk is within access easement
where not within right-of-way. As an option, the proposed 15' utility easement can just
access easement as an additional use.
Number. 20 Created: 12113/2007
[12/13/071 The utility(/access?) easement and the emergency access easement requires
$250 TDR Fee each for the processing of the easement dedications. In addition, recording
fees made out to Larimer County Clerk and Recorder will be required -- this amount will be
Page f